Croton-on-Hudson Engineering Department Organizational Assessment 2.5.25 Presentation
presentation
17 pages
Meeting: portal event 1015 (no meeting page on file)
Agenda item: Discussion and Review of the Engineering Department Study
Presentation, 17 pages. Attached to agenda item: “Discussion and Review of the Engineering Department Study”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Croton-on-Hudson Engineering Department Organization...
Extracted text
ENGINEERING DEPARTMENT
ORGANIZATIONAL AND OPERATIONS ASSESSMENT AND PLAN
Village Board of Trustees Meeting
February 5, 2025
APPROACH
●Met and interviewed department staff
●Conducted analysis of current workload, operations
and trends
●Comparative review of functional alignment and
organizational structure with other villages
●Interviewed and collected surveys from Village
stakeholders
●Evaluated the strength and challenges of the
department
●Incorporated operational best practices
Functional Area
Description
Village Infrastructure
Engineering Services
(10% of 1 full time
engineer)
The Village Engineer’s Office provides assistance for special projects
Prepare design, scope and specifications for small Village projects.
Oversee and manage contract engineers used for Village projects.
Conduct assessments of the condition of Village infrastructure as requested.
Superintendent of Public Works – primary responsibility for asset management &
engineering services..
Land Use Planning and
Development
Conduct site plan technical reviews of proposed land use projects.
Support Village community development efforts.
Provide professional and administrative support to the Planning Board, ZBA, the
Water Control Commission and other Village advisory boards.
Coordinate and manage large development project.
NYS Uniform Fire
Prevention & Building
Code and NYS Stretch
Code
Review construction plans & issue building permits for construction projects.
Conduct construction inspections and issue Certificates of Occupancy.
Conduct Building Safety Inspections for assembly spaces; multi-family buildings
and occupied non-residential buildings.
Address non-compliance with Codes: voluntary compliance.
Village Codes
Administer and enforce the Village Zoning Code.
Administer and enforce Village Codes including: tree removal, property
maintenance, sidewalks, signage, flood damage prevention, etc.
Real Property
Assessment
Establish values of real property & prepare annual assessment rolls.
Maintain exemptions.
Provide technical support to the Board of Assessment Review.
CURRENT ENGINEERING DEPARTMENT FUNCTIONS
KEY OBSERVATIONS AND CONSIDERATIONS
●Department recognized for excellent service delivery, technical expertise and responsiveness.
●Core of the department operations:
o Land use planning/project management.
o Enforcement of codes related to the built environment and quality of life.
●Increasing workload and complexity
o
Building and fire code workload - larger projects, multi-family housing, energy code
o Potential 90% increase in fire safety inspections from 2020 to 2027.
o Planning and development - Increase in projects related to land re-use; protection of
natural resources, waterfront development, multi-family housing, affordable housing
o Proactive Village policy agenda also impacting workload.
Affordable housing; accessory dwelling units; frequency of multi-family housing
inspections, focus on property maintenance, environmental protections.
STRENGTHS
One-stop-shop for land use and building
planning, development and code enforcement
Technical engineering expertise
Knowledgeable staff
Responsiveness to residents & stakeholders
20+ years of stability due to same department
head.
Quality planning and oversight of development
projects.
Cross training and cross certifications
WEAKNESSES
Retirements/ transitions/ succession planning
Wide span of department functions
Inability to meet current workloads
Competing demands
Inconsistencies
Limited technology optimization
Competing demands
Limited backup resources
Frustration with enforcement tools
Reactive rather than proactive code administration and
enforcement
Flat organizational structure
OPPORTUNITIES
Preparing for the future from a position of
strength
Expand staffing levels to stabilize operations
Retain One-Stop-Shop alignment of functions
Create hierarchical structure
Institutionalize practices and procedures
Enhance management tools and practices
Workflow technology solutions
Enhance proactive enforcement program
THREATS
Loss of institutional knowledge through departures
Continuous expansion of NYS code requirements
Significant increase in workload
Increasing community expectations
Expanded Village codes
Safety concerns “falling through the cracks”
Increased expectations
Fiscal challenges
Code non-compliance
SWOT
SWOT
KEY OBSERVATIONS AND CONSIDERATIONS
STRATEGY RECOMMENDATIONS
KEY OBSERVATIONS AND CONSIDERATIONS
OPTIONS CONSIDERED:
1.
Status quo
2.
Re-constitute the Engineering Department as the
Planning, Zoning, Building and Codes Department.
3.
Consolidate the Engineering Department within the
Department of Public Works.
4.
Extract the land use planning and development functions
and place with an alternate village department or create a
new stand-alone department.
STRATEGY 1: FUNCTIONAL RE-ALIGNMENT
EARLY ON IN THE PROCESS, THE VALUE OF THE ONE-STOP SHOP FOR LAND USE PLANNING,
ZONING AND CODES EMERGED AS THE PREFERRED ALIGNMENT OF FUNCTIONS.
●Mission focus: land use planning and health
and safety of the built and physical
environment (90% of current operations).
●Maintain customer focus: one-stop-shop.
●Effective and efficient alignment of
department workload and staffing.
Functional Alignment Goals
●Maintain and build on the strengths of the department.
●Increase Code Compliance and timeliness of compliance.
●Address workload issues.
●Build in department resiliency and staff supervision.
●Optimize the alignment of engineers assignments to their technical
training and skills.
Functional Alignment Components
●Maintain the core mission of the department: land use planning and codes.
●Complete the shift of the engineering services to public works.
●Consider consolidation of the Assessor function at the town level.
o 70% of NYS villages no longer perform the property assessment function.
o Study outlines the legal process and outlines considerations in your decision making.
`
KEY OBSERVATIONS AND CONSIDERATIONS
Strategy 2: Organizational Restructuring and Staffing Improvements
●Director of Planning, Buildings, Zoning and Code Enforcement: Engineer, an architect or a municipal
land use planner, with relevant license/certification, experience and progressive responsibility.
●Maintain Assistant Building Inspector/Engineer (PE) reports to the Director, duties: 1) Building permit
application and building plan reviews and construction inspections; 2) Engineering site plan reviews and
project monitoring; 3) Staff assigned boards; 4) Consult with land owners/contractors.
●Establish a Codes Compliance Division
o Proposed NEW Assistant Building Inspector (working supervisor) that reports to the Director.
Provide supervision over the fire inspector and the code enforcement officer.
Perform construction permit reviews, construction and fire safety inspections.
Enhance operating procedures and proactive compliance and enforcement measures.
o The fire inspector and code enforcement officer would continue with their current job duties.
o Require NYS Code Enforcement Officer certification for all professional staff.
o Cross train staff in the Codes Compliance Division.
●Retain Administrative Staff and Staffing Levels; refocus to workflow automation.
Organizational Structure
Organizational Redesign Phasing
PHASE I: STABILIZE DEPARTMENT OPERATIONS
PHASE II: ADVANCE THE DEVELOPMENT OF THE RESTRUCTURING
●Consider creation of proposed Assistant Building Inspector Position.
●Determine Public Works Needs for engineering assistance.
●Evaluate capacity of Assistant Building Inspector/Engineer to provide engineering support
to Public Works.
●Make determination and timing on the consolidation of the assessor’s function.
PHASE III: FORMALIZE THE CREATION OF RE-STRUCTURED DEPARTMENT
●Make the necessary Village Code amendments.
●Consolidate the Assessor’s function at the Town of Cortlandt (or create a stand-alone
operation reporting to the Village Manager).
●Formalize the “Village Engineer” role in the Department of Public Works and make the
necessary Village Code amendments as necessary.
KEY OBSERVATIONS AND CONSIDERATIONS
Strategy 3: Department Resiliency and Flexibility
●Retain a Land Use Planning Firm to Provide “As Needed” Services to add capacity as
needed:
o Perform technical support services on projects on an as assigned basis.
o Coordinate and facilitate between and among parties.
o Review planning board applications and conduct Site Plan Reviews
o Provide technical support and reports for the Director, Board of Trustees, Planning
Board and the ZBA.
●Improve the span of control within the department
●Cross certification and training of professional staff.
Strategy 4: Advance Proactive Code Compliance Efforts
Fire Safety
●Host annual/bi-annual fire safety and property maintenance trainings for representatives of
assembly spaces, multi-family dwellings and non-residential occupancies.
●Develop and provide user friendly pre-inspection checklists.
●Develop templated graduated letters and notices of violation to facilitate achieve compliance
re: notice of non-compliance; then referral to court.
●Periodic compare the fire inspection facility lists with assessment rolls.
Community Communication
●Conduct ongoing community scans to proactively identify code violations.
●Utilize various means to educate residents on building code and property maintenance and
other quality of life codes.
o Target communication to new homeowners and realtors.
o Capitalize on community events such as clean up days.
o Send reminders to prior year non-compliant property owners prior to next inspection.
o Provide general information: What Requires a Building Permit/What does not?
Strategy 5: Advance the Use of Technology and Workflow Automation
●Benefits
o Improved oversight at management, supervisory and task level.
o Supports data driven decision making.
o Real time access to overdue inspections, overdue work; workload trends, etc.
o Improved communication with property owners and developers.
o Standardization of work activities
o Gains in efficiency
o Potential integration between building permit, code enforcement, zoning and land use planning
●Workflow automation includes:
o Applications, plan reviews and permitting approvals.
o Field based inspection report development and distribution.
o Document development and templated documents (inspection reports, notice of violations,
o Integration with other system such as GIS mapping and parcel data.
o Enforcement actions
o Routing of documents between staff; residents and contractors based on
pre-determined mapping and village sign-offs
o Records storage, indexing and retrieval can be automated
o On-line scheduling
Strategy 6: Enhance Management Practices
●Standard Operating Procedures/Guidelines
o The Department has a skilled, knowledgeable department head and staff
o It will be important that this knowledge be institutionalized
o Routinization of workflows creates structure for staff, reduces stress and facilitates
achievement of compliance. Staff freed up to focus on compliance and the difficult non-
compliant cases.
●Establish Work Activity Standards and Interval work plans
●Work Reporting, Documentation and Supervisory Oversight
●Ex: Timeliness of inspections, re-inspections, notice of violations, etc.
●Data driven decision making – use of trend data, data dashboard, case aging reports, etc.
THANK YOU
Machine-extracted for search and reference — the original PDF is the authoritative version.