DRAFT — VEB Meeting 08.11.2026 KS
minutes
4 pages
Scanned/OCR — text may contain errors
From the meeting:
Advisory Board on the Visual Environment (VEB) — 2026-09-08
Agenda item: Approval of Minutes - Draft Minutes August 11, 2026
Minutes, 4 pages. Attached to agenda item: “Approval of Minutes - Draft Minutes August 11, 2026” (Text recovered by OCR — may contain errors.)
Retrieved 2026-09-08 from the village's meeting portal.
View the original file ↗
Extracted text
Advisory Board on the Visual Environment
VEB (Minutes)
Tuesday, August 11, 2026 7:00 p.m. via Zoom
Present: Tatyana Polyak
Jan Johnson
Also Present: Bryan Healy, Village Manager
Danalys Nazario, Assistant Building Inspector
Stacey Nachtaler, Village Board of Trustees, Liasion
Maria Slippen, Village Board of Trustees, Liasion
1. Call to Order
2. Sign Permit Applications
a) Brooklyn Embodied Pilates – 18 Old Post Road South. The applicant clarified that the sign,
mounted on a hanging bracket attached to the facade along Old Post Road, is approximate 10 feet, 2
inches above the sidewalk. She confirmed that the bracket is existing and was previously located at
the site.
The applicant was asked whether the “Brooklyn” reference on the sign reflects where she is from,
which she confirmed.
It was noted that the sign located near the side-yard entrance may not be visible to the public. The
applicant was asked if she intends to provide a sign at the façade facing Maple Street. She indicated
that she does not.
The applicant was advised that, should she wish to install a new sign on the Maple Street façade in
the future, it would comply with Village Code Section 230-44 P(4)(a)[2], which provides that such
signs shall be limited as follows: “The aggregate area of all signs more than 2 times the length, in
feet, of the wall in which they are placed.”
The applicant also asked if there were any objections to using the side yard as a garden where
customers could grow plants and herbs. No objection were raised, provided that hedges, brush or
other vegetation do not encroach upon or obstruct the sidewalk.
The Board discussed potential ways the Village could prevent future tenants from installing signage
prior to submitting applications for review by the VEB.
Following the discussion and clarifications of the proposal, the VEB unanimously agreed that the
proposed design was acceptable.
. . ’ x D. \ mum
J y | IS es) \\ ;
| / / | 4 NG a c
j | | 4 7 ‘€ ' =| h ;
| IG, % :
by NK — ) ‘ Ly
‘it |
Al re tke 4 . |
Aur | cy a [4 ; i
—— EB JH F | 3 : ,
> - ] a ’ ¥, “ : oq Rt ie
' i! : aT Are) oe
PPAR HII
‘ a
‘ Way ; ? ati
we | abel - i
Ee %: Hig .
ai i
TI
cae, nsmonenans
nani inne a? —
be view
peed =: i
pilates o.
Van
i TT |
eS ~~ SES s
i ee Be
lees —— &
ey
ese apeie pamaraes
18 Old Post Rd S Q x _ ae
Se y td
s ——" ae a
oid Post Rd S : ee ais att it Fer aay &
, So wee Ay ear. et
By Google Street View A > Aa ae m1 he
A peo Se
Ra S45 53 es Eee eae ee. 5
F Ne Dae eas oy be Oa Ee | tee
— Be re oe AE ea
| Sr oN CI ee Woe. eee ts 1s
ar = S et eae R/S
Se is SSget, 5 ae we r
oc a ee ee
[= | 4 | Re WT eee a a eee
aa Ea il TNH / ] = Se es gr. Bee
5 meen oe ‘ Hi { pita = ba
== ——— ; if ¥
ie " ’
= — j a as A = we 7
—— = 5 ete I
- ee Sa ee —_
3. Mondays Window Painting – 125 Grand Street. The rainbow squiggles that have been painted
onto the front windows were initially going to be temporary and removed within the 45 day
temporary sign timeframe. However, since they wanted to keep it through the end of August they
submitted the Sign Permit Application, as explained in their letter submitted as part of the application.
They are proposing a new design by Labor Day. It was explained that the next sign would not be
submitted for VEB review as they will be replaced by new future temporary window paint designs.
4. Half Moon Bay Bridge Color Sample – The VEB unanimously agreed that color sample
26187 Gray (semi-gloss) for the steel girders underneath the bridge proposed design was
acceptable.
5. Approval of Minutes – Draft Minutes June 9, 2026. There were no comments to the draft
Minutes.
Discussions not part of the Agenda:
-It was asked if there was a standard for Signs throughout the Village. It was explained that the Village
website has been updated and includes the VEB 2024 Annual Report, which shows what works in the
Village and what to consider by way of guidance.
Sincerely,
Danalys Nazario
Assistant Building Inspector
Machine-extracted for search and reference — the original file is the authoritative version.