Grant Opportunities Memo260613
memo
3 pages
Meeting: portal event 1057 (no meeting page on file)
Agenda item: Discussion with Valerie Monastra of Nelson Pope Voorhis on potential grant opportunities for the Village.
Memo, 3 pages. Attached to agenda item: “Discussion with Valerie Monastra of Nelson Pope Voorhis on potential grant opportunities for the Village.”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Extracted text
Hudson Valley: 156 Route 59, Suite C6, Suffern, NY 10901 845.368.1472
Long Island: 70 Maxess Road, Melville, NY 11747 631.427.5665
MEMORANDUM
TO:
Mayor Pugh and Member of the Village Board of Trustees
FROM:
Valerie Monastra, AICP
SUBJECT:
Grants
DATE:
June 13, 2025
CC:
Projects for Current Grant Funding Programs
The competitive New York State Consolidated Funding Application (CFA) grants are now available and
must be submitted on July 31, 2025. Additionally, there are other sources of funding, including County
and State, that will be available this summer and fall. In consultation with the Village Manger as well as
the review of the Village of Croton-on-Hudson’s Departmental Capital requests, and other priority
projects identified by the Village Board, five projects have been identified for potential funding. The
projects and grant programs are summarized below.
1. Brook Street Drainage Project – Project includes the re-routing of stormwater from an aging
culvert that runs underneath homes to a new stormwater pipe that will be located underneath
Brook Street.
a. Plans or Studies - D&B Engineers recently updated the Village’s drainage basin study,
which was first done in 2004. Plans and cost estimates are complete.
b. Potential Grant – Westchester County Stormwater Management Law Flood Mitigation
Project Application Form.
i. 50/50 cost share
ii. Requires submission of a form and technical documents
iii. Meeting with the County is required before official submission
c. Project cost is approximately $1.2 million (2024 numbers)
2. Gouveia Park Improvements – Project entails the rehabilitation of the existing building for the
Parks Department and a Community Center
a. Project identified in Village’s LWRP
b. Plans or Studies – Plans and cost estimates are complete.
c. Potential Grant –
i. NYBRICKS – program specifically for community centers -20% match
Grants
June 13, 2025
ii. EPF Parks Program – 50% match
d. Project cost is approximately $2.5 million (2025 numbers)
3. Riverwalk Expansion Design- Extend RiverWalk to Oscawana Park. The project will require
cooperation of the Village, Town of Cortlandt, Westchester County, Army Corps of Engineers,
NYS DEC and Metro-North Railroad.
a. Project identified in Village’s LWRP
b. Project will need buy-in from property owners before submission of the grant
c. Potential Grant –
i. LWRP – 25% match
ii. Conservancy Trail Grants – Applications open June 30th, grant details are
unknown
d. Project cost is approximately $50,000- $100,000 (depending on scope)
4. Salt Shed Relocation – Project entails relocating the salt shed out of the floodplain. Two
potential locations are the existing DPW/County project at 3 Municipal Place or vacant land
adjacent to the DPW Garage on Route 129 (if outside the DEP watershed area)
a. Potential Grant – Water Quality Improvement Fund – program specifically for Salt
Storage and Road Salt Reduction -maximum $400,000 - $600,000
b. Location and cost still need to be determined
5. Senior Transportation Vehicle – Project includes replacing the Village’s existing senior transport
bus in the 2026-2027 fiscal year.
a. Potential Grant – CBDG funded a few of these projects in the 2025-2027 round. There
may be potential to resubmit since none of your applications were funded. The Village
would need to speak to the County.
b. The cost estimate for the new vehicle is $150,000.
Pending Funding Requests
The Village also submitted additional projects for funding, and those applications are still pending.
These pending projects are identified below.
1. New sidewalks along Municipal Place and South Riverside Avenue (both state roadways)
2. Replacement of Engine 119 at Washington Engine Company
3. Replacement of the roof at Harmon Firehouse
4. Reline the existing water main along Harrison Street and extend a new water main along Sunset
Trail
Grants
June 13, 2025
Projects that Don’t Have Identified Sources of Funding
There are a few projects that currently lack identified sources of funding but are still under
development, and funding opportunities may emerge once the projects are more complete. These
include the following:
1. Shoreline Resiliency at Train Station Lot
a. Plans or Studies – The Village engaged AKRF to undertake a resiliency study of the
shoreline at the train station.
i. AKRF developed three options (do nothing, put fill into the parking lot, build a
seawall). Currently, the Village would like to move forward with the seawall.
b. Cost still to be determined
2. Expansion of Sanitary Sewer Lounsbury Road and Mount Airy Road
a. There are a number of vacant parcels that could be built upon if connected to sewer.
The project would also include upgrades to the North Highland water storage tank that
provides potable water to these neighborhoods.
b. This is a potential project for Pro-Housing Funding but would need a plan for the
redevelopment of these properties.
3. Parking Lot on Brook Street
a. The Village owns a vacant parcel on Brook Street that is currently used for parking.
There is potential to create a parking lot that would increase the number of spaces and
reduce parking on Brook Street, thereby making the roadway safer for all modes of
transportation.
b. The cost estimate for this work is approximately $250,000.