Half Moon Bay Bridge rehabilitation
Topic
5 mentions
· in our records since Dec 17, 2025
Related
Tectonic Engineering
drainage improvements
membership changes
organizational meeting
Terrace Place
Black Rock Dog Park
Gerstein Street
Village of Croton-on-Hudson
renewable diesel
Stacey Nachtaler
Appearances (5)
**Source documents:**
- [warrant](https://play.champds.com/ATT/crotononhudsonny/2026-01/1f093b4334bb2a6cc63f6ac5ec08f9126b0f67b0.pdf)
- [Big box fundraiser permission request](https://play.champds.com/ATT/crotononhudsonny/2026-01/62a6e1df9f2b27eec0d6…
=== EXECUTIVE BRIEF ===
• Approved $544,139.11 in voucher payments across all funds
• Authorized $41,540 additional scope for Tectonic Engineering on Half Moon Bay Bridge rehabilitation
• Adopted Local Law No. 1 of 2026, allowing appointment of alter…
We call it the yappa. And there's a rooster. And they both live on the other side of the river."
The irony? Despite a 40-minute webinar Monday detailing the 14-month Half Moon Bay Bridge rehabilitation project — covering lane closures, railroad coor…
**Source documents:**
- [warrant](https://play.champds.com/ATT/crotononhudsonny/2025-12/98f6d4037c2f8a90bdf40cf6f9de25e998a1036c.pdf)
- [Local Law Information Page](https://www.crotononhudson-ny.gov/projects-initiatives/pages/local-law-introductory-n…
On the infrastructure front, the board authorized a $701,000 intermunicipal agreement with Westchester County to fund long-sought drainage improvements along Brook Street and Terrace Place. The village also took a major step on the Half Moon Bay Brid…