Lot G
Location
1 mention
· in our records since Dec 1, 2025
Appearances (1)
There's there's a lot goes into it. It's the cost of the building permit is based on the cost of construction. Right. Cost of construction during COVID goes up 50 percent. I can't maybe the building permit should be based on square footage. But, agai…