- Heat Pumps
Harmon firehouse rooftop HPs: on hold until after Harmon’s roof is replaced. Washington firehouse garage HPs: on hold until after Harmon’s solar rooftop gets
done. Heat Pump Water Heater (HPWH) project experience: Lindsay reported on
rep…
contracts. That’s about double the prior Solarize %. Carly i 2s
reported her new system is running fine, and she is } /, y
seeing savings on her most recent electric bill. SF, ge"
- Heat Pumps i = Lh
7 : Mics. . SO
Harmon firehouse rooftop HPs: …
Lawsuits are being pursued to challenge such “claw back” efforts. - Heat Pumps
Washington firehouse garage HPs: The draft RFP is done and being reviewed by
Village staff. Due to the need to expedite the Harmon firehouse solar job to ensure we
secure …
No damage or
fire resulted. The Village replaced both with propane-fired units and installed a 1,000
gallon above-ground propane tank next to the DPW parking lot. The only muni facility
still depending on fuel oil is the Washington firehouse (others …
- Heat Pumps
Washington firehouse garage HPs: To verify that the building has sufficient
electrical service capacity to accommodate the proposed equipment, Lindsay secured
from the Village Engineer a copy of its original (1978) electrical install…
Lindsay reviewed those issues, and concluded that we should instead hold off joining
or promoting the program until we saw it in action. Carly would be the “guinea pig”
since she is already planning on pursuing solar at her home. As she experiences…
by the end of the coming week. Several
residents that are considering solar were advised to wait for the SW program to start. [On 3/26/25, Leo Wiegman of SW said: “We have decided to eliminate the need for
any executed agreement between munis and S…
Cost for this service (likely
under $10K) would be covered from our existing NYSERDA grant for that project. The
MOU is being converted to a project management service contract. SW new Solarize program: Carly reported on SW’s fledgling Solarize pro…
This issue should be
resolved by end of May with the passing of the annual federal budget. 3 [On 3/7/25, Village Treasurer Dan Tucker reported that IRS in January denied our
request for a ~$20K DirectPay reimbursement for the Washington firehouse s…
Work will not be
affected by changes in IRA funding. Washington firehouse garage HPs: Jon and Lindsay are finishing a draft SOW and
RFP for review by the Village Engineer. As per Jon’s earlier findings on the cost and