A Memoir of the Construction, Cost, and Capacity of the Croton Aqueduct
Croton Dam Stein, Albert Engineer, 133, 61 147, 79, 86, 87, 8, 91 Syphon Bridge, 160 Croton Maid, 193, 78, 9, 20, 24, 6, 15, 195 Supply of Water, 215 Curtis, Zebina, Water Project, 89 Taxes Ward, 139 Clendening Valley 175, 82, 8, 92, 204, 211 Treasury Notes 86, 8 Dekay, Dr 108 City, Turn out for Wages, ...158 Disbrow, Levi 104 Tunnel Harlem River, 166, 7, 8, 9 Douglas, Major,. 116, 17, 25, 27, 33, 40, 47, 150, 61, 76 204 Dusenbury, Tunnels, , 116,118 Declivity of Aqueduct, .214 Varick, Richard, 95,6 Founders, Iron, 157 Valley Clendening 175, 82, 8, 92, 204, 211 175, 206 Fox, Wm. L 116, 78 Ventilators, Hamilton, Alexander, 95, 6, 7 Vote Popular on Croton, 138, 9 Harlem Heights, Ward, I. D., 178, 99 104, 11, 28 Harlem River,. .93, 4, 111, 12, 26, 127, 50. 2, 3, 8, 82. . Water Purveyor , 128, 186 '
3, 93, 5, 8, 2, 14. Stock, .'
Housatonic Canal, 101 Weston, Mr. Engineer, : ....90, 1, 112 2, 4, Well Company, N. Y., 104 Hudson, Proposal to Dam 131 Hunter John, Water Project Wells, Artesian, 104, 29 128, 9 Jems, J. B 143, 71, 5, 6, 7, 96, 201, 216, 220 White, Canvass Engineer 101, 2, 3, 11, 12 Wright, Benjamin Engineer, .... 102, 3, 6, 12, 15, 16 Johnson, W. S 136 Woodruff, Mr.,
THIS BOOK IS DUE ON THE LAST DATE STAMPED BELOW AN INITIAL PINE OP 25 CENTS WILL. BE ASSESSED FOR FAILURE TO RETURN THIS BOOK ON THE DATE DUE. THE PENALTY
Y., 104 Hudson, Proposal to Dam 131 Hunter John, Water Project Wells, Artesian, 104, 29 128, 9 Jems, J. B 143, 71, 5, 6, 7, 96, 201, 216, 220 White, Canvass Engineer 101, 2, 3, 11, 12 Wright, Benjamin Engineer, .... 102, 3, 6, 12, 15, 16 Johnson, W. S 136 Woodruff, Mr., THIS BOOK IS DUE ON THE LAST DATE STAMPED BELOW AN INITIAL PINE OP 25 CENTS WILL. BE ASSESSED FOR FAILURE TO RETURN THIS BOOK ON THE DATE DUE. THE PENALTY LD 21-100m-7,'40 (6936s) YE 01275