New Croton Dam Construction Plan 1898
stone to build the dam. How did they do it? These images from the June, 1898 and January, 1899 issues of The Engineering Record show the temporary dam that diverted the Croton River and the buildings, train tracks, cableways and towers that were
Passages from this source (5)
- New Croton Dam Construction Plan 1898 (43w)
- New Croton Dam Construction Plan 1898 current
- New Croton Dam Construction Plan 1898 (44w)
- New Croton Dam Construction Plan 1898 (43w)
- New Croton Dam Construction Plan 1898 (8w)