small rivers or other shallow water. ↩ When the railroad was built across the mouth of the river and the “neck” of Croton Point, four hundred thousand cubic yards of sand and gravel had to be removed. The remaining banks on each side of the tracks
Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.