Home / crotonhistory.org / Passage

New Croton Dam Construction Circa 1902

crotonhistory.org 45 words

the dam is mislabelled. The retaining wall, built to divert the Croton River during excavation, had been removed by the time these photos were taken. Detail showing stone at the base of the dam A rarely seen view of the area behind the dam during