Water Control Commission Meeting
Can anyone hear me? Yes. They were about to start the meeting. Yes. Welcome to a meeting of the village of Croton on Hudson Water Control Commission. Today is Tuesday, 11/24/2026 at 7PM, and we'll call the meeting to order. And we have new business, which is a... Concerning the Quaker Bridge replacement over the Croton River, and this is an application for an extension of the wetland activity permit.
Would you like to explain, Vincent, what... They're looking for an extension of the permit that was granted last year. Correct, Jay? Nothing's changed, I believe?
Yeah. Nothing... Some contractor means and methods, but overall, nothing's. The scope for work is still the same.
Alright. We have a letter from Quaker Manning Engineering describing briefly their intention. And then the wetland activity permit that was issued previously is now being filed for an extension. And there was also documentation on slight change of tree count. Where did I see that? Yeah. It was in the the the map of the plans. The attachments. Yes. Okay. Yeah. Oh, great. Okay. But other than that, can you give us a slight update on the progress, generally speaking? Is that possible?
Right now, sure. Well, they're driving the piles right now, so they're they're constructing the substructure. I believe at the beginning of Buffman, they have most of the micro piles complete. And currently, they are doing the pile driving at the end of Buffman, which is on the village of Croton side. I... Yeah. So that... That's that's pretty much where we're at right now. We're still constructing the the deep foundation of the project. But overall, the tree removal limits and and the scope of the excavation is is at at its maximum point, essentially.
Okay. Thank you. Do you have some idea of the calendaring of the rest of the projects? Just for our curiosity.
Well, the deep foundations, once they're in place, they're... They can lay out the rebar and they'll they'll pour the substructure or the the footing for the bridge. I'm not sure what the... I can't tell you when that's gonna happen only because that's usually not done in the winter unless there's special provisions in place, and I know their contractor is discussing that. I I I know the resident engineer has talked about winter concrete work, but I don't know if anything's been approved or not. But let's say they have to pour that in the spring or February, usually, they can they can start pouring. The temperatures get a little better to get a better product. Then they'll they'll pour the wall. Then they can do the roadway, and then then bring out the bridge. So I think summer twenty twenty seven is the intent. That would be my expectation.
Alright. So use the advantage of the summer season to finish the bridge. That sounds sounds good to us. Yeah. Essentially. I mean, it might... I I can't imagine it going beyond 2027,
Oh, well, I know that they're not replacing as many... They're not gonna... They didn't need to replace as many trees as they expected. Mhmm. The contractor, they use a different methodology than what we had specified in the plans to reduce the amount of excavation on the project. So I think we described it in in creating that letter from creating manning about a soil nail wall. Yep. So if anything, I I believe we're kinda sticking to the soil erosion details and plans that we have in place, minus we may not need as much tree replacement, and I think we have some other type of erosion protection, like the stake... Staking. I don't... I'm not sure if we're gonna need as many as 300 just because of the reduction of the scope of work. But whatever we touch, we we we put back. We would we would install the soil erosion protection.
Okay. Thanks. And Vincent, have we done any inspections during the course of the work? No. We haven't done any. Okay. Any complaints? What's that? Have you received any complaints based on that work? No.
anyone see any reason not to extend the activity permit? I see. Maybe. Maybe you go ahead. No reason. What? I'll entertain a motion to extend the activity permit for another twelve months. That's a twelve month extension. Right? Being signed? I believe that's what's being requested twelve month And the intent is to finish by summer's twenty five seven.
We cover it. Yeah. Is there a motion? Motion passed. Is there a second? There's a second. Second. All those in favor? Aye. Yes. Any opposed? Seeing none, unanimous. Congratulations. We'll issue the second to... We'll issue the extension of the activity permit for the wetland.
That closes this matter and brings us to oh, this this is the draft resolution, I guess. Okay. Thank you. So there's a draft resolution here for this... The extension of the permit. I guess we already voted on it. We have the language in front of us, but this extends the permit for... I... The the existing permit expires December 20... The thirty first twenty twenty six, and this extends it for... I thought I thought it would be twelve months. Yeah. I think I think it's December 2027. It's a... I think it's the extension's for a year. Right. From... Yeah. Oh, they're... From the end of the year. So...
Oh, at the very Yeah. Second page. Top. It's blank, but we'll just put it in Item number one. Oh, think it's left. Full year till the end of It's left out. Thirty first twenty twenty seven. Yeah. Agreed. Yep. Yes.
There's a motion. Approve the draft resolution with a with a date of December thirty first twenty twenty second. Seconded by Richard.
Those in favor? Aye. Any opposed? None. Carries with the vote. Four to zero. Alright. I think that's it on this. There was... Were there minutes? There are. There are minutes. These are the minutes of the meeting of of 05/18/2026, which concerned a activity permit for a pool, I think, or an accessory Mhmm. Or accessory dwelling unit. Yeah. Mhmm. Mhmm. On Scenic Drive West. I didn't see any changes. Were any any alterations to the minutes? Any suggestions? Is there a motion to accept the minutes as presented?
Accept. Yes. I accept. I'll second. I'll second. Second. All those in favor? Aye. Aye. Any opposed? None. Motion's accepted,
four to zero, for the minutes as presented. Thank you, Stephanie. I think that brings us to... I think we're up to the adjournment. Yeah. We are. There's... I had Richard Bob Luntz's planning commission on the backside of this. I I kept, like, turning over.
I'll entertain a motion to, adjourn the meeting. I'll make a motion to adjourn the meeting.