2015 Approved Resolution
resolution
5 pages
From the meeting:
Planning Board — 2026-04-14
· our coverage →
Agenda item: New Business — Weiss, Micci, Attorney for Best Dispensary Near Me - 370 South Riverside Ave. (79.13-1-70) - Application for Change of Use from Retail to Cannabis Retail Dispensary
Resolution, 5 pages. Attached to agenda item: “New Business — Weiss, Micci, Attorney for Best Dispensary Near Me - 370 South Riverside Ave. (79.13-1-70) - Application for Change of Use from Retail to Cannabis Retail Dispensary”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
1396 MECCA Croton 10.10 - proposed floor plan Mindset
370 S Riverside Ave Cannabis Memo
370 S. Riverside Attorney Letter
370 SRA Cannabis Application
370 South Riverside Ave Draft Resolution
Approved Site Plan 2015
Cert of DB Mart Signed
Correspondence Part 2
Correspondence Part 3
Correspondence Part 4
Correspondence Part 5
Correspondence Part 6
Extracted text
WHEREAS, the Planning Board held a public hearing on an Amended Site Plan application on
Tuesday, July 14, 2015, and reviewed the proposed application on June 23 and July 28, 2015 for
the Kussa Corporation, hereafter known as “the Applicant,” said property located in the C-2
Zoning District and South Riverside/Harmon Gateway Overlay Zone, at 370 South Riverside
Ave. and designated on the Tax Map of the Village of Croton-on-Hudson as Section 79.13 Block
1 Lot 70; and
WHEREAS, this Amended Site Plan application is for a mixed-use occupancy building including
renovations and addition to existing building, including improvements to exterior finishes and
storefront, and site improvements; and
WHEREAS, this proposal is considered an Unlisted Action under the State Environmental
Quality Review Act (SEQRA); and
WHEREAS, on March 11, 2015, the Zoning Board of Appeals granted a variance from Village
Code Sections 230-20.3 B (3)(b)[5], 230-35, and 230-20.3B(3)(c)[1], for a front yard variance, a
rear yard variance, and a front façade transparent glass percentage variance for changes from an
existing 1-story commercial building to a 3-story mixed occupancy building; and
WHEREAS, on April 20, 2015 the Village Board issued a Negative Declaration in connection
with the Proposed Action; and
WHEREAS, on April 30, 2015 the Waterfront Advisory Committee (WAC) has issued a final
recommendation of consistency with the LWRP in connection with the Proposed Action; and
WHEREAS, on June 1, 2015 the Village Board determined that the Proposed Action, to issue a
special permit for a mixed use occupancy building at 370 South Riverside Avenue, complies
with the policy standards and conditions set forth in the Village’s LWRP and subsequently
issued a Determination of Consistency with the Village’s LWRP; and
WHEREAS, at the June 22, 2015 Village Board meeting, the Village Board of Trustees
approved the request for a special permit subject to certain conditions as stated on the special
permit approval; and
WHEREAS, under section 120-4 of the Village Code the Planning Board is the approving
authority for the issuance of an Excavation and Filling Permit and in accordance with section
120-3(C) of the Village Code, the approval of the Site Plan incorporates the excavation and
filling permit, subject to the conditions specified below.
WHEREAS, under section 208-16(C) of the Village Code the Planning Board is the approving
authority for the issuance of a Tree Removal Permit and in accordance with section 208-16(F) of
the Village Code the approval of the Site Plan includes the approval to remove trees noted on the
site plan to be removed, subject to the conditions specified below.
NOW, THEREFORE BE IT RESOLVED, that the Amended Site Plan application, as shown
on Drawing A0 Title Sheet entitled “2-Story Addition to Abby’s Deli” dated June 15, 2015;
Drawing S1 entitled “Proposed Site Plan”, last revised July 27, 2015, and Drawing S2 entitled
“Proposed Site Details” last revised July 27, 2015; Drawing A2 entitled “Proposed
Basement/Foundation Plan”, Drawing A3 entitled “Proposed First Floor Plan”, Drawing A4
entitled “Proposed second Floor Plan”, Drawing A5 entitled “Proposed Third Floor Plan”,
Drawing A6 entitled “Proposed Front and Side Elevation & Section A-A, and Drawing A7
entitled “Proposed front – Benedict Avenue & Rear Elevation, dated June 15, 2015, prepared by
Heike A. Schneider, Architect, of Yorktown Heights, New York, be approved subject to the
following conditions:
1)
That, the foregoing recitals are incorporated herein as if set forth at length.
2)
That a detailed construction staging plan be submitted to the Village Engineer
prior to the approval of a building permit.
3)
That, any sign application be submitted to the Planning Board for review and
approval, and as part of said application, be referred by the Planning Board to the
Advisory Board on the Visual Environment (VEB) for their review and
comments.
4)
That, the site plans be revised to address the following and that three copies of the
revised plans be submitted to the Village Engineer prior to the issuance of a
building permit:
a. That, a 5” concrete pad be installed under the garbage and recycling area
and include a yard drain piped to the storm water management system.
b. That, pavement repair detail be included on the plans.
c. That, the location of the existing utilities be corrected.
d. That, a white pavement striping in the outline of a box be installed in
front of the garbage and recycling area gates.
e. That, the thickness of the stamped concrete walkway be specified as 5”
and the stamped concrete be extended to the area under the garbage can
and the integral curb be eliminated.
f. That, 6” x 6” pressure treated dumpster wheel stops be provided to
protect the enclosure.
g. That, a separate colored concrete curbing be provided between the
walkway and landscaping area along the building.
5)
That, any damage to existing sidewalk, curbs, etc. be repaired prior to a certificate of
occupancy being granted.
6)
That, the sign on the garbage and recycling area gates be replaced in the future if
necessary due to change in the hours of pick up.
7)
That, the tenant parking signage be modified to include the word “only” after the
apartment number.
8)
That, if the Village picks up the recycling that 95 gallon plastic containers be provided
that are compatible that Villages can tipping equipment.
9)
That, in accordance with sections 208-18 and 208-19 of the Village Code the
following conditions are established for the approval to remove trees:
h. That, any landscaping, shown on approved plan, be installed prior to a
certificate of occupancy being issued. That, all disturbed areas not
hardsurfaced or mulched shall be covered with 3” of top soil, perennial
rye grass and mulch, and be reseeded and remulched as necessary to
achieve a minimum 85% grass coverage or covered with other ground
cover as shown on the approved landscaping plan.
i. That, if any of the trees noted on the plan to be saved are removed or
severely damaged during construction, the applicant will replace each
removed tree or severely damaged tree with a tree of 2.5” minimum
caliber with the species to be approved by the Village Engineer.
j. That, the trees to remain shall be protected with tree trunk armor and/or
root zone protection as shown on the site plans listed above or as
required by the Village Engineer.
k. That, in accordance with section 208-19(A) of the Village Code the
applicant shall file with the Village a suitable bond or other security
payable to the Village to cover the completion of conditions (a) through
(c) above, said bond to be filed prior to the issuance of a building permit
with amount and form of the bond to be approved by the Village.
l. That, tree removal operations shall not be permitted between the hours
of 8:00 p.m. and 8:00 a.m. Sunday through Friday and between the
hours of 8:00 p.m. and 10:00 a.m. Friday through Sunday.
m. That, any stumps remaining above grade shall be removed to less than
two feet.
n. That, no tree removal shall occur unless a building permit has been
issued by the Village Engineer.
o. That, within 30 days after the completion of all tree removals the Village
Engineer shall be notified of such completion.
p. That, the approval to remove trees shall be valid for the term of site plan
approval and shall terminate upon the issuance of a certificate of
occupancy.
10)
That, in accordance with sections 120-7 and 120-8 of the Village Code the following
conditions are established for the approval of the excavation and fill work:
a. That, suitable fencing, with a minimum height of 48”, be provided to guard
any excavation greater than four feet in depth. All gates shall be locked at
all times when work is not being performed on the property.
b. That, excavation and/or filling work shall not commence until a building
permit has been issued and erosion and sediment control devices have been
installed, inspected, and accepted by the Village Engineer in order to
prevent potential impacts to stormwater drainage, water bodies and/or
wetlands.
c. That, during construction all excavations shall be drained so that any
standing water at the bottom not be greater than one foot.
d. That, any fill from off-site shall be clean, containing no garbage, refuse or
deleterious matter, the Village Engineer shall inspect all fill from off-site
sources and may require testing, by an approved laboratory, to determine
the cleanliness of the fill.
e. That, appropriate dust-control measures shall be implemented onsite and
on access roads and any traveled areas used in connection with any
excavation and/or filling work to protect the public and surrounding area
against windblown soil and dust.
f. That, removal of soil or other material from the ground and/or placement of
fill on the ground shall not prevent or interfere with the orderly
development of land in the vicinity, shall not unreasonably impede traffic
flow, or parking.
g. That, to prevent the earth of adjoining property from caving in before
permanent supports have been provided for the sides of such excavation,
any person causing any excavation to be made shall provide such sheet
piling, bracing or other methods as may be necessary, plans for which are to
be submitted to and approved by the Village Engineer prior to any such
excavation being undertaken.
h. That, provisions shall be made for the temporary drainage of the property
during excavations or filling operations and for the permanent drainage to
be effective upon the completion of the operations.
i.
That, any excess soil from the excavation shall be removed from the site
immediately but in no event more than 20 days from excavation.
j.
That, all disturbed areas not hardsurfaced or mulched shall be covered with
3” of top soil, perennial rye grass and mulch, and be reseeded and
remulched as necessary to achieve a minimum 85% grass coverage or
covered with other ground cover as shown on the approved landscaping
plan.
k. That, the Village Engineer shall be notified by the next business day if
bedrock is encountered in the excavation. If hammering is required, a rock
excavation plan shall be submitted to the Village Engineer for review and
approval and shall not include any blasting operations. The rock excavation
plan shall provide for the shortest possible timeframe for the removal of
bedrock with the goal that all bedrock removal operations be conducted in a
two to three week period as approved by the Village Engineer. The Village
Engineer may extend this period on a day by day basis due to weather
events that would not allow reasonable working conditions. The rock
excavation plan shall also include an analysis of leaving part of the
basement a crawl space to reduce the quantity of bedrock required to be
excavated.
l.
That, in accordance with section 120-7 of the Village Code the applicant
shall file with the Village a suitable bond or other security to cover the
completion of conditions (a) through (k) above, said bond to be filed prior
to the issuance of a building permit with amount and form of the bond to be
approved by the Village.
m. That, excavation and/or filling operations shall not be permitted between
the hours of 8:00 p.m. and 8:00 a.m. Sunday through Friday and between
the hours of 8:00 p.m. and 10:00 a.m. Friday through Sunday.
n. That, there shall be no on-site processing of fill or excavated soil or the
erection or use of any structure for such processing however, power
equipment for the purpose of filling and excavation is permitted.
o. That, the Planning Board reserves the right to impose additional reasonable
conditions related to the excavation and filling operations during the terms
of this approval if in its opinion such additional reasonable conditions are
necessary.
p. That, the approval for excavation and/or filling operations shall be valid for
a period of one year starting on the date of issuance of the building permit
and subject to termination or renewal as specified in section 120-10(A) of
the Village Code.
q. That, any revision to the work covered by the approval of the excavation
and or filling work shall be reviewed by the Village Engineer and if
determined to be a substantial revision a submission of a new application to
the Planning Board shall be required.
r. That, following the completion of the work the applicant shall submit a
certification of completion by a NYS licensed design professional to the
Village Engineer. The Village Engineer may require the submission of an
as-built survey.
s. The approval for excavation and filling operations may be suspended or
revoked and stop work orders issued as set forth in section 120-10(E)-(G)
of the Village Code.
Unless a building permit is issued and work is commenced and diligently prosecuted within three years of
the date of the resolution approving the site plan, such site plan shall become null and void. Any
application for an extension of site plan approval shall be made six months prior to the expiration date.
The Planning Board of the Village of
Croton-on-Hudson, New York
Robert Luntz, Chairman
Bruce Kauderer
Steve Krisky
Rocco Mastronardi
Janet Mainiero
Motion to approve by Mr. Kauderer, seconded by Ms. Mainiero, and carried, all in favor, by a
vote of 5 to 0.
Resolution accepted at the meeting held on July 28, 2015.