croton.news
Independent, AI-assisted local reporting from public records
Croton-on-Hudson, New York · Tuesday, September 29, 2026· Sep 29, 2026
Source-linked•Corrections welcomed
Documents › Planning Board, 2026-09-22

41-51 Maple Street Memo to PB 09-18-2026

site plan 1 page Scanned/OCR — text may contain errors
From the meeting: Planning Board — 2026-09-22 · our coverage →
Agenda item: New Business — 41-51 Maple LLC 41-51 Maple Street (78.12-3-3) - Amended Site Plan to Legalize Existing Shed
Site plan, 1 page. Attached to agenda item: “New Business — 41-51 Maple LLC 41-51 Maple Street (78.12-3-3) - Amended Site Plan to Legalize Existing Shed” (Text recovered by OCR — may contain errors.)
Retrieved 2026-09-29 from the village's meeting portal. View the original file ↗
The Engineering Department’s September 18, 2026 memorandum says the shed at 41–51 Maple Street was installed without Planning Board approval. It explains that the applicant would still need to file for a shed permit if the amended site plan were approved.
AI summary — generated from the document text; check the original before relying on details
Also attached to this agenda item: Maple Commons Shed Draft Resolution 2026 Maple Commons Shed Images Maple Commons Survey w Shed Redacted PB Application
Ld Mayor Brian Pugh Trustees Nora Moriarty Nicholson Stacey Nachtaler : Len Simon Village of Croton-on-Hudson New York Maria F. Slippen Manager ENGINEERS OFFICE Bryan Healy Stanley H. Kellerhouse Municipal Building Treasurer One Van Wyck Street T Croton-on-Hudson, NY 10520.2501 Genette Toone | engineering (@crotononhudson-ny.gov Engineer/Building Inspector Vincent Salanitro, P.E. Asst. Engineer/Asst. Building Inspector Ronald Wegner, P.E., CEO Assistant Building Inspector Danalys Nazario Fire Inspector James Ferguson 09/18/2026 41-51 Maple Street — Engineering Department Memo to Planning Board The applicant appears before the Planning Board seeking Amended Site Plan approval to Legalize an existing shed. The applicant has installed this shed on the property without approval from the Planning Board. If approved by the Planning Board, the applicant will then have to file for a shed permit and then this shed will be legal. Tel: 914-271-4783 www.crotononhudson-ny.gov engineering@crotononhudson-ny.gov

Machine-extracted for search and reference — the original file is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.