From the meeting:
Board Of Trustees — 2026-08-19
· our coverage →
Agenda item: Work Session - 6 PM — Update from Lindsay Audin, Chair of the Sustainability Committee, on the Request for Information issued for Battery Energy Storage Systems (BESS).
Report / study, 6 pages. Attached to agenda item: “Work Session - 6 PM — Update from Lindsay Audin, Chair of the Sustainability Committee, on the Request for Information issued for Battery Energy Storage Systems (BESS).”
Retrieved 2026-09-29 from the village's meeting portal.
View the original file ↗
Also attached to this agenda item:
Croton BESS RFI 072026
Extracted text
Results of the August
RFI to BESS DevelopersPresented to Croton
Presented to Croton’s Village Board of TrusteesAugust 19,
August 19, 2026
2026b
by (Mr.) Lindsay
y (Mr.) Lindsay Audin
AudinCEM LEED
CEM LEED-AP
APchair, Croton Sustainability
chair, Croton Sustainability Committee
Committee
2In Ju
In July, a list of BESS developers was compiled from various sources, in
sources, including a list of NYSERDA’s Approved Energy Storage Contra
Contractors, members of the NY Battery Energy Storage Technology Co
Technology Consortium (NY-BEST), and Lindsay
BEST), and Lindsay Audin’s
Audin’sprofessional con
professional contacts in the energy industry. A total of 50 firms were iden
A total of 50 firms were identified. Initial contacts to determine their statu
their statuses eliminated 21 of them for various reasons, e.g.,-
-merged with or acquired by other BESS firms
merged with or acquired by other BESS firms-
-no longer in business, or no longer doing business in the U.S.
no longer in business, or no longer doing business in the U.S.-
-failure to respond to multiple efforts to communicate
failure to respond to multiple efforts to communicateThe RFI (Req
The RFI (Request for Information)
3A dra
A draft RFI was assembled and approved by the Village Manager. It wa
Manager. It was distributed to the remaining 29 vendors on August 3,
August 3, with responses due August 17.-
-6 vendors provided full responses by the deadline
6 vendors provided full responses by the deadline-
-3 others were bounced back as “undeliverable”
3 others were bounced back as “undeliverable”-
-20
20 others
others did not respond and did not bounce back.
did not respond and did not bounce back.Based on experien
Based on experience, we expected 4 or 5, so 6 was a success.The R
The RFI (Request for Information)
4In al
In alphabetical order, they are:-
-Luminace
Luminace-
-Microgrid
MicrogridNetworks
Networks-
-New Leaf Energy
New Leaf Energy-
-NineDot
NineDotEnergy
Energy-
-Orenda
OrendaPower
Power-
-RIC Energy
RIC EnergyThe Six Responders
The Six RespondersAll are well known in
All are well known in the industry an
industry and are actively developing
developing projects in our region and
region and/or in New York City. One
City. One presently has three 5 MW B
5 MW BESS operating in Westchest
Westchester County.
Next Steps
Next Steps A summary of responses to t
A summary of responses to the RFI in Word and Excel
and Excel will be compiled by Labor
compiled by Labor Day for
Day for review by
review by the Village Manager.A draft RFP (Request F
A draft RFP (Request For Proposals) is being assemble
assembled for issue by mid-September, with
September, with response
responses by mid-October.
October.If any BESS projects are p
If any BESS projects are proposed, the sites and propos
and proposals will be reviewed by Village officials and
officials and checked for their feasibility.If any appear a
If any appear acceptable, public discussion will then be
then be initiated as desired.5
5
Thank you for
Thank you for your time
your time and attention
and attention.
13