croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Tuesday, August 18, 2026· Aug 18, 2026
Source-linkedCorrections welcomed
DocumentsBoard Of Trustees, 2025-09-24

DobbsParkawardletter

resolution 2 pages
From the meeting: Board Of Trustees — 2025-09-24
Agenda item: Proposed Resolutions — Consider awarding Bid No. 12-2025 for the Dobbs Park Playground and Basketball Improvements to Peter J. Landi Inc., of Hawthorne, New York, in the amount of $345,093.40.
Resolution, 2 pages. Attached to agenda item: “Proposed Resolutions — Consider awarding Bid No. 12-2025 for the Dobbs Park Playground and Basketball Improvements to Peter J. Landi Inc., of Hawthorne, New York, in the amount of $345,093.40.”
Retrieved 2026-04-15 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: Resolution 234-2025 Bid 12-2025 Dobbs Playground
Kenneth W. Jenkins Westchester County Executive Department of Planning Blanca P. Lopez, M.S. Telephone: (914) 995-4400 Fax: (914) 995-9093 Website: westchestergov.com 9/12/2025 Bryan T. Healy Village Manager Village of Croton-on-Hudson 1 Van Wyck Street, Croton-on-Hudson, N.Y. 10520 Re: Dobbs Park Playground and Basketball Improvement Project Bid no 12-2025 Dear Brian; Enclosed for your review is an analysis of the bids submitted on September 11, 2025 for the above mentioned project. All of the bid proposals received have been checked for mathematical accuracy and the totals shown on the spreadsheet represent correct amounts. The low bidder is Peter J. Landi, Inc. This contractor has provided references and projects of a similar scope. We recommend the Village award the bid to Peter J. Landi, Inc. at the next board meeting, for the amount of $345,093.40 (there was a math error in the tabulation). In addition, as per the latest ‘NYSDOL List of Employers Ineligible to Bid on or Awarded any Public Work Contract’, this Contractor is eligible for award. Please note that the Village attorney must perform the due diligence to verify the bid. Please notify me once the bid has been awarded so that we can schedule a pre-construction conference. I look forward to working with you in completing this project. Suzette Lopane Principal Planner (Urban Design) Cc: Blanca Lopez, Commissioner of Planning, Westchester County Bid Tabulation Sheet Contract No.: 12-2025 Dobbs Park Playground and Basketball Improvements Bid Opening Date: 9/11/2025 ITEM No. UNIT Unit Words QUANTITY UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID UNIT PRICE AMOUNT BID 202.1901WE Small Structure Removals, Site Furniture, Basketball Goal EA EACH 500.00 $ 7,000.00 $ 500.00 $ 7,000.00 $ 1,500.00 $ 21,000.00 $ 340.00 $ 4,760.00 $ 202.1902WE Large Structure Removals, Play Structure, Swings EA EACH 2,000.00 $ 6,000.00 $ 4,000.00 $ 12,000.00 $ 15,900.00 $ 47,700.00 $ 3,320.00 $ 9,960.00 $ 202.1903WE Remove Existing Curb LF Linear Foot 12.00 $ 1,680.00 $ 25.00 $ 3,500.00 $ 10.00 $ 1,400.00 $ 34.00 $ 4,760.00 $ 203.02 UNCLASSIFIED EXCAVATION AND DISPOSAL C.Y. Cubic Yard 150.00 $ 56,400.00 $ 145.00 $ 54,520.00 $ 125.00 $ 47,000.00 $ 123.00 $ 46,248.00 $ 206.0101WE Rock Excavation ($90 min, $150 max) C.Y. Cubic Yard 90.00 $ 4,500.00 $ 150.00 $ 7,500.00 $ 90.00 $ 4,500.00 $ 150.00 $ 7,500.00 $ 206.05 TEST PIT EXCAVATION EA. Each 250.00 $ 250.00 $ 1.00 $ 1.00 $ 1,500.00 $ 1,500.00 $ 1,200.00 $ 1,200.00 $ 207.21 GEOTEXILE SEPARATION S.Y. Square Yard 5.00 $ 4,850.00 $ 4.50 $ 4,365.00 $ 4.00 $ 3,880.00 $ 4.00 $ 3,880.00 $ 209.13 SILT FENCE-TEMPORARY L.F. Linear Foot 12.00 $ 2,040.00 $ 8.00 $ 1,360.00 $ 10.00 $ 1,700.00 $ 12.00 $ 2,040.00 $ 209.1703WE Drainage Structure Inlet Protection, Prefabricated - Temporary EA EACH 250.00 $ 250.00 $ 300.00 $ 300.00 $ 350.00 $ 350.00 $ 1,620.00 $ 1,620.00 $ 209.190201 Rolled Erosion Control product, Class II Type B, Intermediate S.Y. Square Yard 7.50 $ 2,625.00 $ 12.00 $ 4,200.00 $ 5.00 $ 1,750.00 $ 7.00 $ 2,450.00 $ 209.22 CONSTRUCTION ENTRANCE S.Y. Square Yard 100.00 $ 3,300.00 $ 125.00 $ 4,125.00 $ 165.00 $ 5,445.00 $ 276.00 $ 9,108.00 $ 608.020102 Asphalt Sidewaks Ton Ton 250.00 $ 43,000.00 $ 350.00 $ 60,200.00 $ 275.00 $ 47,300.00 $ 252.00 $ 43,344.00 $ 608.0311WE Furnish & Install Wood Fiber Surface and Rubber Wear Mats S.F. Square Foot 4,000 5.00 $ 20,000.00 $ 5.00 $ 20,000.00 $ 5.25 $ 21,000.00 $ 6.00 $ 24,000.00 $ 608.0313WE Basketball Court Sportscoating S.F. Square Foot 3,162 5.70 $ 18,023.40 $ 5.90 $ 18,655.80 $ 4.50 $ 14,229.00 $ 36.00 $ 113,832.00 $ 609.0210WE Cobble Block Curb L.F. Linear Foot 20.00 $ 7,200.00 $ 65.00 $ 23,400.00 $ 65.00 $ 23,400.00 $ 48.00 $ 17,280.00 $ 610.1101 Mulch for Planting - Wood Chips and Shredded Bark C.Y. Cubic Yard 300.00 $ 300.00 $ 90.00 $ 90.00 $ 100.00 $ 100.00 $ 600.00 $ 600.00 $ 610.1401 Topsoil - Reuse On Site Materials C.Y. Cubic Yard 65.00 $ 2,600.00 $ 90.00 $ 3,600.00 $ 75.00 $ 3,000.00 $ 120.00 $ 4,800.00 $ 610.1602WE Turf Establishment - Lawn with Watering and Mowing S.Y. Square Yard 25.00 $ 8,750.00 $ 18.50 $ 6,475.00 $ 10.00 $ 3,500.00 $ 43.00 $ 15,050.00 $ 611.0121 Planting - Major Deciduous Trees - 8'-10' ht. EA EACH 850.00 $ 850.00 $ 1,500.00 $ 1,500.00 $ 900.00 $ 900.00 $ 1,800.00 $ 1,800.00 $ 611.0161 Planting - Major Deciduous Trees -2 1/2" cal. EA EACH 1,000.00 $ 1,000.00 $ 1,500.00 $ 1,500.00 $ 900.00 $ 900.00 $ 1,800.00 $ 1,800.00 $ 611.1701WE Irrigation Bag EA EACH 250.00 $ 500.00 $ 50.00 $ 100.00 $ 300.00 $ 600.00 $ 1,800.00 $ 3,600.00 $ 614.060204 Tree Removal over 6" to 12", stumps grubbed EA EACH 1,500.00 $ 1,500.00 $ 2,500.00 $ 2,500.00 $ 1,900.00 $ 1,900.00 $ 1,800.00 $ 1,800.00 $ 615.0301WE Install Village Supplied Play Structure - 2- 5 year old EA EACH 20,000.00 $ 20,000.00 $ 15,500.00 $ 15,500.00 $ 65,000.00 $ 65,000.00 $ 30,000.00 $ 30,000.00 $ 615.0302WE Install Village Supplied Play Structure - 5-12 year old EA EACH 31,000.00 $ 31,000.00 $ 32,000.00 $ 32,000.00 $ 65,000.00 $ 65,000.00 $ 30,000.00 $ 30,000.00 $ 615.0303WE Install Village Supplied 3 Bay Swings EA EACH 15,000.00 $ 15,000.00 $ 4,500.00 $ 4,500.00 $ 15,000.00 $ 15,000.00 $ 30,000.00 $ 30,000.00 $ 615.0304WE Install Village Supplied Spinners EA EACH 2,000.00 $ 4,000.00 $ 700.00 $ 1,400.00 $ 7,500.00 $ 15,000.00 $ 15,000.00 $ 30,000.00 $ 615.0401WE Furnish and Install Basketball Post and Goals EA EACH 9,000.00 $ 18,000.00 $ 8,750.00 $ 17,500.00 $ 8,500.00 $ 17,000.00 $ 2,640.00 $ 5,280.00 $ 615.0802WE Furnish and Install 6' long Backed Bench EA EACH 1,900.00 $ 9,500.00 $ 1,450.00 $ 7,250.00 $ 1,500.00 $ 7,500.00 $ 1,920.00 $ 9,600.00 $ 615.0803WE Furnish and Install 8' long Player's Bench EA EACH 2,000.00 $ 2,000.00 $ 250.00 $ 250.00 $ 1,700.00 $ 1,700.00 $ 1,950.00 $ 1,950.00 $ 615.0804WE Furnish and Install ADA Picnic Table, 8' long EA EACH 4,000.00 $ 8,000.00 $ 6,300.00 $ 12,600.00 $ 3,000.00 $ 6,000.00 $ 4,575.00 $ 9,150.00 $ 615.0805WE Furnish and Install Trash Receptacle EA EACH 2,000.00 $ 4,000.00 $ 1,975.00 $ 3,950.00 $ 1,800.00 $ 3,600.00 $ 2,265.00 $ 4,530.00 $ 615.0806WE Furnish and Install Recycling Recptacle EA EACH 2,200.00 $ 4,400.00 $ 1,975.00 $ 3,950.00 $ 1,800.00 $ 3,600.00 $ 2,265.00 $ 4,530.00 $ 619.6071WE Furnish and Maintain Temporary Construction Fence LF Linear Foot 15.00 $ 1,650.00 $ 32.00 $ 3,520.00 $ 30.00 $ 3,300.00 $ 24.00 $ 2,640.00 $ 623.12 CRUSHED STONE (IN-PLACE MEASURE) C.Y. Cubic Yard 100.00 $ 20,700.00 $ 155.00 $ 32,085.00 $ 125.00 $ 25,875.00 $ 128.00 $ 26,496.00 $ 627.50140008 Cutting Pavement LF Linear Foot 15.00 $ 225.00 $ 15.00 $ 225.00 $ 25.00 $ 375.00 $ 12.00 $ 180.00 $ 660.01WE Utility Location & Markout LS Lump Sum 2,000.00 $ 2,000.00 $ 1,800.00 $ 1,800.00 $ 5,000.00 $ 5,000.00 $ 1,200.00 $ 1,200.00 $ 663.51WE Remove Existing and Furnish and Install New Drinking Fountain LS Lump Sum 12,000.00 $ 12,000.00 $ 15,750.00 $ 15,750.00 $ 12,000.00 $ 12,000.00 $ 15,600.00 $ 15,600.00 $ Contractor's Bid Price 342,593.40 $ Actual Total 345,093.40 $ Total: 389,171.80 $ Total: 499,004.00 $ Total: 522,588.00 $ Peter J.Landi, Inc Pat Corsetti, Inc. Paladino Corp. Maruti LLC

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.