73 Melrose
site plan
2 pages
From the meeting:
Planning Board — 2025-11-04
· our coverage →
Agenda item: New Business — 73 Melrose, LLC - Minor Site Plan Approval for a New Single-Family Home - 73 Melrose Avenue (79.5-4-31.2)
Site plan, 2 pages. Attached to agenda item: “New Business — 73 Melrose, LLC - Minor Site Plan Approval for a New Single-Family Home - 73 Melrose Avenue (79.5-4-31.2)”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
73 Melrose Ave 9-23-25 Architectual Drawings
73 Melrose Avenue Memo to PB 11-03-2025
73 Melrose Draft Minor Site Plan Resolution
MELROSE-SP-DETAIL-SS 10-1-25
Melrose Exterior Finishes
Extracted text
Ralph G. Mastromonaco, PE PC Consulting Engineers
Chairman Robert Luntz
October 15, 2025
And Members
Village of Corotn-on-Hudson Planning Board
1 Van Wyck Street
Croton-on-Hudson, NY 10520
Re:
Site Plan – 73 Melrose Avenue
Dear Members:
We enclose eight hard copies of the updated Site Plan for this project.
Your Board approved the site plan for this proposed new house on May 6, 2025.
Now, the owner wishes to amend the Site Plan to modify the layout. The change will reduce the
impervious area as the long driveway on the original plan will be removed, as will the separate
garage building. Accordingly, the stormwater system will change to a 30-inch-high chamber
from the original 45-inch-high chamber, as the decrease in impervious area allows for a smaller
unit.
Our office provides the enclosed, complete plans for the project for your review and approval.
Please schedule this application at your next available meeting.
Ralph G. Mastromonaco
Cc: Bernard Doran, Owner
Ralph G. Mastromonaco, PE PC Consulting Engineers
RGM PE PC
Machine-extracted for search and reference — the original PDF is the authoritative version.