MINUTES SEPT 30 2026 1
minutes
45 pages
From the meeting:
Board Of Trustees — 2026-10-07
· our coverage →
Agenda item: Consent Agenda — Approval of Minutes — September 30th Regular Meeting
Minutes, 45 pages. Attached to agenda item: “Consent Agenda — Approval of Minutes — September 30th Regular Meeting”
Retrieved 2026-10-06 from the original source.
View the original file ↗
Extracted text
Regular Meeting of the Board of Trustees of the Village of Croton-on-Hudson, NY,
1
held on Wednesday, September 30, 2026, in the Georgianna Grant Meeting Room at
2
the Stanley Kellerhouse Municipal Building, Van Wyck Street, Croton-on-Hudson, NY
3
10520.
4
5
6
1. Mayor Pugh called the meeting to order at 7:00pm and led everyone in the
7
Pledge of Allegiance.
8
2. PUBLIC HEARINGS:
9
A motion to open the Public Hearing on Local Law Introductory No. 14 of
10
2026 to amend Chapter 223, Waterfront Revitalization, of the Village
11
Code to provide clarification in the review of land use applications for
12
consistency with the Local Waterfront Revitalization Plan was made by
13
Trustee Simon. Motion was seconded by Trustee Nachtaler and approved with
14
a 4-0 vote.
15
Public Comments:
16
Ed Riely, 110 Truesdale Drive, Croton on Hudson, asked if any type of
17
waterfront revitalization plan would cancel out the mega projects that this
18
Board has envisioned for properties adjacent to the river on Riverside Avenue
19
and adjacent to the railroad yard and Half Moon Bay. Mr. Riely stated that in
20
the past the highest priority was given to environmental issues such as views,
21
sound, noise, and pollution, but believes that deals were made with the State
22
and these environmental issues took a back seat to mega housing and asked
23
that the Board back-down on the process.
24
There being no further comments to come before the Board, a motion to close
25
the Public Hearing was made by Trustee Simon. Motion was seconded by
26
Trustee Nachtaler and approved with a 4-0 vote.
27
3. SEQRA Part II and LWRP Consistency Review for Local Law Introductory No.
28
14 of 2026 to amend Chapter 223, Waterfront Revitalization, of the Village
29
Code to provide clarification in the review of land use applications for
30
consistency with the Local Waterfront Revitalization Plan.
31
SEQRA Part II Review
32
Mayor Pugh
Trustee Simon
Village Manager Bryan Healy
Trustee Nachtaler
Village Attorney Lori Lee Dickson
Trustee Slippen
Village Treasurer Genette Toone
Village Board of Trustees
September 30, 2026
Local Law Introductory No. 14 of 2026 has been drafted to amend Chapter 223, Waterfront
Revitalization, of the Village Code to clarify the review process for land use applications for consistency
with the Local Waterfront Revitalization Plan.
No, or
small
impact
may
occur
Moderate
to large
impact
may
occur
1. Will the proposed action create a material conflict with an adopted land use plan
or zoning Regulations?
√
2. Will the proposed action result in a change in the use or intensity of use of land?
√
3. Will the proposed action impair the character or quality of the existing
community?
√
4. Will the proposed action have an impact on the environmental characteristics
that caused the establishment of a Critical Environmental Area (CEA)?
√
5. Will the proposed action result in an adverse change in the existing
level of traffic or affect existing infrastructure for mass transit, biking
or walkway? .
√
6. Will the proposed action cause an increase in the use of energy and it fails
to incorporate reasonably available energy conservation or renewable
energy opportunities?
√
7. Will the proposed action impact existing:
√
√
8. Will the proposed action impair the character or quality of important historic,
archaeological, architectural or aesthetic resources?
√
9. Will the proposed action result in an adverse change to natural resources
(e.g., wetlands, waterbodies, groundwater, air quality, flora and fauna)?
√
10. Will the proposed action result in an increase in the potential for erosion,
flooding or drainage problems?
√
11. Will the proposed action create a hazard to environmental resources or
human health?
√
1
LWRP Review
2
Policy
DEVELOPMENT POLICIES
Applicable
Yes/No
Consistent
Yes/No
Applicable
Yes/No
Consistent
Yes/No
Comments
Village Board of Trustees
September 30, 2026
1
Restore,
revitalize,
and
redevelop
deteriorated and underutilized waterfront
areas for commercial, industrial, cultural,
recreational and other compatible uses.
No
1A
Encourage integrated development of
Village property to assure fulfillment of
requirements relating to parking and
accessory uses of Metro-North train
station, while facilitating public access to
the bay area and recreational use.
No
1B
Encourage restoration of deteriorating
structures related to railroad use and
assure
appropriate
maintenance
and
screening to reduce visual impact.
No
1C
Encourage the appropriate re-use of the
old sewage treatment plant site at the
intersection of Route 9A and Municipal
Place.
No
2
Facilitate the siting of water dependent
uses and facilities on or adjacent to
coastal waters.
No
2A
Encourage water-enhanced commercial
uses where such uses complement water
dependent uses and do not result in
displacement of such uses.
No
3
Further develop the State’s existing major
ports of Albany, Buffalo, New York,
Ogdensburg and Oswego as centers of
commerce and industry, and encourage
the siting, in these port areas, including
those under the jurisdiction of State public
authorities, of land use and development
which is essential to, or in support of,
waterborne transportation of cargo and
people.
No
4
Strengthen the economic base of smaller
harbor
areas
by
encouraging
the
development and enhancement of those
traditional uses and activities which have
provided such areas with their unique
maritime identity.
No
5
Encourage the location of development in
areas where public services and facilities
essential to such development are
adequate.
No
5A
When feasible, development within the
Village should be directed within the
current service area of existing water and
sewer facilities or in close proximity to
areas where distribution lines currently
exist.
Yes
Yes
Yes
Yes
Board
Concurred
6
Expedite permit procedures in order to
facilitate the siting of development
activities at suitable locations
Yes
Yes
Yes
Yes
Board
Concurred
6A
To expedite permit procedures, the Village
shall coordinate all relevant local laws into
a development package for applicants
No
Village Board of Trustees
September 30, 2026
and/or make all local laws available to
applicants proposing development
activities.
7
Significant coastal fish and wildlife habitats
will be protected, preserved, and, where
practical, restored so as to maintain their
viability as habitats.
No
7A
The quality of the Croton River and Bay
Significant Coastal Fish and Wildlife
Habitat and Haverstraw Bay Significant
Fish and Wildlife Habitat shall be protected
and improved for conservation, economic,
aesthetic, recreational, and other public
uses and values. Its resources shall be
protected from the threat of pollution,
misuse, and mismanagement.
No
7B
Materials that can degrade water quality
and degrade or destroy the ecological
system of the Croton River and Bay
Significant Fish and Wildlife Habitat and
the Haverstraw Bay Significant Fish and
Wildlife Habitat shall not be disposed of or
allowed to drain in, or on land within, the
area of influence in the significant fish and
wildlife habitats.
No
7C
Storage of materials that can degrade
water quality and degrade or destroy the
ecological system of the Croton River and
Bay Significant Fish and Wildlife Habitat or
Haverstraw Bay Significant Fish and
Wildlife Habitat shall not be permitted
within the area of influence of the habitat
unless best available technology is used to
prevent adverse impacts to the habitat.
No
7D
Restoration of degraded ecological
elements of the Croton River and Bay and
Haverstraw Bay Significant Fish and
Wildlife Habitats and shorelands shall be
included in any programs for cleanup of
any adjacent toxic and hazardous waste
site
No
7E
Runoff from public and private parking lots
and from storm sewer overflows shall be
effectively managed so as to prevent oil,
grease, and other contaminants from
polluting surface and ground water and
impact to the significant fish and wildlife
habitats.
Yes
Yes
Yes
Yes
Board
Concurred
7F
Construction activity of any kind must not
cause a measurable increase in erosion or
flooding at the site of such activity, or
impact
other
locations.
activity in the Croton River and Hudson
River spawning areas shall be timed so
that spawning of anadromous fish species
and shellfish will not be adversely affected.
Yes
Yes
Yes
Yes
Board
Concurred
Village Board of Trustees
September 30, 2026
7G
Construction activity of any kind must not
cause significant degradation of water
quality or impact identified significant fish
and wildlife habitats.
Yes
Yes
Yes
Yes
Board
Concurred
7H
Habitat-related policies identified in the
Indian Brook-Croton Gorge Watershed
Conservation
Action
Plan
will
be
considered in actions proposed for these
areas (see Appendix C).
Yes
Yes
Yes
Yes
Board
Concurred
8
Protect fish and wildlife resources in the
coastal area from the introduction of
hazardous wastes and other pollutants
which bio-accumulate in the food chain, or
which cause significant sub-lethal or lethal
effect on those resources.
No
9
Expand recreational use of fish and wildlife
resources in coastal areas by increasing
access
to
existing
resources,
supplementing
existing
stocks,
and
developing new.
No
9A
Ensure continued recreational use and
public access to the rivers through Village
owned land adjacent to the railroad parking
lot, at Croton Point Park, at Senasqua and
Croton Landing Parks, along the Croton
River, and at the Croton Yacht Club. Efforts
should be made to increase opportunities
for public access and enjoyment in these
areas.
No
9B
Encourage passive recreational enjoyment
of the wildlife in the designated significant
fish and wildlife habitats, on the Audubon
Society sanctuaries, Jane Lytle Arboretum,
Gouveia Park and on other public or
private lands within the Village where
wildlife habitats are located, as well as the
protection of such resources.
No
10
Further
develop
commercial
finfish,
shellfish and crustacean resources in the
coastal
area
by
encouraging
the
construction of new, or improvement of
existing
onshore
commercial
fishing
facilities, increasing marketing of the
State's seafood products, maintaining
adequate
stocks
and
expanding
aquaculture facilities.
No
FLOODING & EROSION POLICIES
11
Buildings and other structures will be sited
in the coastal area so as to minimize
damage to property and the endangering
of human lives caused by flooding and
erosion.
Yes
Yes
Yes
Yes
Board
Concurred
12
Activities or development in the coastal
area will be undertaken so as to minimize
damage to natural resources and property
from flooding and erosion by protecting
natural
protective
features
including
Yes
Yes
Yes
Yes
Board
Concurred
Village Board of Trustees
September 30, 2026
beaches, dunes, barrier islands and bluffs.
12A
Every effort should be made to protect
Croton Point, a natural protective barrier to
Croton Bay from activities or development
that would increase erosion of or flooding
of the point.
No
13
The construction or reconstruction of
erosion protection structures shall be
undertaken only if they have a reasonable
probability of controlling erosion for at least
thirty years as demonstrated in design and
construction standards and/or assured
maintenance or replacement programs.
Yes
Yes
Yes
Yes
Board
Concurred
14
Activities and development, including the
construction or reconstruction of erosion
protection structures, shall be undertaken
so that there will be no measurable
increase in erosion or flooding at the site of
such activities or development, or at other
locations.
Yes
Yes
Yes
Yes
Board
Concurred
15
Mining, excavation or dredging in coastal
waters shall not significantly interfere with
the natural coastal processes which supply
beach materials to land adjacent to such
waters and shall be undertaken in a
manner which will not cause an increase in
erosion of such land.
No
16
Public funds shall only be used for erosion
protective structures where necessary to
protect human life, and new development
which requires a location within or adjacent
to an erosion hazard area to be able to
function, or existing development; and only
where the public benefits outweigh the
long term monetary and other costs
including the potential for increasing
erosion and adverse effects on natural
protective features.
No
17
Non-structural
measures
to
minimize
damage to natural resources and property
from flooding and erosion shall be used
whenever possible.
No
17A
Efforts to control erosion along the rivers
and on the steep slopes inland shall be of
a non-structural nature, wherever possible,
to minimize the visual impact of structural
measures.
No
18
To safeguard the vital economic, social
and environmental interests of the State
and of its citizens, proposed major actions
in the coastal area must give full
consideration to those interests, and to the
safeguards
which
the
State
has
established to protect valuable coastal
resource areas
Yes
Yes
Yes
Yes
Board
Concurred
PUBLIC ACCESS POLICIES
Village Board of Trustees
September 30, 2026
19
Protect, maintain, and increase the level
and types of access to public water-
related recreation resources and facilities
Yes
Yes
Yes
Yes
Board
Concurred
19A
Encourage the linkage of open space from
upland areas to and along the Hudson and
Croton Rivers in the form of a trail or
walkway system.
No
19B
Increase public access to areas that offer
physical and visual connection to the
Hudson River or Croton River and Bay.
Yes
Yes
Yes
Yes
Board
Concurred
19C
Encourage the improvement of public
transportation, when feasible, where water
dependent and water-enhanced recreation
activities are located.
No
19D
Improve and maintain access to Croton
River and Bay at the Village-owned Echo
Canoe Launch south of the Village parking
lots at the Croton-Harmon Station
No
20
Access to the publicly owned foreshore
and to lands immediately adjacent to the
foreshore or the water's edge that are
publicly owned shall be provided and it
should be provided in a manner compatible
with adjoining uses. 19 Protect, maintain,
and increase the level and types of access
to
public
water-related
recreation
resources and facilities.
No
21
Water dependent and water enhanced
recreation
will
be
encouraged
and
facilitated and will be given priority over
non-water related uses along the coast.
No
21A
Boating and fishing activities should be
encouraged provided that they do not
restrict other water-related recreational
opportunities and are undertaken in a
manner compatible with existing water-
dependent uses.
No
22
Development when located adjacent to the
shore
will
provide
for
water-related
recreation
whenever
such
use
is
compatible with reasonably anticipated
demand
for
such
activities
and
is
compatible with the primary purpose of the
development.
No
HISTORIC AND SCENIC QUALITY
POLICIES
23
Protect, enhance and restore structures,
districts, areas or sites that are of
significance in the history, architecture,
archaeology or culture of the State, its
communities, or the Nation.
Yes
Yes
Yes
Yes
Board
Concurred
24
Prevent impairment of scenic resources of
statewide
significance.
(The
nearest
scenic area of statewide significance
(SASS) is the Bear Mountain Park subunit
No
Village Board of Trustees
September 30, 2026
of the Hudson Highlands SASS which is
north of the Village)
25
Protect, restore or enhance natural and
man-made resources which are not
identified
as
being
of
statewide
significance, but which contribute to the
overall scenic quality of the coastal area.
Yes
Yes
Yes
Yes
Board
Concurred
25A
Establish and protect identified public
viewsheds of the Hudson River, including
but not limited to the public views of the
Hudson River from the western shoreline
of the Village, and of the Croton River and
Gorge.
Yes
Yes
Yes
Yes
Board
Concurred
ENERGY AND ICE MANAGEMENT
POLICIES
No
26
Conserve and protect agricultural lands in
the State’s coastal area.
No
27
Decisions on the siting and construction of
major energy facilities in the coastal area
will be based on public energy needs,
compatibility of such facilities with the
environment, and the facility's need for a
shorefront location.
Yes
Yes
Yes
Yes
Board
Concurred
28
Ice management practices shall not
interfere
with
the
production
of
hydroelectric power, damage significant
coastal fish and wildlife and their habitats,
or increase shoreline erosion or flooding..
No
29
The development of offshore uses and
resources, including renewable energy
resources, shall accommodate New York’s
long-standing ocean and Great Lakes
industries,
such
as
commercial
and
recreational
fishing
and
maritime
commerce, and the ecological functions of
habitats important to New York.
No
WATER AND AIR RESOURCES
POLICIES
30
Municipal, industrial, and
commercial
discharge of pollutants, including but not
limited to, toxic and hazardous substances,
into coastal waters will conform to State
and National water quality standards.
Yes
Yes
Yes
Yes
Board
Concurred
30A
Existing rail services and transportation-
related facilities shall not dispose of any
regulated materials in coastal waters until
all such regulated materials have been
tested by the State for conformance with
water quality standards.
No
31
State coastal area policies and
management objectives of approved local
waterfront revitalization programs will be
considered while reviewing coastal water
classifications and while modifying water
quality standards; however, those waters
already overburdened with contaminants
No
Village Board of Trustees
September 30, 2026
will be recognized as being a
development constraint.
32
Encourage the use of alternative or
innovative sanitary waste systems in small
communities
where
the
costs
of
conventional facilities are unreasonably
high, given the size of the existing tax base
of these communities.
No
33
Best Management Practices will be used to
ensure the control of stormwater runoff and
combined sewer overflows draining into
coastal waters.
Yes
Yes
Yes
Yes
Board
Concurred
33A
The flow of stormwater discharge shall be
controlled to limit the flow of pollutants from
street, and parking areas, etc. directly into
the rivers and water bodies.
Yes
Yes
Yes
Yes
Board
Concurred
34
Discharge of waste materials into coastal
waters from vessels subject to State
jurisdiction will be limited so as to protect
significant fish and wildlife habitats,
recreational areas and water supply
areas..
No
34A
Moored structures or marine vessels shall
not discharge ballast water or other
releases into the waterway.
No
35
Dredging and filling in coastal waters and
disposal of dredged material will be
undertaken in a manner that meets existing
State permit requirements, and protects
significant fish and wildlife habitats, scenic
resources, natural protective features,
important agricultural lands, and wetlands.
No
36
Activities related to the shipment and
storage of petroleum and other hazardous
materials will be conducted in a manner
that will prevent or at least minimize spills
into coastal waters; all practicable efforts
will be undertaken to expedite the cleanup
of such discharges; and restitution for
damages will be required when these spills
occur.
No
37
Best management practices will be utilized
to minimize the non-point discharge of
excess nutrients, organics and eroded
soils into coastal waters.
Yes
Yes
Yes
Yes
Board
Concurred
37A
Control of the development of hilltops and
steep slopes should be exerted in order to
prevent erosion and minimize runoff and
flooding from new construction.
Yes
Yes
Yes
Yes
Board
Concurred
38
The quality and quantity of surface water
and
ground
water
supplies
will be
conserved
and
protected,
particularly
where such waters constitute the primary
or sole source of water supply.
Yes
Yes
Yes
Yes
Board
Concurred
39
The transport, storage, treatment and
disposal of solid wastes, particularly
Yes
Yes
Yes
Yes
Board
Concurred
Village Board of Trustees
September 30, 2026
hazardous wastes, within coastal areas will
be conducted in such a manner so as to
protect groundwater and surface water
supplies, significant fish and wildlife
habitats,
recreation
areas,
important
agricultural lands and scenic resources.
40
Effluent discharged from major steam
electric generating and industrial facilities
into coastal waters will not be unduly
injurious to fish and wildlife and shall
conform to State water quality standards..
No
41
Land use or development in the coastal
area will not cause national or State air
quality standards to be violated.
No
42
Coastal management policies will be
considered if the State reclassifies land
areas pursuant to the prevention of
significant deterioration regulations of the
Federal Clean Air Act.
No
43
Land use or development in the coastal
area must not cause the generation of
significant amounts of acid rain precursors:
nitrates and sulfates.
No
WETLAND POLICY
44
Preserve and protect tidal and freshwater
wetlands and preserve the benefits derived
from these areas.
Yes
Yes
Yes
Yes
Board
Concurred
44A
Wetlands, water bodies and watercourses
shall be protected by preventing damage
from erosion or siltation, minimizing
disturbance, preserving natural habitats
and protecting against flood and pollution.
Yes
Yes
Yes
Yes
Board
Concurred
LWRP SECTION IV PROPOSED LAND
USES AND PROJECTS
CROTON RIVER BASIN PROJECTS
1.
ENSURE
MAINTENANCE
OF
NEW
CROTON DAM CONSERVATION FLOW
Maintaining natural river flows below
water supply reservoirs is inherently
complicated and requires a difficult
balance between human demands and
sustainable flows to conserve a river’s
ecological health
No
No
No
No
2.
ADDRESS DRAINAGE SYSTEMS THAT
LEAD TO EROSION ON STEEP SLOPES
The objective of this project is to promote
activities that will control soil erosion and
sedimentation caused by stormwater
Yes
Yes
Yes
Yes
Board
Concurred
Village Board of Trustees
September 30, 2026
runoff. These issues are most significant
along the steep banks of the Croton River
Gorge
3.
FACILITATE UPGRADES TO CATCH
BASINS AND OUTFALLS TO ADDRESS
FLOATABLES IN CROTON BAY The
intent of this project is to control
stormwater runoff discharges and other
pollutants from entering Croton Bay.
Protecting the ecological health of Croton
Bay and River is a priority for the Village.
Yes
Yes
Yes
Yes
Board
Concurred
4.
FACILITATE UPGRADES TO CROTON-
HARMON PARKING LOT TO ADDRESS
FLOATABLES IN CROTON BAY The
parking facility is currently overwhelmed
by asphalt paving with rows of cars. There
is minimal landscaping or greenery, and in
certain areas, parking directly abuts
wetland areas in Croton Bay. The Village
should consider implementing green
infrastructure within the parking lot in
order to capture runoff onsite and reduce
sewer overflows.
No
No
No
No
5.
IMPROVE ECHO CANOE LAUNCH AND
VILLAGE-OWNED
LAND
AT
THE
SOUTHERN
END
OF
THE
TRAIN
STATION PARKING LOT
This project supports the continued
improvement of this recreational area to
enhance public access to the Croton River
and Bay and the Hudson River
No
No
No
No
6.
RELOCATE VILLAGE DPW FACILITY,
SALT SHED AND MATERIAL STORAGE
AREA
The DPW operates a salt storage shed at
the southern end of the Croton-Harmon
parking lot. There is also an uncovered
storage area near the salt shed for rocks
and other construction materials which
can leach directly into Croton Bay from
the facility.
No
No
No
No
HUDSON RIVERFRONT PROJECTS
Village Board of Trustees
September 30, 2026
7.
FACILITATE ACCESS TO THE HUDSON
RIVER WATERFRONT
A recurring comment from public input
during this LWRP process and prior plans
was the need to improve access to the
Hudson River waterfront for vehicles,
pedestrians, and bicyclists. Although there
have been some improvements such as
the Brook Street pedestrian bridge, in
general, access to the waterfront is
limited, and difficult in some locations.
Yes
Yes
Yes
Yes
Board
Concurred
8.
FACILITATE
CROTON
YACHT
CLUB/CROTON
LANDING
IMPROVEMENTS
The concept of a waterfront restaurant, or
another use at the southern end of Croton
Landing Park, adjacent to the Croton
Yacht Club, has been discussed by the
Village for years. Parking is also an issue
as there is already insufficient on-site
parking at Croton Landing Park to satisfy
demand during busy hours.
Yes
Yes
Yes
Yes
Board
Concurred
9.
IMPLEMENT SEGMENT OF RIVERWALK
TRAIL FROM CROTON LANDING PARK
TO OSCAWANA COUNTY PARK
According to the Hudson River Trailway
Plan (2003), Westchester County has
proposed a 1-mile trail along the Hudson
River that would connect Croton Landing
Park with Oscawana County Park in
Cortlandt. This trail would fill a gap
between the River Walk trails at these two
parks.
No
No
No
No
VILLAGE -WIDE PROJECTS
10.
UNDERTAKE
MANAGEMENT
AND
CAPITAL IMPROVEMENT PLAN FOR
VILLAGE
PARKS,
TRAILS,
OPEN
SPACES AND MEMORIALS
This project supports the creation of a
Parks Maintenance and Capital
Improvement Plan to address ongoing
care and protection of existing parks,
open spaces, and trails. The goal would
No
No
No
No
Village Board of Trustees
September 30, 2026
be to provide an action plan for regular
maintenance and target capital
improvements when needed.
11.
DEVELOP PLAN FOR FUTURE USE OF
GOUVEIA PARK
The purpose of this project is for the
Village to create a conceptual plan that
will examine how to best utilize the
Gouveia Park, a 15.63-acre site acquired
by the Village.
Yes
Yes
Yes
Yes
Board
Concurred
1
2
4. LWRP Consistency Review for the MTA Signal Project along the Metro-North
3
Railroad Hudson Line.
4
5
Policy
DEVELOPMENT POLICIES
Applicable
Yes/No
Consistent
Yes/No
Applicable
Yes/No
Consistent
Yes/No
Comments
1
Restore,
revitalize,
and
redevelop
deteriorated and underutilized waterfront
areas for commercial, industrial, cultural,
recreational and other compatible uses.
No
1A
Encourage integrated development of
Village property to assure fulfillment of
requirements relating to parking and
accessory uses of Metro-North train
station, while facilitating public access to
the bay area and recreational use.
No
1B
Encourage restoration of deteriorating
structures related to railroad use and
assure
appropriate
maintenance
and
screening to reduce visual impact.
No
1C
Encourage the appropriate re-use of the
old sewage treatment plant site at the
intersection of Route 9A and Municipal
Place.
No
2
Facilitate the siting of water dependent
uses and facilities on or adjacent to
coastal waters.
No
2A
Encourage water-enhanced commercial
uses where such uses complement water
dependent uses and do not result in
displacement of such uses.
No
3
Further develop the State’s existing major
ports of Albany, Buffalo, New York,
Ogdensburg and Oswego as centers of
commerce and industry, and encourage
the siting, in these port areas, including
those under the jurisdiction of State public
authorities, of land use and development
which is essential to, or in support of,
No
Village Board of Trustees
September 30, 2026
waterborne transportation of cargo and
people.
4
Strengthen the economic base of smaller
harbor
areas
by
encouraging
the
development and enhancement of those
traditional uses and activities which have
provided such areas with their unique
maritime identity.
No
5
Encourage the location of development in
areas where public services and facilities
essential to such development are
adequate.
No
5A
When feasible, development within the
Village should be directed within the
current service area of existing water and
sewer facilities or in close proximity to
areas where distribution lines currently
exist.
No
6
Expedite permit procedures in order to
facilitate the siting of development
activities at suitable locations
No
6A
To expedite permit procedures, the Village
shall coordinate all relevant local laws into
a development package for applicants
and/or make all local laws available to
applicants proposing development
activities.
No
FISH & WILDLIFE POLICIES
7
Significant coastal fish and wildlife habitats
will be protected, preserved, and, where
practical, restored so as to maintain their
viability as habitats.
Yes
Yes
Yes
Yes
Board
Concurred
7A
The quality of the Croton River and Bay
Significant Coastal Fish and Wildlife
Habitat and Haverstraw Bay Significant
Fish and Wildlife Habitat shall be protected
and improved for conservation, economic,
aesthetic, recreational, and other public
uses and values. Its resources shall be
protected from the threat of pollution,
misuse, and mismanagement.
No
7B
Materials that can degrade water quality
and degrade or destroy the ecological
system of the Croton River and Bay
Significant Fish and Wildlife Habitat and
the Haverstraw Bay Significant Fish and
Wildlife Habitat shall not be disposed of or
allowed to drain in, or on land within, the
area of influence in the significant fish and
wildlife habitats.
Yes
Yes
Yes
Yes
Board
Concurred
7C
Storage of materials that can degrade
water quality and degrade or destroy the
ecological system of the Croton River and
Bay Significant Fish and Wildlife Habitat or
Haverstraw Bay Significant Fish and
Wildlife Habitat shall not be permitted
within the area of influence of the habitat
No
Village Board of Trustees
September 30, 2026
unless best available technology is used to
prevent adverse impacts to the habitat.
7D
Restoration of degraded ecological
elements of the Croton River and Bay and
Haverstraw Bay Significant Fish and
Wildlife Habitats and shorelands shall be
included in any programs for cleanup of
any adjacent toxic and hazardous waste
site
No
7E
Runoff from public and private parking lots
and from storm sewer overflows shall be
effectively managed so as to prevent oil,
grease, and other contaminants from
polluting surface and ground water and
impact to the significant fish and wildlife
habitats.
No
7F
Construction activity of any kind must not
cause a measurable increase in erosion or
flooding at the site of such activity, or
impact
other
locations.
activity in the Croton River and Hudson
River spawning areas shall be timed so
that spawning of anadromous fish species
and shellfish will not be adversely affected.
Yes
Yes
Yes
Yes
Board
Concurred
7G
Construction activity of any kind must not
cause significant degradation of water
quality or impact identified significant fish
and wildlife habitats.
Yes
Yes
Yes
Yes
Board
Concurred
7H
Habitat-related policies identified in the
Indian Brook-Croton Gorge Watershed
Conservation
Action
Plan
will
be
considered in actions proposed for these
areas (see Appendix C).
No
8
Protect fish and wildlife resources in the
coastal area from the introduction of
hazardous wastes and other pollutants
which bio-accumulate in the food chain, or
which cause significant sub-lethal or lethal
effect on those resources.
Yes
Yes
Yes
Yes
Board
Concurred
9
Expand recreational use of fish and wildlife
resources in coastal areas by increasing
access
to
existing
resources,
supplementing
existing
stocks,
and
developing new.
No
9A
Ensure continued recreational use and
public access to the rivers through Village
owned land adjacent to the railroad parking
lot, at Croton Point Park, at Senasqua and
Croton Landing Parks, along the Croton
River, and at the Croton Yacht Club. Efforts
should be made to increase opportunities
for public access and enjoyment in these
areas.
No
9B
Encourage passive recreational enjoyment
of the wildlife in the designated significant
fish and wildlife habitats, on the Audubon
Society sanctuaries, Jane Lytle Arboretum,
Gouveia Park and on other public or
No
Village Board of Trustees
September 30, 2026
private lands within the Village where
wildlife habitats are located, as well as the
protection of such resources.
10
Further
develop
commercial
finfish,
shellfish and crustacean resources in the
coastal
area
by
encouraging
the
construction of new, or improvement of
existing
onshore
commercial
fishing
facilities, increasing marketing of the
State's seafood products, maintaining
adequate
stocks
and
expanding
aquaculture facilities.
No
FLOODING & EROSION POLICIES
11
Buildings and other structures will be sited
in the coastal area so as to minimize
damage to property and the endangering
of human lives caused by flooding and
erosion.
Yes
Yes
Yes
Yes
Board
Concurred
12
Activities or development in the coastal
area will be undertaken so as to minimize
damage to natural resources and property
from flooding and erosion by protecting
natural
protective
features
including
beaches, dunes, barrier islands and bluffs.
Yes
Yes
Yes
Yes
Board
Concurred
12A
Every effort should be made to protect
Croton Point, a natural protective barrier to
Croton Bay from activities or development
that would increase erosion of or flooding
of the point.
No
13
The construction or reconstruction of
erosion protection structures shall be
undertaken only if they have a reasonable
probability of controlling erosion for at least
thirty years as demonstrated in design and
construction standards and/or assured
maintenance or replacement programs.
Yes
Yes
Yes
Yes
Board
Concurred
14
Activities and development, including the
construction or reconstruction of erosion
protection structures, shall be undertaken
so that there will be no measurable
increase in erosion or flooding at the site of
such activities or development, or at other
locations.
Yes
Yes
Yes
Yes
Board
Concurred
15
Mining, excavation or dredging in coastal
waters shall not significantly interfere with
the natural coastal processes which supply
beach materials to land adjacent to such
waters and shall be undertaken in a
manner which will not cause an increase in
erosion of such land.
No
16
Public funds shall only be used for erosion
protective structures where necessary to
protect human life, and new development
which requires a location within or adjacent
to an erosion hazard area to be able to
function, or existing development; and only
No
Village Board of Trustees
September 30, 2026
where the public benefits outweigh the
long term monetary and other costs
including the potential for increasing
erosion and adverse effects on natural
protective features.
17
Non-structural
measures
to
minimize
damage to natural resources and property
from flooding and erosion shall be used
whenever possible.
No
17A
Efforts to control erosion along the rivers
and on the steep slopes inland shall be of
a non-structural nature, wherever possible,
to minimize the visual impact of structural
measures.
No
18
To safeguard the vital economic, social
and environmental interests of the State
and of its citizens, proposed major actions
in the coastal area must give full
consideration to those interests, and to the
safeguards
which
the
State
has
established to protect valuable coastal
resource areas
Yes
Yes
Yes
Yes
Board
Concurred
PUBLIC ACCESS POLICIES
19
Protect, maintain, and increase the level
and types of access to public water-
related recreation resources and facilities
No
19A
Encourage the linkage of open space from
upland areas to and along the Hudson and
Croton Rivers in the form of a trail or
walkway system.
No
19B
Increase public access to areas that offer
physical and visual connection to the
Hudson River or Croton River and Bay.
No
19C
Encourage the improvement of public
transportation, when feasible, where water
dependent and water-enhanced recreation
activities are located.
Yes
Yes
Yes
Yes
Board
Concurred
19D
Improve and maintain access to Croton
River and Bay at the Village-owned Echo
Canoe Launch south of the Village parking
lots at the Croton-Harmon Station
No
20
Access to the publicly owned foreshore
and to lands immediately adjacent to the
foreshore or the water's edge that are
publicly owned shall be provided and it
should be provided in a manner compatible
with adjoining uses. 19 Protect, maintain,
and increase the level and types of access
to
public
water-related
recreation
resources and facilities.
No
21
Water dependent and water enhanced
recreation
will
be
encouraged
and
facilitated and will be given priority over
non-water related uses along the coast.
No
21A
Boating and fishing activities should be
encouraged provided that they do not
restrict other water-related recreational
No
Village Board of Trustees
September 30, 2026
opportunities and are undertaken in a
manner compatible with existing water-
dependent uses.
22
Development when located adjacent to the
shore
will
provide
for
water-related
recreation
whenever
such
use
is
compatible with reasonably anticipated
demand
for
such
activities
and
is
compatible with the primary purpose of the
development.
No
HISTORIC AND SCENIC QUALITY
POLICIES
23
Protect, enhance and restore structures,
districts, areas or sites that are of
significance in the history, architecture,
archaeology or culture of the State, its
communities, or the Nation.
No
24
Prevent impairment of scenic resources of
statewide
significance.
(The
nearest
scenic area of statewide significance
(SASS) is the Bear Mountain Park subunit
of the Hudson Highlands SASS which is
north of the Village)
No
25
Protect, restore or enhance natural and
man-made resources which are not
identified
as
being
of
statewide
significance, but which contribute to the
overall scenic quality of the coastal area.
No
25A
Establish and protect identified public
viewsheds of the Hudson River, including
but not limited to the public views of the
Hudson River from the western shoreline
of the Village, and of the Croton River and
Gorge.
No
ENERGY AND ICE MANAGEMENT
POLICIES
No
26
Conserve and protect agricultural lands in
the State’s coastal area.
No
27
Decisions on the siting and construction of
major energy facilities in the coastal area
will be based on public energy needs,
compatibility of such facilities with the
environment, and the facility's need for a
shorefront location.
28
Ice management practices shall not
interfere
with
the
production
of
hydroelectric power, damage significant
coastal fish and wildlife and their habitats,
or increase shoreline erosion or flooding..
No
29
The development of offshore uses and
resources, including renewable energy
resources, shall accommodate New York’s
long-standing ocean and Great Lakes
industries,
such
as
commercial
and
No
Village Board of Trustees
September 30, 2026
recreational
fishing
and
maritime
commerce, and the ecological functions of
habitats important to New York.
30
Municipal, industrial, and
commercial
discharge of pollutants, including but not
limited to, toxic and hazardous substances,
into coastal waters will conform to State
and National water quality standards.
No
30A
Existing rail services and transportation-
related facilities shall not dispose of any
regulated materials in coastal waters until
all such regulated materials have been
tested by the State for conformance with
water quality standards.
Yes
Yes
Yes
Yes
Board
Concurred
31
State coastal area policies and
management objectives of approved local
waterfront revitalization programs will be
considered while reviewing coastal water
classifications and while modifying water
quality standards; however, those waters
already overburdened with contaminants
will be recognized as being a
development constraint.
No
32
Encourage the use of alternative or
innovative sanitary waste systems in small
communities
where
the
costs
of
conventional facilities are unreasonably
high, given the size of the existing tax base
of these communities.
No
33
Best Management Practices will be used to
ensure the control of stormwater runoff and
combined sewer overflows draining into
coastal waters.
Yes
Yes
Yes
Yes
Board
Concurred
33A
The flow of stormwater discharge shall be
controlled to limit the flow of pollutants from
street, and parking areas, etc. directly into
the rivers and water bodies.
Yes
Yes
Yes
Yes
Board
Concurred
34
Discharge of waste materials into coastal
waters from vessels subject to State
jurisdiction will be limited so as to protect
significant fish and wildlife habitats,
recreational areas and water supply
areas..
No
34A
Moored structures or marine vessels shall
not discharge ballast water or other
releases into the waterway.
No
35
Dredging and filling in coastal waters and
disposal of dredged material will be
undertaken in a manner that meets existing
State permit requirements, and protects
significant fish and wildlife habitats, scenic
resources, natural protective features,
important agricultural lands, and wetlands.
No
36
Activities related to the shipment and
storage of petroleum and other hazardous
No
Village Board of Trustees
September 30, 2026
materials will be conducted in a manner
that will prevent or at least minimize spills
into coastal waters; all practicable efforts
will be undertaken to expedite the cleanup
of such discharges; and restitution for
damages will be required when these spills
occur.
37
Best management practices will be utilized
to minimize the non-point discharge of
excess nutrients, organics and eroded
soils into coastal waters.
Yes
Yes
Yes
Yes
Board
Concurred
37A
Control of the development of hilltops and
steep slopes should be exerted in order to
prevent erosion and minimize runoff and
flooding from new construction.
No
38
The quality and quantity of surface water
and
ground
water
supplies
will be
conserved
and
protected,
particularly
where such waters constitute the primary
or sole source of water supply.
No
39
The transport, storage, treatment and
disposal of solid wastes, particularly
hazardous wastes, within coastal areas will
be conducted in such a manner so as to
protect groundwater and surface water
supplies, significant fish and wildlife
habitats,
recreation
areas,
important
agricultural lands and scenic resources.
No
40
Effluent discharged from major steam
electric generating and industrial facilities
into coastal waters will not be unduly
injurious to fish and wildlife and shall
conform to State water quality standards..
No
41
Land use or development in the coastal
area will not cause national or State air
quality standards to be violated.
No
42
Coastal management policies will be
considered if the State reclassifies land
areas pursuant to the prevention of
significant deterioration regulations of the
Federal Clean Air Act.
No
43
Land use or development in the coastal
area must not cause the generation of
significant amounts of acid rain precursors:
nitrates and sulfates.
No
WETLAND POLICY
44
Preserve and protect tidal and freshwater
wetlands and preserve the benefits derived
from these areas.
Yes
Yes
Yes
Yes
Board
Concurred
44A
Wetlands, water bodies and watercourses
shall be protected by preventing damage
from erosion or siltation, minimizing
disturbance, preserving natural habitats
and protecting against flood and pollution.
Yes
Yes
Yes
Yes
Board
Concurred
Village Board of Trustees
September 30, 2026
LWRP SECTION IV PROPOSED LAND
USES AND PROJECTS
CROTON RIVER BASIN PROJECTS
1.
ENSURE MAINTENANCE OF NEW
CROTON DAM CONSERVATION FLOW
Maintaining natural river flows below water
supply reservoirs is inherently complicated
and requires a difficult balance between
human demands and sustainable flows to
conserve a river’s ecological health
No
No
No
No
2.
ADDRESS DRAINAGE SYSTEMS THAT
LEAD TO EROSION ON STEEP
SLOPES
The objective of this project is to promote
activities that will control soil erosion and
sedimentation
caused
by
stormwater
runoff. These issues are most significant
along the steep banks of the Croton River
Gorge
No
No
No
No
3.
FACILITATE UPGRADES TO CATCH
BASINS AND OUTFALLS TO ADDRESS
FLOATABLES IN CROTON BAY The
intent of this project is to control stormwater
runoff discharges and other pollutants from
entering
Croton
Bay.
Protecting
the
ecological health of Croton Bay and River
is a priority for the Village.
Yes
Yes
Yes
Yes
Board Concurred
4.
FACILITATE UPGRADES TO CROTON-
HARMON PARKING LOT TO ADDRESS
FLOATABLES IN CROTON BAY The
parking facility is currently overwhelmed by
asphalt paving with rows of cars. There is
minimal landscaping or greenery, and in
certain areas, parking directly abuts
wetland areas in Croton Bay. The Village
should
consider
implementing
green
infrastructure within the parking lot in order
to capture runoff onsite and reduce sewer
overflows.
No
No
No
No
5.
IMPROVE ECHO CANOE LAUNCH AND
VILLAGE-OWNED LAND AT THE
SOUTHERN END OF THE TRAIN
STATION PARKING LOT
This
project
supports
the
continued
improvement of this recreational area to
enhance public access to the Croton River
and Bay and the Hudson River
No
No
No
No
6.
RELOCATE VILLAGE DPW FACILITY,
SALT SHED AND MATERIAL STORAGE
AREA
The DPW operates a salt storage shed at
the southern end of the Croton-Harmon
parking lot. There is also an uncovered
storage area near the salt shed for rocks
and other construction materials which can
leach directly into Croton Bay from the
facility.
No
No
No
No
Village Board of Trustees
September 30, 2026
HUDSON RIVERFRONT PROJECTS
7.
FACILITATE ACCESS TO THE
HUDSON RIVER WATERFRONT
A recurring comment from public input
during this LWRP process and prior plans
was the need to improve access to the
Hudson River waterfront for vehicles,
pedestrians, and bicyclists. Although there
have been some improvements such as
the Brook Street pedestrian bridge, in
general, access to the waterfront is limited,
and difficult in some locations.
No
No
No
No
8.
FACILITATE CROTON YACHT
CLUB/CROTON LANDING
IMPROVEMENTS
The concept of a waterfront restaurant, or
another use at the southern end of Croton
Landing Park, adjacent to the Croton Yacht
Club, has been discussed by the Village for
years. Parking is also an issue as there is
already insufficient on-site parking at
Croton Landing Park to satisfy demand
during busy hours.
No
No
No
No
9.
IMPLEMENT SEGMENT OF
RIVERWALK TRAIL FROM CROTON
LANDING PARK TO OSCAWANA
COUNTY PARK
According to the Hudson River Trailway
Plan (2003), Westchester County has
proposed a 1-mile trail along the Hudson
River that would connect Croton Landing
Park with Oscawana County Park in
Cortlandt. This trail would fill a gap
between the River Walk trails at these two
parks.
No
No
No
No
VILLAGE -WIDE PROJECTS
10.
UNDERTAKE MANAGEMENT AND
CAPITAL IMPROVEMENT PLAN FOR
VILLAGE PARKS, TRAILS, OPEN
SPACES AND MEMORIALS
This project supports the creation of a
Parks
Maintenance
and
Capital
Improvement Plan to address ongoing care
and protection of existing parks, open
spaces, and trails. The goal would be to
provide
an
action
plan
for
regular
maintenance
and
target
capital
improvements when needed.
No
No
No
No
11.
DEVELOP PLAN FOR FUTURE USE OF
GOUVEIA PARK
The purpose of this project is for the Village
to create a conceptual plan that will
examine how to best utilize the Gouveia
Park, a 15.63-acre site acquired by the
Village.
No
No
No
No
1
Resolution #227-2026
2
Village Board of Trustees
September 30, 2026
On motion of TRUSTEE NACHTALER, seconded by TRUSTEE SIMON, the following
1
resolution was adopted by the Board of Trustees of the Village of Croton-on-Hudson,
2
New York with a 4-0 vote.
3
WHEREAS, the Village of Croton-on-Hudson has adopted a Local Waterfront
4
Revitalization Program (LWRP) to guide the use of its waterfront and adjacent areas
5
in a manner consistent with sound waterfront planning and environmental protection
6
principles; and
7
WHEREAS, the Village of Croton-on-Hudson has received a referral for the review of
8
the signal system upgrade proposed by the Metropolitan Transportation Authority
9
along the Metro-North Railroad Hudson Line (“the proposed project”); and
10
WHEREAS, on August 25, 2026, and September 16, 2026, the Village’s Waterfront
11
Advisory Committee (WAC) reviewed the proposed project for consistency with the
12
policies of the LWRP; and
13
WHEREAS, the WAC has evaluated the policies of the LWRP and determined that the
14
following policies are relevant to the proposed project:
15
POLICY 7: Significant coastal fish and wildlife habitats will be protected,
16
preserved, and, where practical, restored so as to maintain their viability as
17
habitats.
18
POLICY 7B: Materials that can degrade water quality and degrade or destroy
19
the ecological system of the Croton River and Bay Significant Fish and Wildlife
20
Habitat and the Haverstraw Bay Significant Fish and Wildlife Habitat shall not
21
be disposed of or allowed to drain in, or on land withing the area of influence
22
in the significant fish and wildlife habitats.
23
POLICY 7F: Construction activity of any kind must not cause a measurable
24
increase in erosion or flooding at the site of such activity, or impact other
25
locations. Construction activity in the Croton River and Hudson River spawning
26
areas shall be timed so that the spawning of anadromous fish species and
27
shellfish will not be adversely affected.
28
POLICY 7G: Construction activity of any kind must not cause significant
29
degradation of water quality or impact identified significant fish and wildlife
30
habitats.
31
Village Board of Trustees
September 30, 2026
POLICY 8: Protect fish and wildlife resources in the coastal area from the
1
introduction of hazardous wastes and other pollutants which bio-accumulate in
2
the food chain, or which cause significant sub-lethal effect on those resources.
3
POLICY 11: Buildings and other structures will be sited in the coastal area so
4
as to minimize damage to property and the endangering of human lives caused
5
by flooding and erosion.
6
POLICY 12: Activities or development in the coastal area will be undertaken
7
so as to minimize damage to natural resources and property from flooding and
8
erosion by protecting natural protective features including beaches, dunes,
9
barrier islands and bluffs.
10
POLICY 13: The construction or reconstruction of erosion protection
11
structures shall be undertaken only if they have a reasonable probability of
12
controlling erosion for at least thirty years as demonstrated in design and
13
construction standards and/or assured maintenance or replacement programs.
14
POLICY 14: Activities and development, including the construction or
15
reconstruction of erosion protection structures, shall be undertaken so that
16
there will be no measurable increase in erosion or flooding at the site of such
17
activities or development, or at other locations.
18
POLICY 18: To safeguard the vital economic, social, and environmental
19
interests of the State and of its citizens, proposed major actions in the coastal
20
area must give full consideration to those interests, and to the safeguards
21
which the State has established to protect.
22
POLICY 19C: Encourage the improvement of public transportation, when
23
feasible, where water-dependent and water-enhanced recreation activities are
24
located.
25
POLICY 30A: Existing rail services and transportation-related facilities shall
26
not dispose of any regulated materials in coastal waters until all such regulated
27
materials have been tested by the State for conformance with water quality
28
standards.
29
POLICY 33: Best Management Practices will be used to ensure the control of
30
stormwater runoff and combined sewer overflows draining into coastal waters.
31
Village Board of Trustees
September 30, 2026
POLICY 33A: The flow of stormwater discharge shall be controlled to limit the
1
flow of pollutants from street and parking areas, etc. directly into the rivers
2
and water bodies.
3
POLICY 37: Best management practices will be utilized to minimize the non-
4
point discharge of excess nutrients, organics and eroded soils into coastal
5
waters.
6
POLICY 44: Preserve and protect tidal and freshwater wetlands and preserve
7
the benefits derived from these areas.
8
POLICY 44A: Wetlands, water bodies and watercourses shall be protected by
9
preventing damage from erosion or siltation, minimizing disturbance,
10
preserving natural habitats and protecting against flood and pollution.
11
12
WHEREAS, the WAC also reviewed the 11 proposed land uses and projects contained
13
in Section IV of the LWRP and determined the following policy was applicable:
14
POLICY 3: Facilitate upgrades to catch basins and outfalls to address
15
floatables in Croton Bay. The intent of this project is to control stormwater
16
runoff discharges and other pollutants from entering Croton Bay. Protecting
17
the ecological health of Croton Bay and River is a priority for the Village.
18
WHEREAS, the WAC has issued its recommendation of consistency with the LWRP,
19
NOW THEREFORE BE IT RESOLVED: that the Village Board of Trustees hereby
20
declares the signal system upgrade proposed by the Metropolitan Transportation
21
Authority along the Metro-North Railroad Hudson Line to be consistent with the
22
Village’s Local Waterfront Revitalization Program.
23
5. RESPONSES TO QUESTIONS SUBMITTED BY EMAIL: None
24
6. PUBLIC COMMENTS ON AGENDA ITEMS:
25
John Gilbert, Croton Fire Department asked the Board to approve their
26
request to hold a fundraiser to support fellow member Mike Riecke who has
27
been diagnosed with phase three lung cancer.
28
Rick Craig, Lounsbury Road, Croton on Hudson, N.Y., advised that Lounsbury
29
Road water problems has a long and unfortunate history, we have
30
experienced years of rust in our water, in September 2024 he emailed the
31
Village Manager advising the Village that the problems were getting a lot
32
Village Board of Trustees
September 30, 2026
worse, fourteen months later we have been told that plans to the County have
1
finally happened, comments were received in July, a response went back to
2
the County on September 14th and we received a communication on the same
3
day from the Village that the Village is awaiting approval again from the
4
County. Mr. Craig gave an overview of what he and some of his neighbors
5
have been going through, we have been contacting the Village for years about
6
this problem, it has been extremely frustrating and unacceptable to have to
7
live with rust in our water.
8
Ed Reily, 110 Truesdale Drive, Croton on Hudson, thanked Trustee Nachtaler
9
for her efforts in getting the Metropolitan Transportation Authority to come to
10
the Waterfront Advisory Committee meeting to address questions regarding
11
their proposed signal system upgrade along the Metro-North Railroad Hudson
12
Line, they are proposing building nineteen structures along the Hudson River
13
and we should know where they are going and have a policy in place that
14
deals with the MTA. Mr. Reily stated that Ms. Nicholson is a wonderful person,
15
but is concerned because she has supported some of the liberal policies of
16
this administration and does not believe she is the right choice for the Village.
17
To hear the comments in their entirety you may click on the following:
18
https://play.champds.com/crotononhudsonny/event/1204 (00.17.05).
19
7. REPORT FROM THE VILLAGE MANAGER:
20
Village Manager Healy stated that it has been very upsetting to us as well that
21
some Lounsbury residents have been dealing with infrastructure problems for
22
so long, this was first brought to his attention back in 2024, he was not aware
23
that this was a problem in the past, but he immediately started looking into
24
this once he became aware of it. Village Manager Healy explained that plans
25
for relining water infrastructure takes a lot of time to be designed but once
26
we obtained a proposal from our design engineers, WSP, the Board approved
27
that proposal in February of 2025, unfortunately Westchester County
28
Department of Health is not very responsive and it took them seven months
29
for them to get back to us, once we received their comments, we made the
30
changes that they recommended and turned it around on September 14th
31
and he has been following up with WSP every week as to the status of that
32
approval. Village Manager Healy advised that we are also awaiting approval
33
so that we can declare this as an emergency to avoid the long process of
34
having to go out to bid, which will speed up the process. Village Manager
35
Healy emphasized that they have looked at ways to remedy this problem
36
Village Board of Trustees
September 30, 2026
temporarily but there were concerns that they might cause additional
1
problems. Village Manager Healy assured everyone that as soon as they get
2
approval from the Westchester County Department of Health, temporary lines
3
can be put in place which will immediately help to alleviate the problem until
4
the new pipes are put in place.
5
The Board asked that a full-court-press be made to the County and to also
6
look at ways to assist these homeowners who have continued to pay their
7
bills even under these terrible circumstances.
8
To hear the conversation in its entirety, you may click on the following link:
9
https://play.champds.com/crotononhudsonny/event/1204 (00.26.18)
10
Village Manager Healy’s report continued:
11
•
Received approval from the New York State Department of Transportation
12
for the flashing beacon on Maple Street; our DPW is set to install Monday
13
October 5th.
14
•
The Quaker Bridge project is on schedule to be completed next May; the
15
Village side of the coffer dam has been fully installed and load piled drilling
16
has begun while on the Town side of the coffer dam installation is expected
17
to be completed this week.
18
•
DPW has begun clearing the vacant lot at the bottom of Brook Street to
19
provide additional parking in the area, the goal is to clear some area during
20
the fall to provide additional off-street parking during the winter, in the
21
spring of 2027, DPW will return to pave and stripe the area, and a retaining
22
wall will also be installed at the back of the property.
23
•
New York State Department of Transportation has returned the
24
specifications and estimates for the Half Moon Bay Bridge with a few
25
additional comments; our structural engineering firm will review these
26
comments and provide a response to the New York State Department of
27
Transportation; we are still hoping to have the bid go out later this fall.
28
•
Phase two of the Engineering Department renovations should be finished
29
by next Monday; the final phase will involve demoing the existing
30
bathroom and then relocating it into the existing hallway.
31
Village Board of Trustees
September 30, 2026
•
Gouveia Park work has resumed now that the eagle season has officially
1
ended, DPW crews have been working on the lower parking lot near the
2
house and the new roadway that will exit onto Albany post Road.
3
•
The Engineering Department has received revised Building Permits for the
4
multi-family development at 1380 Albany Post Road; this project was
5
approved for a Special Permit by the Village Board in 2022 and the
6
Planning Board gave Site Plan approval to it later that year; Labella
7
Engineering will be reviewing the revised plans to ensure they are
8
responsive to the comments that were issued back in January 2025.
9
8. CONSENT AGENDA:
10
On Motion by Trustee Simon and seconded by Trustee Nachtaler the Board
11
approved the Consent Agenda. Motion was approved with a 5-0 Vote.
12
a. CORRESPONDENCE TO THE BOARD:
13
1. Memo from Village Manager Bryan Healy regarding fundraiser request
14
from Chemical Engine Company.
15
https://play.champds.com/ATT/crotononhudsonny/2026-
16
09/3c219d08325242fae4ba7993d5b283e81e132ece.jpg
17
2. Memo from Village Manager Bryan Healy regarding bench donations for
18
Black Rock Park & Dobbs Park.
19
https://play.champds.com/ATT/crotononhudsonny/2026-
20
09/3cee51d68b8b8abc2edc2213196bd1b6df30304a.pdf
21
3. Letter from Bob Anderson, Croton Lions Club President, requesting
22
permission to use South Riverside Avenue for the Lions Club annual
23
Christmas tree sale.
24
https://play.champds.com/ATT/crotononhudsonny/2026-
25
09/3cee51d68b8b8abc2edc2213196bd1b6df30304a.pdf
26
4. Letter of Resignation from former Village Trustee Nora Nicholson
27
effective September 18, 2026.
28
https://play.champds.com/ATT/crotononhudsonny/2026-
29
09/63b2d9b509104bfb8064a524cad22cf26420cb5e.pdf
30
Village Board of Trustees
September 30, 2026
5. Memo from Frank Balbi, Superintendent of Public Works, on the 2026
1
street resurfacing program.
2
https://play.champds.com/ATT/crotononhudsonny/2026-
3
09/ae0365c61cbf03dbe9589ea814f96bd0dc5ac225.pdf
4
b. RESOLUTIONS:
5
Resolution #228-2026
6
On motion of TRUSTEE SIMON, seconded by TRUSTEE NACHTALER, the following
7
resolution was adopted by the Board of Trustees of the Village of Croton-on-Hudson,
8
New York with a 4-0 vote.
9
NOW THEREFORE BE IT RESOLVED: that the Village Board of Trustees hereby
10
undertakes the following actions:
11
12
1. Approving the fundraising request from Chemical Engine Company for
13
October 16, 2026.
14
2. Accepting the donation in the amount of $711 from John Sasso to place a
15
bench at Black Rock Park.
16
3. Accepting the donation in the amount of $1,069.82 from Aurelia Semisa to
17
place a bench at Dobbs Park.
18
4. Approving the request from the Croton Lions Club to hold their annual
19
Christmas tree sale on South Riverside Avenue.
20
5. Filing for the record the letter of resignation from former Village Trustee
21
Nora Nicholson and the 2026 street resurfacing program memo from
22
Superintendent of Public Works Frank Balbi.
23
24
Resolution #229-2026
25
On motion of TRUSTEE SIMON, seconded by TRUSTEE NACHTALER, the following
26
resolution was adopted by the Board of Trustees of the Village of Croton-on-Hudson,
27
New York with a 4-0 vote.
28
WHEREAS, the State of New York Unified Court System is soliciting applications
29
from local governments under the Justice Court Assistance Program (JCAP) to assist
30
local Justice Courts with needed equipment, automation, furniture, supplies and
31
training; and
32
WHEREAS, the funding available under the JCAP would facilitate local efforts in
33
upgrading the security of the court clerk’s office,
34
Village Board of Trustees
September 30, 2026
NOW THEREFORE BE IT RESOLVED: that the Village Board of the Village of Croton-
1
on-Hudson authorizes the Croton-on-Hudson Village Court to apply for a JCAP grant
2
in the 2026-2027 grant cycle up to $30,000.
3
Resolution #230-2026
4
On motion of TRUSTEE SIMON, seconded by TRUSTEE NACHTALER, the following
5
resolution was adopted by the Board of Trustees of the Village of Croton-on-Hudson,
6
New York with a 4-0 vote.
7
WHEREAS, the Village Board of Trustees desires to update the language in the Village
8
Code regarding commercial and noncommercial signage, including their placement,
9
size, attachment, illumination, movement and material quality; and
10
WHEREAS, under the direction of the Village Board, the Village Manager has worked
11
with the Village Attorney and the Village Planner to develop language that conforms
12
to the latest guidance provided by the courts and the New York Conference of Mayors;
13
and
14
WHEREAS, Local Law Introductory No. 7 of 2026 has been drafted for such purposes;
15
and
16
WHEREAS, the Village has received comments back on the local law from the
17
Westchester County Planning Board, Village Planning Board and Waterfront Advisory
18
Committee; and
19
WHEREAS, the Village Board reviewed a revised draft law at a work session held on
20
September 9, 2026,
21
NOW THEREFORE BE IT RESOLVED: that the Village Board of Trustees hereby calls
22
for a Public Hearing on October 21, 2026, at 7:00 PM in the Georgianna Grant Meeting
23
Room of the Stanley H. Kellerhouse Municipal Building to consider Local Law
24
Introductory No. 7 of 2026 to amend Chapter 230, Zoning, of the Village Code to
25
update the language in the Village Code regarding commercial and noncommercial
26
signage.
27
Resolution #231-2026
28
On motion of TRUSTEE SIMON, seconded by TRUSTEE NACHTALER, the following
29
resolution was adopted by the Board of Trustees of the Village of Croton-on-Hudson,
30
New York with a 4-0 vote.
31
Village Board of Trustees
September 30, 2026
WHEREAS, the Village Board of Trustees desires to update the language in the Village
1
Code to provide clarification in the review of site development plans by the Planning
2
Board; and
3
WHEREAS, under the direction of the Village Board, the Village Manager has worked
4
with the Village Attorney and the Village Planner to develop language that would
5
provide the Planning Board with additional information as part of the application
6
process and allow them to request more information on certain aspects of a project
7
if deemed necessary during the review process; and
8
WHEREAS, Local Law Introductory No. 13 of 2026 has been drafted for such
9
purposes; and
10
WHEREAS, the Village has received comments back on the local law from the
11
Westchester County Planning Board, Village Planning Board and Waterfront Advisory
12
Committee,
13
NOW THEREFORE BE IT RESOLVED: that the Village Board of Trustees hereby calls
14
for a Public Hearing on October 21, 2026, at 7:00 PM in the Georgianna Grant Meeting
15
Room of the Stanley H. Kellerhouse Municipal Building to consider Local Law
16
Introductory No. 13 of 2026 to amend Chapter 230, Zoning, of the Village Code to
17
provide clarification in the review of site development plans by the Planning Board.
18
19
Resolution #232-2026
20
On motion of TRUSTEE SIMON, seconded by TRUSTEE NACHTALER, the following
21
resolution was adopted by the Board of Trustees of the Village of Croton-on-Hudson,
22
New York with a 4-0 vote.
23
WHEREAS, the Village Board of Trustees desires to provide clarification for land use
24
applications in connection with licensed adult use cannabis dispensaries; and
25
WHEREAS, under the direction of the Village Board, the Village Manager has worked
26
with the Village Attorney and the Village Planner to develop language that would
27
provide supplementary regulations for adult use cannabis dispensaries and codify
28
them as a special permit use in the Central Commercial (C-2) district, exclusive of
29
the gateway overlay districts, Light Industrial (LI) district, Riverside Commercial (C-
30
1R(A)) district, and the North End Gateway Overlay District; and
31
WHEREAS, Local Law Introductory No. 16 of 2026 has been drafted for such
32
purposes; and
33
Village Board of Trustees
September 30, 2026
WHEREAS, the Village has completed Part 1 of a Short Environmental Assessment
1
Form (EAF) and a Coastal Assessment Form (CAF),
2
NOW THEREFORE BE IT RESOLVED AS FOLLOWS:
3
1. The Village Board hereby determines that the Proposed Action is an Unlisted Action.
4
2. The Village Board hereby declares itself to be the Lead Agency for SEQRA purposes in
5
connection with the Proposed Action.
6
3. The Village Board hereby issues the EAF and CAF which it has before it in connection
7
with the Proposed Action.
8
4. The Village Board hereby refers the Draft Law, the EAF and the CAF to the Village
9
Planning Board for a recommendation back to the Village Board in accordance with
10
Village Law.
11
5. The Village Board hereby refers the Draft Law, the EAF and the CAF to the Village
12
Waterfront Advisory Committee for a recommendation back to the Village Board in
13
accordance with Village Law.
14
6. The Village Board hereby refers the Draft Law, the EAF and the CAF to the Westchester
15
County Planning Board for review in accordance with law.
16
7. The Village Board hereby directs Village staff to make any other circulations and
17
notifications regarding the Proposed Action as may be required by law.
18
19
Resolution #233-2026
20
On motion of TRUSTEE SIMON, seconded by TRUSTEE NACHTALER, the following
21
resolution was adopted by the Board of Trustees of the Village of Croton-on-Hudson,
22
New York with a 4-0 vote.
23
WHEREAS, the Village desires to contract with the National Purchasing Cooperative
24
to participate in cooperative purchasing for various items; and
25
WHEREAS, General Municipal Law § 103 allows for local governments to participate
26
in such cooperative purchasing; and
27
WHEREAS, there is no cost to the Village to enter into this agreement.
28
NOW THEREFORE BE IT RESOLVED: that the Village Board hereby authorizes the
29
Village Manager to execute the agreement with the National Purchasing Cooperative
30
to enter into their cooperative purchasing program.
31
Resolution #234-2026
32
On motion of TRUSTEE SIMON, seconded by TRUSTEE NACHTALER, the following
33
resolution was adopted by the Board of Trustees of the Village of Croton-on-Hudson,
34
New York with a 4-0 vote.
35
Village Board of Trustees
September 30, 2026
WHEREAS, during the 2026-2027 budget process, the discussion of allocating
1
additional funding for senior programs took place; and
2
WHEREAS, it was determined to place additional funding in the contingency line of
3
the budget to be available if needed; and
4
WHEREAS, Superintendent of Recreation Mark Duncan has requested $5,000 be
5
transferred into the Programs for the Aging account to allow for additional
6
programming,
7
NOW THEREFORE BE IT RESOLVED: that the Village Board hereby authorizes the
8
Village Treasurer to make the following budget transfer in the 2026-2027 General
9
Fund budget:
10
GENERAL EXPENSES
11
Increase
12
A7610.4000
Seniors – Contractual
$5,000
13
14
Decrease
15
A1990.4000
Contingency
$5,000
16
17
Resolution #235-2026
18
On motion of TRUSTEE SIMON, seconded by TRUSTEE NACHTALER, the following
19
resolution was adopted by the Board of Trustees of the Village of Croton-on-Hudson,
20
New York with a 4-0 vote.
21
WHEREAS, recent staff changes in the Recreation Department and Village Manager’s
22
office have resulted in the need to adjust various salaries lines,
23
NOW THEREFORE BE IT RESOLVED: that the Village Board hereby authorizes the
24
Village Treasurer to make the following budget transfer in the 2026-2027 General
25
Fund budget:
26
GENERAL EXPENSES
27
Increase
28
A1230.1000 Municipal Executive - Personnel
$17,000
29
A7610.1100
Seniors – Personnel (P/T)
$10,500
30
31
Decrease
32
A1990.4000 Contingency
$27,500
33
34
Resolution #236-2026
35
Village Board of Trustees
September 30, 2026
On motion of TRUSTEE SIMON, seconded by TRUSTEE NACHTALER the following
1
resolution was adopted by the Board of Trustees of the Village of Croton-on-Hudson,
2
New York with a 4-0 vote.
3
WHEREAS, the on-site audit has been completed for the 2025-2026 fiscal year; and
4
WHEREAS, during the course of the fiscal year, it was determined that the funding
5
allocated for the re-lining of the Lounsbury Road water main could be taken from the
6
fund balance in the Water Fund instead of incurring long-term debt; and
7
WHEREAS, the Village’s auditors have requested the Board affirm this decision
8
formally,
9
NOW THEREFORE BE IT RESOLVED: that the Village Board hereby authorizes the
10
Village Treasurer to make the following budget amendment in the 2025-2026 Water
11
Fund and Capital Fund budgets:
12
WATER EXPENSES
13
Increase
14
F9901.9030
Transfer to Capital Fund
$500,000
15
16
CAPITAL REVENUES
17
Increase
18
H1000.5032.13262
Transfer from Water Fund
$500,000
19
20
c. Approval of Minutes
21
Motion to approve the minutes of the Regular Meeting held on
22
September 2, 2026, was made by Trustee Simon. The motion was
23
seconded by Trustee Nachtaler and approved with a 4-0 vote.
24
d. Quarterly Reports
25
Clerk
26
https://play.champds.com/ATT/crotononhudsonny/2026-
27
09/7dc2363f9819a0193a5ae656836f3d6394b2e88e.pdf
28
29
DPW
30
https://play.champds.com/ATT/crotononhudsonny/2026-
31
09/5171e7e91599dc405e90c9f60043306cb915beec.pdf
32
33
Engineering
34
https://play.champds.com/ATT/crotononhudsonny/2026-
35
09/18ef6ef805e300a732192fd06ac63dbac1298537.pdf
36
Village Board of Trustees
September 30, 2026
1
Justice Court
2
https://play.champds.com/ATT/crotononhudsonny/2026-
3
09/e2db0fcfc33007cdaa3d91dfd72f69b57503bc87.pdf
4
5
Manager
6
https://play.champds.com/ATT/crotononhudsonny/2026-
7
09/7ebb0803bc8a614ad0fee52edab41eaebfff817f.pdf
8
9
Parking
10
https://play.champds.com/ATT/crotononhudsonny/2026-
11
09/e15f6d015e28fcafd32fa27d00da71aa2489a643.pdf
12
13
Police
14
https://play.champds.com/ATT/crotononhudsonny/2026-
15
09/730490c1f03d285027db5a5b03f19f971b3b5dae.pdf
16
17
Recreation
18
https://play.champds.com/ATT/crotononhudsonny/2026-
19
09/889a762de4a00ca9a34ee9616b784b34da8c5e48.pdf
20
21
Treasurer
22
https://play.champds.com/ATT/crotononhudsonny/2026-
23
09/938e65f28de2451cfc7ecb76daa6ba2d5edc2759.pdf
24
25
9. PROPOSED RESOLUTIONS:
26
Resolution #237-2026
27
On motion of TRUSTEE SIMON, seconded by TRUSTEE NACHTALER, the following
28
resolution was adopted by the Board of Trustees of the Village of Croton-on-Hudson,
29
New York with a 4-0 vote.
30
WHEREAS, the Village of Croton-on-Hudson (“Village”) transmitted formal
31
correspondence dated July 22, 2026, to the New York State Department of
32
Transportation (NYSDOT) conveying urgent public safety concerns regarding
33
hazardous trees and the degraded roadway conditions along State Route 129; and
34
WHEREAS, NYSDOT Regional Director Julianne Fuda, P.E., issued a written response
35
dated August 31, 2026, outlining routine maintenance protocols, inspections, and
36
tree removal procedures, but failing to commit to a definitive timetable; and
37
Village Board of Trustees
September 30, 2026
WHEREAS, the Board of Trustees finds the NYSDOT response dated August 31, 2026,
1
to be unsatisfactory in that it does not address the safety hazards threatening
2
motorists; and
3
WHEREAS, numerous dead, damaged, and unstable trees along the corridor pose a
4
direct and imminent danger to the public, particularly in the event of high winds and
5
extreme weather events; and
6
WHEREAS, the period of greatest danger is heightened while foliage remains on the
7
trees, as leaf canopies amplify wind resistance, increase branch failure rates, and
8
escalate the risk of catastrophic tree falls; and
9
WHEREAS, the pavement condition along Route 129 has severely deteriorated,
10
having been rated by NYSDOT in 2021 as being Fair/Poor, and has undergone five
11
additional years of continuous degradation without resurfacing; and
12
WHEREAS, NYSDOT staff have advised the Village that intermediate maintenance
13
measures (e.g., drag-boxing) are no longer viable or effective given the condition of
14
the road base,
15
NOW THEREFORE BE IT RESOLVED: that the Board of Trustees of the Village of
16
Croton-on-Hudson hereby calls upon the New York State Department of
17
Transportation to:
18
Undertake Immediate Tree Remediation: Direct emergency and specialized tree
19
crews to immediately inspect, trim, and remove all hazardous and compromised trees
20
along State Route 129 before seasonal severe weather conditions worsen; and
21
Prioritize Repaving: Program and expedite the complete repaving and structural
22
rehabilitation of State Route 129, allocating the required state capital funding without
23
further delay; and
24
BE IT FURTHER RESOLVED: that the Village Clerk is hereby directed to forward
25
certified copies of this resolution to Governor Kathy Hochul, NYSDOT Commissioner
26
Marie Therese Dominguez, NYSDOT Regional Director Julianne Fuda, P.E., and the
27
Village's state legislative representatives.
28
DISCUSSION:
29
Village Manager Healy stated that as of July five trees have come down, one actually
30
hitting a vehicle, we sent a letter urging the State to take action immediately before
31
something catastrophic happens, since he wrote the letter, two additional trees have
32
Village Board of Trustees
September 30, 2026
come down as well. Village Manager Healy advised that Assemblywoman Levenberg
1
is going to be advocating to the DOT for us.
2
Mayor Pugh stated that Route 129 is part of our Legislative Packet and there is some
3
cause for hope that next year there will be a new Capital Plan and that this can be
4
addressed in the future.
5
Resolution #238-2026
6
On motion of TRUSTEE SIMON, seconded by TRUSTEE NACHTALER, the following
7
resolution was adopted by the Board of Trustees of the Village of Croton-on-Hudson,
8
New York with a 4-0 vote.
9
WHEREAS, the Village of Croton-on-Hudson is authorized, pursuant to New York
10
Village Law § 1-102, to acquire real property by gift, grant, bequest or any other
11
lawful method; and
12
WHEREAS, the Town of Cortlandt desires to convey the parcel at 21 Cook Lane to the
13
Village of Croton-on-Hudson,
14
NOW THEREFORE BE IT RESOLVED: that the Village Board of Trustees do hereby
15
accept the parcel at 21 Cook Lane from the Town of Cortlandt, and
16
BE IT FURTHER RESOLVED: that the Village Manager is authorized to execute such
17
documents as may be necessary to give effect to this resolution.
18
Resolution #239-2026
19
On motion of TRUSTEE SIMON, seconded by TRUSTEE NACHTALER, the following
20
resolution was adopted by the Board of Trustees of the Village of Croton-on-Hudson,
21
New York with a 4-0 vote.
22
WHEREAS, the Village of Croton-on-Hudson (“the Village”) is acting as the municipal
23
sponsor for the Van Cortlandt Manor Entrance Project (P.I.N. 8760.11) to reconfigure
24
the entrance, enhance site safety, and improve visitor experience at the National
25
Historic Landmark; and
26
WHEREAS, the Village Board of Trustees awarded the contract for this work to Remus
27
Industries of Ossining, New York, on December 17, 2025; and
28
WHEREAS, a scope change during the course of the project has resulted in Change
29
Order 1 being submitted; and
30
Village Board of Trustees
September 30, 2026
WHEREAS, Historic Hudson Valley (HHV) has reviewed the proposed change order
1
and determined that the change in scope is necessary for the successful completion
2
of the project; and
3
WHEREAS, per the agreement executed by the Village and HHV, all costs for this
4
project that exceed the funding amount allocated by the New York State Department
5
of Transportation are the sole responsibility of HHV,
6
NOW THEREFORE BE IT RESOLVED: that the Village Board of Trustees hereby
7
authorizes the Village Manager to approve Change Order No. 1 in the total amount
8
of $73,491.84.
9
Resolution #240-2026
10
On motion of TRUSTEE SIMON, seconded by TRUSTEE SLIPPEN, the following
11
resolution was adopted by the Board of Trustees of the Village of Croton-on-Hudson,
12
New York with a 4-0 vote.
13
WHEREAS, the Village Board included funding for a police department staffing and
14
operational study in the 2026-2027 capital plan; and
15
WHEREAS, on May 28, 2026, the Village of Croton-on-Hudson issued a request for
16
proposals from qualified firms to undertake the study; and
17
WHEREAS, 10 responses were received by the deadline of June 25, 2026; and
18
WHEREAS, a working group consisting of Village Manager Bryan Healy, Village
19
Trustee Maria Slippen, Chief of Police John Nikitopoulos, Lieutenant Anthony
20
Tramaglini and Police Advisory Committee Chair Carolyn Whiting reviewed the
21
proposals and selected three finalists to interview; and
22
WHEREAS, following these interviews, it was determined to recommend moving
23
forward with 21st Century Policing Solutions (21CP) of Scottsdale, Arizona, at a cost
24
of $57,750,
25
NOW THEREFORE BE IT RESOLVED: that the Board of Trustees hereby authorizes the
26
Village Manager to accept the proposal from 21st Century Policing Solutions of
27
Scottsdale, Arizona, for a police department staffing and operational study in the
28
amount of $57,750.
29
DISCUSSION
30
Village Board of Trustees
September 30, 2026
Trustee Slippen stated that we talked about this during the Budget process and put
1
the money aside to do this project, it is aligned with other work we have done in
2
other departments very successfully, members of this committee did a tremendous
3
amount of study and research, and a lot of consideration was made in choosing this
4
firm.
5
Trustee Nachtaler stated that it is her understanding that this study does not include
6
evaluating efficiencies for consolidating Police.
7
Village Manager Healy stated that there is no scope in the proposal that involves
8
consolidation, this firm will be evaluating staffing, how resources are allocated, tour
9
scheduling and possibly looking at moving some responsibilities to non-uniform
10
personnel, as well as impacts of additional residents on our Police department.
11
Resolution #241-2026
12
On motion of TRUSTEE SIMON, seconded by TRUSTEE NACHTALER, the following
13
resolution was adopted by the Board of Trustees of the Village of Croton-on-Hudson,
14
New York with a 4-0 vote.
15
WHEREAS, the replacement of the HVAC system at the DPW Garage was included in
16
the 2026-2027 Capital Budget; and
17
WHEREAS, the level of technical specification needed for the development of the
18
design and bid documents require third-party assistance; and
19
WHEREAS, Nelson & Pope Engineering, Architecture and Land Surveying of Melville,
20
New York, has provided a proposal in the amount of $13,500 to develop the design
21
and bid documents and provide construction administration,
22
NOW THEREFORE BE IT RESOLVED: that the Village Manager is hereby authorized to
23
accept the proposal from Nelson & Pope Engineering, Architecture and Land
24
Surveying of Melville, New York, in the amount of $13,500.
25
Resolution #242-2026
26
On motion of TRUSTEE SIMON, seconded by TRUSTEE NACHTALER, the following
27
resolution was adopted by the Board of Trustees of the Village of Croton-on-Hudson,
28
New York with a 4-0 vote.
29
WHEREAS, the installation of a vehicle exhaust extraction system at the Harmon
30
Firehouse was included in the 2026-2027 Capital Budget; and
31
Village Board of Trustees
September 30, 2026
WHEREAS, the level of technical specification needed for the development of the
1
design and bid documents require third-party assistance; and
2
WHEREAS, Nelson & Pope Engineering, Architecture and Land Surveying of Melville,
3
New York, has provided a proposal in the amount of $14,500 to develop the design
4
and bid documents and provide construction administration,
5
NOW THEREFORE BE IT RESOLVED: that the Village Manager is hereby authorized to
6
accept the proposal from Nelson & Pope Engineering, Architecture and Land
7
Surveying of Melville, New York, in the amount of $14,500.
8
Resolution #243-2026
9
On motion of TRUSTEE SIMON, seconded by TRUSTEE NACHTALER, the following
10
resolution was adopted by the Board of Trustees of the Village of Croton-on-Hudson,
11
New York with a 4-0 vote.
12
WHEREAS, on May 14, 2025, the Village Board approved an agreement with Nelson
13
Pope and Voorhis (“NPV”) of Suffern, New York, to provide on-call grant and planning
14
services to the Village of Croton-on-Hudson; and
15
WHEREAS, the retaining of a planning consultant was one of the seven tasks
16
identified by the Engineering Department review plan undertaken by the Village; and
17
WHEREAS, on December 1, 2025, the Village Board approved a renewal agreement
18
with NPV for the current year; and
19
WHEREAS, based on the workload NPV has undertaken for the Village, it is
20
appropriate at this time to convert the on-call agreement to a retainer agreement;
21
and
22
WHEREAS, the terms of the retainer agreement will be $4,000 per month for up to
23
30 hours of work,
24
NOW THEREFORE BE IT RESOLVED: that the Village Board of Trustees hereby
25
authorizes the Village Manager to execute the agreement with Nelson Pope and
26
Voorhis of Suffern, New York, for 30 hours of planning and grant services at a cost
27
of $4,000 per month through December 31, 2026.
28
10.PUBLIC COMMENT - NON-AGENDA ITEMS:
29
John Sasso, Morningside Drive, Croton on Hudson, asked that citizen
30
participation be moved to the earlier part of the meeting, encouraged the
31
Village Board of Trustees
September 30, 2026
Board to address the dog park hours again, asked for a follow up to see if the
1
Village is actually saving money since we transferred our assessing function
2
to the Town, concerned that holding night court could cost more money, asked
3
why wasn’t the hiring of an Assistant Manager addressed during the Budget
4
process and believes there should more of a discussion of what she will be
5
doing.
6
Chester Edwards, 96 Hawley Avenue, Port Chester, NY, asked that the Board
7
consider adopting the New York State Real Property Tax Law 458-a(11) that
8
would authorize a full real property tax exemption for qualifying Veterans who
9
have been deemed by the U.S. Department of Veterans Affairs to be
10
permanently and totally disabled as a result of military service.
11
Ed Riely, 110 Truesdale Drives, stated that we have a health and population
12
crises in the United States, the number of children born in the United States
13
is at its lowest rate, and believes that there is a philosophy by some that
14
children are the enemies of the environment, talked about abortion drugs and
15
the boycott of CVS, concerned about flooding and policing with respect to the
16
new Hudson Valley Trailway which will be the new super highway along the
17
Hudson River, concerned about effects of solar panels on our environment,
18
and the effects of marijuana because it is now on track to become the number
19
one addiction in the United States and is concerned that the proposed
20
marijuana shop will be too close to a church and school.
21
Village Manager Healy advised that the tax exemption for qualifying
22
Veterans is scheduled for the next meeting.
23
Village Manager explained that the Assistant Village Manager position existed
24
in the past (2008 to 2015), and during this year’s budget discussions we
25
talked about adding back this position, and compared to what was in the
26
Budget, this will be approximately $16,000 more. Village Manager Healy
27
explained why Nora was being hired under the title Director of Operations,
28
most positions are Civil Service titles that are governed by Civil Service Rules
29
and Regulations, so when we appointed Nora to the title of Assistant Village
30
Manager, we assumed that since we had that title in 2008-2015, it would not
31
be an issue, but for some reason the County did not have this title for Croton
32
listed as an approved title, with that said, we are now obligated to create the
33
title and we will be holding a public hearing to put a local law on the books,
34
but in the interim, we have given Nora the title of Director of Operations,
35
which is a non-competitive title and is exempt from Civil Service
36
Village Board of Trustees
September 30, 2026
requirements. Village Manager Healy stated that he has quite a number of
1
things Nora will be working on when she starts on Friday and he has been
2
working on a list the entire summer of different projects and initiatives.
3
Village Manager Healy advised that we have not closed the door on the dog
4
park hours and we will be reviewing this in a work session, and we have not
5
received any complaints with respect to moving the assessing functions over
6
to the Town.
7
11.REPORTS:
8
Trustee Slippen stated that Bruce Odland, who passed away on September
9
17th will be remembered as an influential musician, composer and sound artist
10
who made his home in Croton, one of his final projects was a gift to Croton’s
11
Harmonic Landing, a sound installation at the south end of Croton Landing
12
(https://odland-auinger.com/harmonic-landing/), we will celebrate Bruce and
13
his work with a ribbon cutting at Croton Landing in early November. Trustee
14
Slippen stated that she would like to see an assessment of how properties
15
may have been impacted by moving Assessing to the Town of Cortlandt,
16
emphasized that she would like to continue the discussion regarding the dog
17
park hours, the Croton Free Library will kick off their fundraising campaign
18
with a 24-Hour Relay Readathon, Tristan Szeto, a Life Scout in Troop 28, is
19
completing her Eagle Scout Service Project by working with the Jane E. Lytle
20
Memorial Croton Arboretum to improve the way visitors navigate and learn
21
about this beautiful local community resource, excited that a new art studio
22
will be opening up soon in the Upper Village, the Conservation Advisory
23
Council hosted a forum on gas-powered leaf blowers on September 15th, there
24
had been discussion about having a medical professional to speak to the
25
health effects of leaf blowers and asked that this element be added to the
26
conversation, the last time the Recreation Advisory Committee met they
27
reviewed some of the plans for the Gouveia Park and she looks forward to
28
discussing this at an upcoming work session, she would also like to see some
29
type of play space incorporated at Gouveia, the Police Advisory Committee is
30
finishing up their work on their annual survey, this year there is going to be
31
a lot of questions regarding cameras and we look forward to everyone’s
32
feedback.
33
Trustee Slippen stated that she enthusiastically welcomes Nora as the new
34
Assistant Village Manager, she knows the Village well and cares deeply about
35
the Village and will bring a real dedication to the Manager's Office, the
36
Village Board of Trustees
September 30, 2026
Manager’s office has been understaffed for a while, and she is looking forward
1
to working with her, but wants to take a minute to talk about trust, the
2
residents count on this Board to handle details together in open, which she
3
believes is part of the deal as an elected Trustee, some concerns were raised
4
this past week that this was “an after the fact argument” and she would agree
5
with that because “after the fact” is when some of us found out a lot of the
6
details, while she agrees that the Manager makes this appointment and that
7
personnel matters are confidential, and she is not asking for that to change,
8
but confidentiality that applies to some Trustees and not to others is not
9
confidentiality, it is rather a guest list, and she is proposing a simple written
10
rule that every Trustee and our attorney get the information at the same time
11
not because we distrust each other but so residents never have a reason to
12
distrust us, we will welcome a new Board member very soon and I want that
13
person to join the Board as a body that works as one, shares information
14
openly and puts every member on equal footing, how this Board shares
15
information is a question residents deserve to hear from us in public and she
16
is asking the Board to put on a work agenda a draft policy from our attorney
17
and then see it through as a written policy that we adopt, regardless of what
18
happens to her in November, she would like this policy in place, this is about
19
how this board serves the Village and we have big decisions ahead and would
20
like to make them together.
21
Trustee Nachtaler advised that the Advisory Board on the Visual Environment
22
met, they had a very lengthy meeting regarding signage for the cannabis
23
shop, and they have forwarded their recommendations to the Planning Board,
24
on September 18th she and Trustee Slippen met with the wife of an ICE victim,
25
she learned a lot during that meeting of ways we can support her and the
26
community, it is upsetting to hear about the racism some have experienced
27
in the Hispanic community and she has forwarded some of the feedback that
28
we learned as we think about Hispanic Heritage Month, on September 19th
29
she attended the grand opening and ribbon cutting of the Croton Running
30
Company, on September 19th she attended the annual Croton Fire
31
Department Inspection, on September 22nd the Planning Board welcomed
32
alternate member Gabriella Mirabelli who stepped in for her first time,
33
attended the opening of the Blaze on September 21st , on September 21th
34
the John Patterson Historical Road Sign honoring John Patterson AKA John
35
rifle Jack Peterson a Revolutionary War hero was dedicated and thanked
36
everyone involved in making this happen, advised that the “60 plus
37
registration form” is out for fall 2026 and there are a lot of fantastic programs,
38
Village Board of Trustees
September 30, 2026
there will also be a session Demystifying Medicare on Sun, Nov 1st from
1
1:15PM - 4:30pm to address some of the changes to Medicare, on September
2
27th, as part of the IDEA Committee Coalition, she attended the Lorraine
3
Hansberry celebration co-naming a street in Lorraine Hansberry's honor as
4
well as an exhibit at the Croton Library, she has also been working with Mayor
5
Pugh interviewing Trustee candidates and thanked everyone who has applied
6
for that position. Trustee Nachtaler welcomed Nora to her new position.
7
Trustee Simon advised that the Croton Council of the Arts’ annual fair was
8
terrific and was pleased to hear from Jim Christensen how effective the use
9
of our Village shuttle was this year, on September 3rd we held our New York
10
Forward Town Hall meeting, and thanked Mayor Marjorie Hsu from Sleepy
11
Hollow who lead us through the ins and outs of the New York Forward process,
12
we will have more to report fairly soon, on October 4th from 11:00 to 3:00
13
the Fire Fair will be held, this year’s theme is going to be “charge into fire
14
safety-safe charging is a superpower”, sadly the Rotary car show was
15
cancelled due to weather, but they will be back next year, on September 9th
16
we held a ribbon cutting for the train station solar array and thanked Lindsay
17
Audin who had such a great role in making this possible, we took more than
18
fifty of our Croton seniors to the Franklin Roosevelt Presidential Library, and
19
thanked Joanna Straub for her terrific work in putting that whole event
20
together, we held our joint 9-11 ceremony to honor our first responders, and
21
thanked Buchanan for taking the lead this year, on September 17th the
22
Manager and I bagged groceries at ShopRite, on September 19th we had a
23
ribbon cutting for the Croton Running Company, attended the Fire Association
24
of the State of New York press conference in Ossining, and is very pleased
25
that the Governor may signed legislation to expand the property tax
26
exemptions for firefighters and EMS, the Sustainability Committee met on
27
September 20th where they went over lots of different projects, on September
28
22nd Assemblywoman Dana Levenberg and Assemblyman Chris Burdick held
29
a round table for municipalities on housing question, they were interested in
30
knowing what works, what isn't working with respect to the Governor's
31
policies, on October 3rd a ribbon cutting will be held at 11:00am for Brooklyn
32
Embodied Pilates, following that Oktoberfest will begin at noon, best wishes
33
to Nora Nicholson as she gets ready for her new assignment, we are very
34
lucky that Nora is willing to invest the next segment of her life and career in
35
continuing to work for the Village.
36
Village Board of Trustees
September 30, 2026
Mayor Pugh extended his sincere thanks to the Croton Yacht Club ,especially
1
to Dennis Kooney, our Summerfest Grand Marshal, for his excellent work in
2
organizing River Day.
3
There being no further business to come before the Board, a motion to close the
4
meeting was made by Trustee Simon. Motion was seconded by Trustee Slippen and
5
approved with a 4-0. Meeting adjourned at 9:40pm.
6
Respectively submitted,
7
Judy Weintraub, Board Secretary
8
__________________________
9
Paula DiSanto, Village Clerk
10
Machine-extracted for search and reference — the original file is the authoritative version.