Agenda item: Proposed Resolutions — Consider authorizing the Village Manager to accept the proposal from Tectonic Engineering for additional scope of work related to the Half Moon Bay Bridge Rehabilitation Project in the amount of $41,540.
Resolution, 3 pages. Attached to agenda item: “Proposed Resolutions — Consider authorizing the Village Manager to accept the proposal from Tectonic Engineering for additional scope of work related to the Half Moon Bay Bridge Rehabilitation Project in the amount of $4”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Consultant Agreement - Tectonic
Resolution 2-2026 HMB Bridge Additional Work Proposal
Resolution 29-2024 Half Moon Bay Bridge Consulting Services
Resolution 295-2025 HMB Bridge Consultant Agreement
Scope of Services - Halfmoon Bridge Tectonic R1
Extracted text
1 Van Wyck Street,
Croton-on-Hudson, N.Y. 10520
ATTN: Bryan T. Healy, Village Manager
December 18, 2025
VIA EMAIL (bhealy@crotononhudson
-ny.gov)
RE:
Half Moon Bay Bridge (BIN 2270050)
Rehabilitation
Village of Croton-on-Hudson, Westchester County, NY
Proposal for Professional Services - Additional Scope 2
Dear Mr. Healy:
In accordance with our recent coordination, Tectonic Engineering Consultants, Geologists & Land
Surveyors, D.P.C. is pleased to submit our
proposal to provide
professional services for
the additional scope
of the Half Moon Bay Bridge (BIN 2270050) Rehabilitation
project, Village of Croton-on-Hudson, NY.
These services shall be performed for the
Village of Croton-on-Hudson, herein referred to as Client.
1.0
SCOPE OF SERVICES
In accordance with the recent coordination with
NYSDOT and MNR regarding the pier cap beam
repair and the recent direction from NYSDOT regarding the coastal assessment
, additional scope
will be needed.
Pier Cap Beam Repair
Design the structural repair for the existing pier cap beams at both piers. Per the last inspection,
section losses due to corrosion are noted at the pier cap beams.
Per the recent coordination with
Metro North Railroad, c
omplete replacement of the cap beams is not feasible due to close proximity
to the railroad tracks. In the current design concept, the cap beams will be repaired by adding
reinforced concrete inside the
opening of the existing cap beams. This task consist
s of preparation
of the structural repair design, drafting repair details
, modification of the contract drawing
s, and
coordination with NYSDOT and MNRR. It will require additional efforts under section 3 preliminary
design stage and section 6 detailed design stage.
Coastal Assessment
The proposed project is located in the NYS Coastal Zone and Local Waterfront Revitalization
Program (LWRP) area. In accordance with NYSDOT environmental review procedures, a Federal
Aid Notification package will need to be submitted to the NYS Department o
f State and a Coastal
Assessment Form will need to be completed. The project will be reviewed in accordance with NY
State Costal Policies and documentation of the project’s consistency with State Coastal Policies
will be provided. Since the project is loca
ted in a LWRP, notifications will be prepared for submittal
to the municipality (Village of Croton
-on-Hudson) including a discussion of the project’s consistency
with all applicable policies of the LWRP. No federal permits are anticipated to be required for the
project; therefore pre
paration of a Federal Coastal Assessment Form would not be required and is
not included as part of this scope
.
2.0
FEES AND PAYMENTS
Tectonic will perform the scope and quantity of work outlined in Section 1.0 above, based on the
following fees.
Task Description
Estimated
Additional Fee
Section 3 Prelim Design
$19,360.00
Section 4 Environmental
$2,900.00
Section 6 Detailed Design
$19,280.00
Estimated Total
$41,540.00
Please have an authorized representative complete and sign the attached Authorization Form to
indicate acceptance of this agreement. Please return to Tectonic one signed copy of the completed
Authorization Form.
If you have any questions or comment relative to this proposal, please do not hesitate to contact
the undersigned directly at (860
) 563.2341.
TECTONIC ENGINEERING CONSULTANTS, GEOLOGISTS & LAND SURVEYORS, D.P.C.
____ Man Hou Sit____
Man Hou (Albert) Sit
Project Manager
Tectonic Engineering
CC:
Frank Balbi, P.E., Superintendent of Public Works
, Village of Croton-on-Hudson
Jeff Scala, P.E., Senior Vice President, Tectonic Engineering
G:\Rocky Hill\Marketing\Proposals - Outstanding\23\PN23-1226 LDSA-Croton on Hudson Bridge Repl RFQ for Preliminary Design
- PIN
8763.05\Scope & Cost proposal_addl scope 2025 04\Half Moon Bay Bridge Additional Scope.docx
WORK AUTHORIZATION AND PROPOSAL ACCEPTANCE FORM
Proposal No: 23-1226
Date: 12/18/2025
Retainer Amount Required: $0.00
Project Name & Location:
Half Moon Bay Bridge (BIN 2270050) Rehabilitation
, Village of Croton-on-Hudson,
Westchester County, NY
Proposed Services: Bridge Design – Additional Scope
Proposal Acceptance
Acceptance (Signature):
Date:
Printed Name:
Title:
Company or Organization Name:
Client Contact Information (All of the following information about the person responsible for the identifie
tasks must be provided prior to starting work)
Scheduling Work and
Receipt of
Deliverables
Name:
Phone:
Email:
Receipt of Invoices
(Original)
Name:
Phone:
Email:
Receipt of Invoices
(Copies)
Name:
Phone:
Email:
Issuing Payments of
Invoices
Name:
Phone:
Email: