croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Monday, August 17, 2026· Aug 17, 2026
Source-linkedCorrections welcomed
DocumentsBoard Of Trustees, 2026-01-07

Resolution 2-2026 HMB Bridge Additional Work Proposal

resolution 1 page
From the meeting: Board Of Trustees — 2026-01-07 · our coverage →
Agenda item: Proposed Resolutions — Consider authorizing the Village Manager to accept the proposal from Tectonic Engineering for additional scope of work related to the Half Moon Bay Bridge Rehabilitation Project in the amount of $41,540.
Resolution, 1 page. Attached to agenda item: “Proposed Resolutions — Consider authorizing the Village Manager to accept the proposal from Tectonic Engineering for additional scope of work related to the Half Moon Bay Bridge Rehabilitation Project in the amount of $4”
Retrieved 2026-04-15 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: Consultant Agreement - Tectonic Half Moon Bay Bridge Additional Scope2 Resolution 29-2024 Half Moon Bay Bridge Consulting Services Resolution 295-2025 HMB Bridge Consultant Agreement Scope of Services - Halfmoon Bridge Tectonic R1
On motion of TRUSTEE -, seconded by TRUSTEE -, the following resolution was adopted by the Board of Trustees of the Village of Croton-on-Hudson, New York with the following vote: Resolution #2-2026 WHEREAS, the Village of Croton-on-Hudson assumed the ownership of and maintenance requirements for the Half Moon Bay Bridge over the Metro-North Railroad tracks in 1996; and WHEREAS, in order to address past safety issues and the proper maintenance of the bridge, the Village is moving ahead with the rehabilitation and reconstruction of the Half Moon Bay Bridge; and WHEREAS, on February 7, 2024, the Village Board of Trustees adopted Resolution 29-2024 to accept the proposal from Tectonic Engineering of Rocky Hill, Connecticut, to provide consulting and engineering design services for the project; and WHEREAS, Tectonic has provided a proposal to cover an additional scope of work related to the pier cam beam repair needed for the bridge and the completion of state requirements for coastal assessment in the amount of $41,540, NOW THEREFORE BE IT RESOLVED: that the Village Board hereby authorizes the Village Manager to accept the proposal from Tectonic Engineering for the above scope of work; and BE IT FURTHER RESOLVED: that funding for such work is available in account H5110.2106.15287. Dated: January 7, 2026

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.