Agenda item: Change Order EC-1 ER Electric Corp. (Tennis Court Project #003-036)
CHUFSD agenda source 2026-11-05, item DZ4RA96D0459; proposed business, not proof of adoption. Original SHA256 4368aacf2a04594af7961a7f671ab786e0914d752c36e2daa034dbab0e40e6af
Retrieved 2026-11-03 from the original source.
View the original file ↗
Also attached to this agenda item:
Change Order EC-1 ER Electric Corp. (Tennis Court...
Extracted text
Ernesto Graziano
Ernesto Graziano President
Docusign Envelope ID: 64DA46EC-DF5F-88F4-8129-BF45A7674F82
Docusign Envelope ID: 83858CCB-D4C6-8093-81FB-7A144B9EB5E1
10/22/2026
FROM:
DATE:
OWNER:
CM:
ATTN:
EMAIL:
# HOURS
PER
WAGE RATE
EXTENSION
7
EA
$157.15
$1,100.05
17.5
EA
$154.17
$2,697.98
EA
$0.00
$0.00
TOTAL LABOR:
$3,798.03
QTY
UNIT COST
PER
EXTENSION
1425.00
$0.39
LF
$558.60
1.00
$18.56
EA
$18.56
1.00
$41.36
EA
$41.36
1.00
$34.57
EA
$34.57
$0.00
EA
$0.00
$0.00
EA
$0.00
EA
$0.00
$653.09
QTY
UNIT COST
PER
EXTENSION
$0.00
EA
$0.00
$0.00
EA
$0.00
$0.00
EA
$0.00
$0.00
$4,451.12
$0.00
$4,451.12
NAME:
$689.92
TITLE:
$5,141.04
DATE:
$154.23
SIGNATURE:
$5,295.27
MATERIALS
#10 THHN CU Wire (3 x 475')
SUB-TOTAL:
OH&P:
SALES TAX:
RIGGING
EQUIPMENT RENTALS
TOTAL MISCELLANEOUS:
sdavis@kgdarchitects.com
8 Gerstein Street
Croton-On-Hudson, New York 10520
PHASE 2 - CARRIE E. TOMPKINS ELEMENTARY SCHOOL
CROTON-HARMON UFSD
KG&D Architects, PC
Sarah Davis
Ernesto Graziano
10/1/2026
ER Electric Corp
2005 Palmer Ave, Suite 150
Larchmont, NY 10538
P: (914) 469-0018
ernesto@erelectriccorp.com
CHANGE ORDER REQUEST #R1
Furnish and Install (3) #10 THHN CU wires in exisitng Underground Conduit from the Musco
Control Panel to the Pole T1 and install the Musco Push Button Switch and Strobe Light at the
existing Gate
SCOPE OF WORK
FOREMAN
JOURNEYMAN
LABOR
3/4" RGS 36"L Nipple
MISCELLANEOUS
MOBILIZATION & DEMOBILIZATION
FS Box with (2) 3/4" Hubs
FS Box with (1) 3/4" Hubs
TOTAL MATERIAL:
ER ELECTRIC CORP. RESERVES THE RIGHT TO MAKE CHANGES TO PRICE, MATERIAL, LABOR, ETC. AT AT ANY TIME TO THIS CHANGE. SIGNING THIS DOCUMENT IS AN AGREEMENT TO TERMS AND CONDITIONS OF ER ELECTRIC CORP. AND AN AGREEMENT TO PAY THE FOR THE
SCOPE OF WORK, EVEN IN THE EVENT OF A CHANGE TO AS PREVIOUSLY MENTIONED LABOR, MATERIAL, ETC.
P&P BOND:
SUB-TOTAL:
CHANGE ORDER ACCEPTED
SIGNATURE REQUIRED
SUB-TOTAL:
TOTAL AMOUNT DUE:
SRD
Docusign Envelope ID: 64DA46EC-DF5F-88F4-8129-BF45A7674F82
Docusign Envelope ID: 83858CCB-D4C6-8093-81FB-7A144B9EB5E1
10/22/2026
Page One
THE STATE EDUCATION DEPARTMENT / THE UNIVERSITY OF THE STATE OF NEW YORK / Albany, NY 12234
Office of Facilities Planning, Room 1060 Education Building Annex
Tel. (518) 474-3906 Fax (518) 486-5918
www.emsc.nysed.gov/facplan/
Instructions:
Part One - General Information
SED Project Number
6
6
0
2
0
2
0
3
0
0
0
3
0
3
6
District BEDS Code
Building Identification Number
Project number
District & Building Name
Type of Project
Project Description
Architect / Engineer firm
name
address
Contact Person
name & title
phone number & e-mail
Construction Manager firm
name
address
Contact Person
name & title
phone number & e-mail
District Contact Person
name & title
phone number & e-mail
Part Two
Provide the following information for each individual item in the change order:
(Number each item if there is more than one and provide additional sheets as necessary.)
A.
Requested By (Who initiated the change request)
B.
Relationship to Project Scope (How is this change related to the original project scope)
C.
Basis of Need (Describe why the change is needed)
D.
FP-COC 09/02, rev 08/06,
rev. 04/10
N/A
CHANGE ORDER CERTIFICATION
This CERTIFICATION is required for all change orders submitted to SED
Change Order Number:
Sarah R. Davis, AIA 914.666.5900 sdavis@kgdarchitects.com
KG+D Architects, PC, 285 Main St, Mount Kisco, NY 10549
Fill out all three parts completely.
EC-1
Provide separate Change Orders for each Project Number
Croton-Harmon UFSD - Carrie E. Tompkins Elementary School
N/A
Sport Lighting for the existing tennis courts & addition of a playground
Must be attached to back of Change Order
Brad Kennedy, Director of Facilities, 914.271.4713, brad.kennedy@chufsd.org
Description of Work (Provide a detailed description of the work or services provided in the change order. Provide text, a
drawing or both as necessary to demonstrate code compliance and the individual cost of each item.)
A. Owner.
B. Within the area of original project scope.
C. Work required to reconcile electrical drawings and supplier information
D. Wiring required for connection of lighting control button at tennis court gate.
Ta
Reconstruction /Alteration
Addition & Alteration
New Building
Other
Docusign Envelope ID: 64DA46EC-DF5F-88F4-8129-BF45A7674F82
Docusign Envelope ID: 83858CCB-D4C6-8093-81FB-7A144B9EB5E1
FP-COC 04/10
Page Two
Part Three
1
a
a
a
a
2
The following statements are true and correct to the best of my knowledge and belief:
3
Change order requirements:
CHANGE ORDER CERTIFICATION
= The revised total cost is within the authorized appropriation for this project.
If the cost of this change order is not within the approved amount as currently established on the
SA-4, please provide a Form FP-FI, Request for Revision of Financial Information, with
documentation showing the additional authorization of funds.
Each change order shall be signed by the president of the board of education, the
architect/engineer, and the contractor.
= Work required by this change order that involves asbestos-containing building material (ACBM) was
designed by an architect or engineer who is currently licensed by the State of New York and who is appropriately
certified as an asbestos designer by the NYS Department of Labor at the time he/she designed the asbestos-
related project.
Certification of the Superintendent of Schools (District Superintendent if a BOCES project)
Certification of the Architect or Engineer
Signature and printed name of the School Superintendent or District Superintendent if a BOCES project
= Any plan, sketch, or attachment referenced In this change order is included herein.
= Work required by this change order is in accordance with applicable provisions of the NYS Uniform Fire
Prevention and Building Code, State Education Department's building standards, and NYS Department of
Labor's Code Rule 56.
Dollar amounts applied from allowances toward costs associated with the changes must be
provided.
The scope of the change order must relate to the project scope previously approved.
= Work required by this change order was designed by an architect or engineer who is currently licensed by
the State of New York.
= Work required by this change order is in accordance with applicable sections of the approved contract
documents.
The following statements are true and correct to the best of my knowledge and belief:
Date
= Where any work of this change order requires a type or kind of work that is not included in the original
contract documents, the school district's attorney has been contacted to assure conformance with the Opinion of
the State Comptroller No. 60-505.
Date
Signature and printed name of the Architect or Engineer
KG+D Architects, PC
Architectural / Engineering Firm Name
EC-1
Sarah R. Davis, AIA
Docusign Envelope ID: 64DA46EC-DF5F-88F4-8129-BF45A7674F82
10/19/2026
Docusign Envelope ID: 83858CCB-D4C6-8093-81FB-7A144B9EB5E1
10/22/2026