Resolution 54-2026 LWRP Consistency HMB Bridge
resolution
4 pages
From the meeting:
Board Of Trustees — 2026-03-11
· our coverage →
Agenda item: Proposed Resolutions — Consider adopting a statement of consistency with the Village's Local Waterfront Revitalization Program for the Half Moon Bay Bridge Reconstruction Project.
Resolution, 4 pages. Attached to agenda item: “Proposed Resolutions — Consider adopting a statement of consistency with the Village's Local Waterfront Revitalization Program for the Half Moon Bay Bridge Reconstruction Project.”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
F-2026-0105 FA assign to Armando Half Moon Bay...
F-2026-0105 LWRP Memo FA
LWRP Rehabilitation of HMB Bridge
Memo to VB re Half Moon Bay Bridge
Extracted text
On motion of TRUSTEE -, seconded by TRUSTEE -, the following resolution was
adopted by the Board of Trustees of the Village of Croton-on-Hudson, New York
with the following vote:
Resolution #54-2026
WHEREAS, the Village of Croton-on-Hudson has adopted a Local Waterfront
Revitalization Program (LWRP) to guide the use of its waterfront and adjacent areas
in a manner consistent with sound waterfront planning and environmental protection
principles; and
WHEREAS, the Village of Croton-on-Hudson has received a referral for review of
the reconstruction of the Half Moon Bay Bridge; and
WHEREAS, on February 25, 2026, the Village’s Waterfront Advisory Committee
(WAC) reviewed the proposed project for consistency with the policies of the LWRP;
and
WHEREAS, the WAC has evaluated the Coastal Assessment Form and the policies of
the LWRP and determined that the following policies are relevant to the proposed
project:
POLICY 1: Restore, revitalize, and redevelop deteriorated and underutilized
waterfront areas for commercial, industrial, cultural, recreational and other
compatible uses.
POLICY 1A: Encourage integrated development of Village property to
assure fulfillment of requirements relating to parking and accessory uses of
Metro-North train station, while facilitating public access to the bay area and
recreational use.
POLICY 1B: Encourage restoration of deteriorating structures related to
railroad use and assure appropriate maintenance and screening to reduce
visual impact.
POLICY 2: Facilitate the siting of water dependent uses and facilities on or
adjacent to coastal waters.
POLICY 2A: Encourage water-enhanced commercial uses where such uses
complement water dependent uses and do not result in displacement of such
uses.
POLICY 4: Strengthen the economic base of smaller harbor areas by
encouraging the development and enhancement of those traditional uses and
activities which have provided such areas with their unique maritime identity.
POLICY 5: Encourage the location of development in areas where public
services and facilities essential to such development are adequate.
POLICY 7E: Runoff from public and private parking lots and from storm
sewer overflows shall be effectively managed so as to prevent oil, grease, and
other contaminants from polluting surface and ground water and impact to the
significant fish and wildlife habitats.
POLICY 7F: Construction activity of any kind must not cause a measurable
increase in erosion or flooding at the site of such activity, or impact other
locations. Construction activity in the Croton River and Hudson River
spawning areas shall be timed so that spawning of anadromous fish species
and shellfish will not be adversely affected.
POLICY 7G: Construction activity of any kind must not cause significant
degradation of water quality or impact identified significant fish and wildlife
habitats.
POLICY 18: To safeguard the vital economic, social, and environmental
interests of the State and of its citizens, proposed major actions in the coastal
area must give full consideration to those interests, and to the safeguards
which the State has established to protect.
POLICY 19: Encourage the linkage of open space from upland areas to and
along the Hudson and Croton Rivers in the form of a trail or walkway system.
POLICY 19A: Encourage the linkage of open space from upland areas to and
along the Hudson and Croton Rivers in the form of a trail or walkway system.
POLICY 19B: Increase public access to areas that offer physical and visual
connection to the Hudson River or Croton River and Bay.
POLICY 19C: Encourage the improvement of public transportation, when
feasible, where water dependent and water-enhanced recreation activities are
located.
POLICY 20: Access to the publicly owned foreshore and to lands
immediately adjacent to the foreshore or the water’s edge that are publicly-
owned shall be provided and it should be provided in a manner compatible
with adjoining uses.
POLICY 21: Water dependent and water enhanced recreation will be
encouraged and facilitated, and will be given priority over non-water related
uses along the coast.
POLICY 21A: Boating and fishing activities should be encouraged provided
that they do not restrict other water-related recreational opportunities and are
undertaken in a manner compatible with existing water-dependent uses.
POLICY 22: Development when located adjacent to the shore will provide
for water-related recreation whenever such use is compatible with reasonably
anticipated demand for such activities and is compatible with the primary
purpose of the development.
POLICY 25: Protect, restore, or enhance natural and man-made resources
which are not identified as being of statewide significance, but which
contribute to the overall scenic quality of the coastal area. (The following
scenic areas were noted in the LWRP as having local and regional
significance: (1) Distinctive and scenic views of Croton point, (2) Views of
the Hudson River from South Riverside Avenue and Route 9 corridor, and (3)
Vegetated slopes and undisturbed ridgelines particularly those in the
viewsheds in the Croton Gorge, River, and Bay areas.)
POLICY 25A: Establish and protect identified public viewsheds of the
Hudson River, including but not limited to the public views of the Hudson
River from the western shoreline of the Village, and of the Croton River and
Gorge. (The following scenic areas were noted in the LWRP as having local
and regional significance: (1) Distinctive and scenic views of Croton point, (2)
Views of the Hudson River from South Riverside Avenue and Route 9
corridor, and (3) Vegetated slopes and undisturbed ridgelines particularly
those in the viewsheds in the Croton Gorge, River, and Bay areas.)
Under LWRP Section IV, Proposed Land Uses and Projects, the following
policies are relevant:
POLICY 7: Facilitate Access to the Hudson River Waterfront
A recurring comment from public input during this LWRP process and prior
plans was the need to improve access to the Hudson River waterfront for
vehicles, pedestrians, and bicyclists. Although there have been some
improvements such as the Brook Street pedestrian bridge, in general, access to
the waterfront is limited, and difficult in some locations.
POLICY 8: Facilitate Croton Yacht Club/Croton Landing Improvements
The concept of a waterfront restaurant, or another use at the southern end of
Croton Landing Park, adjacent to the Croton Yacht Club, has been discussed
by the Village for years. Parking is also an issue as there is already
insufficient on-site parking at Croton Landing Park to satisfy demand during
busy hours.
POLICY 9: Implement Segment of Riverwalk Trail from Croton Landing
Park to Oscawana County Park
According to the Hudson River Trailway Plan (2003), Westchester County has
proposed a 1-mile trail along the Hudson River that would connect Croton
Landing Park with Oscawana County Park in Cortlandt. This trail would fill a
gap between the River Walk trails at these two parks; and
WHEREAS, the WAC has found that the specifications for the proposed work are
protective of the environment and that the project will extend the life of the
infrastructure in a manner consistent with the LWRP; and
WHEREAS, the WAC has issued its recommendation of consistency with the LWRP,
NOW THEREFORE BE IT RESOLVED: that the Village Board of Trustees hereby
declares the proposed rehabilitation of the Half Moon Bay Bridge to be consistent with
the Village’s Local Waterfront Revitalization Program.
Dated: March 11, 2026
Machine-extracted for search and reference — the original PDF is the authoritative version.