October 30th Resolution 219-2023 VZW 1 Van Wyck Special Permit Renewal
resolution
2 pages
Meeting: portal event 900 (no meeting page on file)
Agenda item: Public Hearing — Public Hearing to consider the special permit renewal application from Verizon Wireless to collocate a personal wireless facility at 1 Van Wyck Street.
Resolution, 2 pages. Attached to agenda item: “Public Hearing — Public Hearing to consider the special permit renewal application from Verizon Wireless to collocate a personal wireless facility at 1 Van Wyck Street.”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Exibit A Verizon Wireless
Exibit B Verizon Wireless
Exibit C Verizon Wireless
October 16th Resolution 215-2023 VZW Tower Scheduling...
Verizon Wireless Cover Letter
Extracted text
On motion of TRUSTEE ___, seconded by TRUSTEE ____, the following resolution
was adopted by the Board of Trustees of the Village of Croton- on-Hudson, New York,
with a - vote.
Resolution #219-2023
WHEREAS, on December 3, 2018, the Board of Trustees unanimously adopted a
resolution to issue a special permit to New York SMA Limited Partnership d/b/a
Verizon Wireless for the collocation of a personal wireless facility at 1 Van Wyck
Street; and
WHEREAS, the special permit was issued with a number of conditions as
recommended by the Village Engineer and Planning Board; and
WHEREAS, the permit expires on December 3, 2023 and must be renewed in
accordance with the Telecommunications Chapter of the Village Code; and
WHEREAS, the Village has received a request for renewal from Verizon Wireless
and the associated special permit application fee,
WHEREAS, a Public Hearing on the special permit application was opened and
closed on October 30, 2023,
NOW, THEREFORE BE IT RESOLVED: the Village Board of Trustees does hereby
renew the special permit held by New York SMA Limited Partnership d/b/a Verizon
Wireless for the for the collocation of a personal wireless facility at 1 Van Wyck
Street, with the following conditions:
1. This permit expires on December 3, 2028 and must be renewed in accordance
with the Telecommunications Chapter of the Village Code.
2. That, the Telecommunications facility shall at all times during the life of the
facility comply with the applicable FCC regulations pertaining to radio
frequency emissions, including such regulations as applicable to cumulative
radio frequency emissions. Any necessary mitigation measures to ensure
compliance shall follow FCC requirements, procedures and protocols.
3. That the tower, including mounted equipment, guy wires, anchors, and all tower
support structures in the attic, be inspected annually by a qualified individual
and a report on the inspection results be submitted to the Village within 30 days
of the inspection.
4. That, in accordance with section 206-5(B) of the Village Code antennas shall
be subject to state and federal regulations pertaining to nonionizing radiation
and other health hazards related to such facilities. The owner of the antenna
shall submit to the Board of Trustees evidence of compliance with the FCC
standards on a yearly basis. If new, more restrictive standards are adopted, the
antennas shall be made to comply, or continued operations may be restricted or
prohibited by the Board of Trustees. The cost of verification of compliance shall
be borne by the owner and operator of the personal wireless facility.
5. That, Verizon Wireless is advised that the Village may switch to a different
Emergency Services communication system in the future and that the Verizon
Wireless system must be operated to prohibit interference, including
implementation of any FCC rebanding plan, to current and future Village
wireless systems.
6. That, any additional monthly cost charged by the Village’s fire alarm company
for the fire/smoke detector and strobe/horn in the facility shall be paid by
Verizon Wireless. The lease agreement with Verizon Wireless shall be
amended to reflect the payment of this additional cost if required by the Village
via written notification to Verizon Wireless.
7. That, as required in the Telecommunications Chapter of the Village Code the
applicant must post a bond in an amount to be determined by the Village
Engineer to cover the costs of removing and disposing of the tower, antenna
and associated facilities. In the event that a tower is not removed within 90 days
of the cessation of operations at a site, the tower and associated facilities may
be removed by the Village and the costs of removal assessed against the
property, the bond or both.
8. That, proper radio frequency and antenna location warning signs be posted and
maintained at the PWS facility compound at 1 Van Wyck Street.
Dated: October 30, 2023
Machine-extracted for search and reference — the original PDF is the authoritative version.