21-22 Site Plan 1-11-2024 FULL SET
site plan
12 pages
Meeting: portal event 920 (no meeting page on file)
Agenda item: New Business — Hannigan, Tom - 52 Upland Lane (67.8-2-1) Minor Site Plan Application for New House
Site plan, 12 pages. Attached to agenda item: “New Business — Hannigan, Tom - 52 Upland Lane (67.8-2-1) Minor Site Plan Application for New House”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
2024-01-10 HanniganSyrek weeHouse Alchemy dwgs 1
DOTS Engineering Review 3.29.2023
Email Chain from Town of Cortlandt
Email from Tim Miller Associates on trees
HanniganSyrek weeHouse Cover Sheet 1
Letter of submission to planning 1-11-24
tree cutting permit complete 6-7-23
Extracted text
S 51° 40
S 88° 55' 45" E
67.06'
N 34° 39' 55" E
14.58'
N 78° 37' 55" E
6.25'
N 42° 31' 55" E
102.19'
N 46° 25' 45" E
98.48'
.00'
N 27° 39' 35" E
32.77'
N 38° 19' 15" E
77.45'
S 88° 55' 45" E
67.06'
S 70° 39' 25" E
28.82'
S 74° 23' 05" E
22.00'
S 70° 56' 05" E
23.25'
S 72° 06' 05" E
98.98'
S 68° 27' 05" E
38.07'
S 27° 34' 55" W
38.39'
S 29° 05' 05" W
50.11'
S 30° 18' 35" W
152.32'
S 27° 58' 35" W
74.29'
S 30° 39' 55" W
66.86'
S 31° 50' 55" W
90.27'
S 32° 00' 35" W
96.58'
N 60° 07' 25" W
189.42'
N 63° 09' 25" W
31.15'
N 47° 03' 05" W
576.36'
S 50° 11' 25" W
50.00'
S 51° 40' 25" W
123.28'
S 46° 55' 05" W
100.35'
S 71° 24' 15" E
33.89'
S 70° 39' 25" E
28.82'
S 22° 34' 05" W
225.18'
30'
6.5'
S 51° 40
PT#6
DT#6
PT#4
DT#4
PT#5
DT#5
TP-3
IT-3
TP-4
IT-4
VILLAGE OF CROTON-ON HUDSON
VILLAGE OF CROTON-ON HUDSON
TOWN OF CORTLANDT
TOWN OF CORTLANDT
30' T.O.C. FRONT YARD SETBACK
30' T.O.C. FRONT YARD SETBACK
30' V.C.O.H. SIDE YARD SETBACK
45' V.C.O.H. REAR YARD SETBACK
PROPOSED DRIVEWAY
PROPOSED 3-BEDROOM RESIDENCE
101.0'
R30'
W
FFE: 586.25
GFE: 583.35
12'
PROPOSED WELL
356.4'
676.5'
84.6'
PROPOSED RETAINING WALL
MAX HEIGHT: 2 FEET.
PROPOSED STORMWATER MANAGEMENT
PROPOSED SEPTIC SYSTEM LOCATION
PROPOSED GRADING
RD
RD
RD
RD
RD
RD
RD
RD
FD
ROOF DRAIN
FOOTING DRAIN
D
D
C
PROPOSED RESIDENCE
2 BEDROOM + 1 FUTURE BEDROOM
GARDEN WITH PATIO
BLEND LANDSCAPING INTO EXISTING FORESTED GROUND
PROPOSED GARDEN
PROPOSED CURB
PROPOSED PAVER DRIVEWAY
PROPOSED EMERGENCY ACCESS ROAD.
PROPOSED RETAINING WALL
C
DATE:
SCALE:
Sheet
of
No.
Date
Comments:
Yorktown Heights, NY 10598
www.sitedesignconsultants.com
Fax: (914) 962-7386
Land Planners
Engineer:
NYS Lic. No. 64431
Joseph C. Riina, P.E.
251-F Underhill Avenue,
Civil Engineers
(914) 962-4488 -
COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
SAFE DIG
Before You Dig, Drill or Blast!
CALL US TOLL FREE 811 or 1-800-962-7962
NY Industrial Code Rule 753 requires no less
than two working days notice, but not more
than ten days notice.
www.digsafelynewyork.com
F:\2021\21-22 THOMAS W. HANNIGAN (BOB DUBRAY)-UPLAND DR - MATT CARROLL\ENGINEERING\CAD\C3D-21-22 THOMAS W. HANNIGAN (BOB DUBRAY)\DWG\21-22 SITE PLAN 1-10-2024.DWG 1/11/2024 9:33:07 AM
1" = 30'
SITE PLAN
PREPARED FOR
SITE PLAN
Westchester County, NY
CS
6-28-2021
0 ALBANY POST ROAD
PROJECT LOCATION
THOMAS HANNIGAN JR
SCALE: 1"=50'-0"
8/30/2022 Eng. comments
21-22
PROJECT #
NOTE:
1.
THIS IS NOT A SURVEY. ALL SURVEY INFORMATION SHOWN ON THIS PLAN HAS BEEN
TAKEN FROM SURVEY MAP PREPARED BY JOSEPH R LINK, L.S., DATED 1/22/21. THE
ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
Town of Croton-on-Hudson
1/3/2023 WCHD comments
10/31/2023 Town comments
N/A
SIDE YARD SETBACK:
NONE
ZONING SCHEDULE OF TOWN OF CORTLANDT:
10,000 SF
35 FEET
20 FT.
- (1)
30 FT.
BUILDING COVERAGE:
FRONT YARD SETBACK:
REAR YARD SETBACK:
MAXIMUM HEIGHT:
MINIMUM LOT AREA PER DWELLING:
0.8 % OF LOT AREA
35 FT MAX
306,442 S.F.
PROVIDED
LOCATION MAP
NOT TO SCALE
MINIMUM SIZE OF LOT:
MINIMUM YARD DIMENSIONS:
PRINCIPAL BUILDING:
NONE
NONE
VARIANCE REQUIRED
NONE
R-10, SINGLE FAMILY RESIDENTIAL
ZONING DISTRICT:
DIMENSIONAL REGULATIONS:
MAXIMUM LOT AREA TO BE OCCUPIED:
PRINCIPAL BUILDING - FEET:
NONE
PRINCIPAL BUILDING - STORIES:
NONE
2 1/2
2 STORIES
SITE DATA:
OWNER:
THOMAS HANNIGAN JR
52 UPLAND ROAD
CORTLANDT, NY 10520
PROJECT LOCATION:
52 UPLAND ROAD
CORTLANDT, NY, 10520
EXISTING TOWN ZONING:
CORTLANDT: R-10. CROTON-ON-HUDSON: R-60
PROPOSED USE:
CORTLANDT: R-10. CROTON-ON-HUDSON: R-60
TOWN TAX MAP DATA:
SECTION 68.08, BLOCK 2, LOT 67.08 & 26
SITE AREA :
7.06 ACRES (307641 SF)
SEWAGE FACILITIES:
SUBSURFACE SEWAGE TREATMENT SYSTEM
WATER FACILITIES:
DRILLED WELL
WATERSHED: -
75 FT.
MINIMUM LOT WIDTH:
375 FT.
NONE
50%
MINIMUM LANDSCAPE COVERAGE:
387 FT.
NONE
--
LOT COVERAGE:
N/A
NONE
--
BUILDING SIZE:
2,885 SF
NONE
N/A
FLOOR AREA RATIO:
0.01
NONE
NONE
PROPERTY LINE / RIGHT OF WAY
EXISTING STONE WALL
PROPOSED GRADING
EXISTING GRADING
EXISTING SPOT GRADE
PROPOSED RIP RAP AT PIPE END
EXISTING TREE TO BE REMOVED
CONSTRUCTION ENTRANCE
LEGEND
PROPOSED RETAINING WALLS
PROPOSED STABILIZED
PROPOSED LIMIT OF DISTURBANCE
FD
RD
PROPOSED FOOTING DRAIN
PROPOSED ROOF DRAIN
EXISTING STONE WALLS TO
BE REMOVED
PROPOSED HOUSE AND DRIVE
PROPOSED SOIL STOCKPILES
PROPOSED SILT FENCE
SS
SS
PROPOSED PERMANENT SWALE
30/80 FT.
ONE SIDE SETBACK/BOTH YARDS:
84.6/676.5 FT.
NONE
ZONING SCHEDULE OF VILLAGE OF CROTON-ON-HUDSON:
60,000 SF
35 FEET
45 FT.
15% OF LOT AREA
50 FT.
BUILDING COVERAGE:
FRONT YARD SETBACK:
REAR YARD SETBACK:
MAXIMUM HEIGHT:
MINIMUM LOT AREA PER DWELLING:
0.8 % OF LOT AREA
35 FT MAX
306,442 S.F.
PROVIDED
356.4 FT.
101 FT.
MINIMUM SIZE OF LOT:
MINIMUM YARD DIMENSIONS:
PRINCIPAL BUILDING:
NONE
NONE
VARIANCE REQUIRED
NONE
R-60, SINGLE FAMILY RESIDENTIAL
ZONING DISTRICT:
DIMENSIONAL REGULATIONS:
MAXIMUM LOT AREA TO BE OCCUPIED:
PRINCIPAL BUILDING - FEET:
NONE
PRINCIPAL BUILDING - STORIES:
NONE
2 1/2
2 STORIES
175 FT.
MINIMUM LOT WIDTH:
597 FT.
NONE
225 FT.
387 FT.
NONE
NONE
MINIMUM LOT DEPTH:
35 FEET
MINIMUM DWELLING REGULATIONS:
35 FT MAX
HABITABLE AREA:
NONE
FLOOR AREA RATIO (1):
NONE
2 1/2
2 1/2 MAX
REQUIRED OFF STREET PARKING:
NONE
2 PER D.U.
UPLAND ROAD
84.6/676.5 FT.
356.4 FT.
101 FT.
1/11/2024 Town comments
CUT
P.O.B. Parcel II
Formerly Parcel III
PARCEL III
PARCEL II
N 78° 32' 10" W
S 80° 29' 10" E
46.41'
S 79° 50' 00" E
57.91'
S 62° 43' 30" E
56.74'
S 58° 44' 20" E
64.46'
S 59° 29' 10" E
33.89'
S 62° 28' 00" E
22.00'
S 60° 11' 00" E
98.98'
S 56° 32' 00" E
38.07'
N 70° 33' 00" E
225.18'
S 39° 30' 00" W
38.39'
S 41° 00' 10" W
50.11'
S 42° 13' 40" W
152.32'
S 39° 53' 40" W
74.29'
S 42° 35' 00" W
66.86'
S 43° 46' 00" W
90.27'
S 43° 55' 40" W
96.58'
TOWN
OF
CORTLANDT
VILLAGE
OF
CROTON
ON
HUDSON
N 48° 12' 20" W
189.42'
N 51° 14' 20" W
31.15'
N 35° 08' 00" W
576.36'
N 39° 34' 40" E
32.77'
N 50° 14' 20" E
77.45'
N 77° 00' 40" W
67.06'
STONE
WALL
STONE
WALL
STONE
WALL
STONE
WALL
N 45° 00' 00" W
50.00'
S 70° 00' 00" W
52.92'
32.00'
N 78° 32' 10" W
28.21'
230.75'
54.81'
35.64'
WAS Bk 323-P76
?
30.5'
30'
GRAVEL
PARKING
AREA
Stream
Remains of
Foundation
Stone Ret.
Wall
STONE
WALL
Bar-Way
Frame
Garage
Deck
Steps
STONE
MASONRY
R
Gu
ASPHALT
Concrete
Block
Aprons
GRAVEL
Stone Mas.
Ret. Wall
STONE
ASPHALT
DRIVEWAY
ASPHALT
PARKING
AREA
EXISTING
DWELLING
PATH
PATH
PATH
PATH
WOOD POST
AND RAIL FENCE
W/ WIRE
S 58° 50' 10" W
100.35'
S 63
S 62° 06' 30" W
50.00'
VACANT LOT
1 Sty.
Frame
Pin Found ?
Stone
Ret. Wall
6.5'
Wood
Plat.
STONE
N 54° 27' 00" E
102.19'
S 89° 27' 00" E
6.25'
N 46° 35' 00" E
14.58'
Ent.
Wood
STONE
P.O.B.Parcel "1A"
LOT
LINE
TO
BE
REMOVED
P.O.B.
S 78° 32' 10" E
262.75'
C
DATE:
SCALE:
Sheet
of
No.
Date
Comments:
Yorktown Heights, NY 10598
www.sitedesignconsultants.com
Fax: (914) 962-7386
Land Planners
Engineer:
NYS Lic. No. 64431
Joseph C. Riina, P.E.
251-F Underhill Avenue,
Civil Engineers
(914) 962-4488 -
COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
SAFE DIG
Before You Dig, Drill or Blast!
CALL US TOLL FREE 811 or 1-800-962-7962
NY Industrial Code Rule 753 requires no less
than two working days notice, but not more
than ten days notice.
www.digsafelynewyork.com
F:\2021\21-22 THOMAS W. HANNIGAN (BOB DUBRAY)-UPLAND DR - MATT CARROLL\ENGINEERING\CAD\C3D-21-22 THOMAS W. HANNIGAN (BOB DUBRAY)\DWG\21-22 SITE PLAN 1-10-2024.DWG 1/11/2024 9:33:07 AM
1" = 30'
EXISTING
CONDITIONS
PLAN
PREPARED FOR
SITE PLAN
Westchester County, NY
CS
6-28-2021
0 ALBANY POST ROAD
PROJECT LOCATION
THOMAS HANNIGAN JR
PROPERTY LINE / RIGHT OF WAY
EXISTING STONE WALL
PROPOSED GRADING
EXISTING GRADING
EXISTING SPOT GRADE
PROPOSED RIP RAP AT PIPE END
EXISTING TREE TO BE REMOVED
CONSTRUCTION ENTRANCE
LEGEND
PROPOSED RETAINING WALLS
PROPOSED STABILIZED
PROPOSED LIMIT OF DISTURBANCE
FD
RD
PROPOSED FOOTING DRAIN
PROPOSED ROOF DRAIN
EXISTING STONE WALLS TO
BE REMOVED
PROPOSED HOUSE AND DRIVE
PROPOSED SOIL STOCKPILES
PROPOSED SILT FENCE
SS
SS
PROPOSED PERMANENT SWALE
SCALE: 1"=50'-0"
8/30/2022 Eng. comments
21-22
PROJECT #
NOTE:
1.
THIS IS NOT A SURVEY. ALL SURVEY INFORMATION SHOWN ON THIS PLAN HAS BEEN
TAKEN FROM SURVEY MAP PREPARED BY JOSEPH R LINK, L.S., DATED 1/22/21. THE
ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
Town of Croton-on-Hudson
1/3/2023 WCHD comments
10/31/2023 Town comments
1/11/2024 Town comments
S 46° 55' 05" W
100.35'
STONE
WALL
STONE
WALL
STONE
WALL
STONE
WALL
323-P76
?
Stream
STONE
WALL
Bar-Way
Frame
Garage
Deck
Steps
EXISTING
DWELLING
1 Sty.
Frame
Wood
Plat.
Ent.
Wood
GLASS AND M
PROPANE
TANK COVER
VILLAGE OF CROTON-ON HUDSON
VILLAGE OF CROTON-ON HUDSON
TOWN OF CORTLANDT
TOWN OF CORTLANDT
W
FFE: 586.25
GFE: 583.35
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
FD
FD
ROOF DRAIN
FOOTING DRAIN
D
D
TREE (TYP.)
TOTAL LIMIT OF DISTURBANCE
±2.12 ACRES
C
PROPOSED RESIDENCE
2 BEDROOM + 1 FUTURE BEDROOM
PROPOSED 8" HDPE PIPE
L= 63 FT, SLOPE= 7.7%
PROPOSED DI-4
RIM: 513.32
INV IN: 512.51
INV OUT: 511.82
PROPOSED DI-6
RIM:
488.53
INV IN: 487.49
INV OUT: 487.03
PROPOSED DI-7
RIM:
470.35
INV OUT: 469.35
PROPOSED 8" HDPE PIPE
L= 161 FT, SLOPE= 9.7%
PROPOSED 8" HDPE PIPE
L= 72 FT, SLOPE= 17.4%
PROPOSED 8" HDPE PIPE
L= 115 FT, SLOPE= 9.7%
PROPOSED 8" HDPE PIPE
L= 49 FT, SLOPE = 39.4%
PROPOSED 70 SC-740 CHAMBERS
BOTTOM OF STONE: 467.22
BOTTOM OF CHAMBER: 467.72
TOP OF CHAMBER: 470.22
PROPOSED 8" HDPE PIPE
L= 151 FT, SLOPE= 1.1%
PROPOSED 8" HDPE PIPE
L= 57 FT, SLOPE= 10.9%
PROPOSED DI-2
RIM: 553.62
INV IN: 552.91
INV OUT: 552.12
PROPOSED DMH-2
RIM: 560.65
INV IN: 559.77
INV OUT: 559.15
PROPOSED 8" HDPE PIPE
L= 238 FT, SLOPE= 9.8%
PROPOSED DI-3
RIM: 529.62
INV IN: 528.89
INV OUT: 528.12
ROCK OUTLET PROTECTION
PROPOSED SWALE
PROPOSED FLOW SPREADER
PROPOSED DI-1
RIM: 570.97
INV OUT: 569.47
PROPOSED DMH-1
RIM: 566.14
INV IN: 564.94
INV OUT: 564.64
PROPOSED 8" HDPE PIPE
L= 56 FT, SLOPE= 8.1%
PROPOSED DI-5
RIM: 500.17
INV IN: 499.31
INV OUT: 498.67
C
DATE:
SCALE:
Sheet
of
No.
Date
Comments:
Yorktown Heights, NY 10598
www.sitedesignconsultants.com
Fax: (914) 962-7386
Land Planners
Engineer:
NYS Lic. No. 64431
Joseph C. Riina, P.E.
251-F Underhill Avenue,
Civil Engineers
(914) 962-4488 -
SCALE: 1"=30'-0"
COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
SAFE DIG
Before You Dig, Drill or Blast!
CALL US TOLL FREE 811 or 1-800-962-7962
NY Industrial Code Rule 753 requires no less
than two working days notice, but not more
than ten days notice.
www.digsafelynewyork.com
F:\2021\21-22 THOMAS W. HANNIGAN (BOB DUBRAY)-UPLAND DR - MATT CARROLL\ENGINEERING\CAD\C3D-21-22 THOMAS W. HANNIGAN (BOB DUBRAY)\DWG\21-22 SITE PLAN 1-10-2024.DWG 1/11/2024 9:33:07 AM
1" = 30'
DRAINAGE
PLAN
PREPARED FOR
SITE PLAN
Westchester County, NY
CS
6-28-2021
0 ALBANY POST ROAD
PROJECT LOCATION
THOMAS HANNIGAN JR
PROPERTY LINE / RIGHT OF WAY
EXISTING STONE WALL
PROPOSED GRADING
EXISTING GRADING
EXISTING SPOT GRADE
PROPOSED RIP RAP AT PIPE END
EXISTING TREE TO BE REMOVED
CONSTRUCTION ENTRANCE
LEGEND
PROPOSED RETAINING WALLS
PROPOSED STABILIZED
PROPOSED LIMIT OF DISTURBANCE
FD
RD
PROPOSED FOOTING DRAIN
PROPOSED ROOF DRAIN
EXISTING STONE WALLS TO
BE REMOVED
PROPOSED HOUSE AND DRIVE
PROPOSED SOIL STOCKPILES
PROPOSED SILT FENCE
SS
SS
PROPOSED PERMANENT SWALE
8/30/2022 Eng. comments
21-22
PROJECT #
NOTE:
1.
THIS IS NOT A SURVEY. ALL SURVEY INFORMATION SHOWN ON THIS PLAN HAS BEEN
TAKEN FROM SURVEY MAP PREPARED BY JOSEPH R LINK, L.S., DATED 1/22/21. THE
ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
Town of Croton-on-Hudson
1/3/2023 WCHD comments
TOWN STORMWATER NOTES:
1.
INFILTRATION BEST PRACTICES SHALL BE DESIGNED IN ACCORDANCE WITH NYSDEC'S STORM
WATER DESIGN MANUAL. DEEP TEST PITS AND PERCOLATION TESTS SHALL BE PERFORMED
BY THE DESIGN PROFESSIONAL AND WITNESSED BY THE TOWN. FOR INFILTRATION
PRACTICES, TEST PITS SHALL BE DUG 3-FT BELOW THE PROPOSE INFILTRATION LEVEL.
2.
PRIOR TO BACKFILLING ANY STORM WATER BEST PRACTICE, CONTACT DOTS - ENGINEERING
TO SCHEDULE AN INSPECTION.
3.
PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY, A CERTIFICATION FROM THE
LICENSED DESIGN PROFESSIONAL THAT ALL STORM WATER BEST MANAGEMENT PRACTICES
WERE INSTALLED IN SUBSTANTIAL CONFORMANCE TO THE APPROVED PLANS ON FILE AND
THAT THERE ARE NO ADVERSE IMPACTS TO ADJACENT AND ADJOINING PROPERTIES
PERTAINING TO STORM WATER RUNOFF.
10/31/2023 Town comments
1/11/2024 Town comments
P.O.B. Parcel II
Formerly Parcel III
PARCE
PARCEL II
TOWN
OF
CORTLANDT
VILLAGE
OF
CROTON
ON
HUDSON
S 46° 55' 05" W
100.35'
STONE
WALL
STONE
WALL
STONE
WALL
STONE
WALL
WAS Bk 323-P76
?
Stream
STONE
WALL
Bar-Way
Frame
Garage
Deck
Steps
EXISTING
DWELLING
WO
AND
W
VACANT LOT
1 Sty.
Frame
Wood
Plat.
Ent.
Wood
GLASS AND METAL FENCE
Gate
P.O.B.Parcel "1A"
Pool
PROPANE
TANK COVER
P.O.B.
PT#6
DT#6
PT#4
DT#4
PT#5
DT#5
TP-3
IT-3
TP-4
IT-4
SS
SS
SS
SS
W
FFE: 586.25
GFE: 583.35
PROPOSED SOIL STOCKPILE (TYP.)
TOTAL LIMIT OF DISTURBANCE
±1.88 ACRES
PROPOSED SILT FENCE (TYP.)
PROPOSED STABILIZED CONSTRUCTION ENTRANCE
PROPOSED EROSION BLANKETS (TYP.)
D
D
C
PROPOSED RESIDENCE
2 BEDROOM + 1 FUTURE BEDROOM
SS
SS
C
DATE:
SCALE:
Sheet
of
No.
Date
Comments:
Yorktown Heights, NY 10598
www.sitedesignconsultants.com
Fax: (914) 962-7386
Land Planners
Engineer:
NYS Lic. No. 64431
Joseph C. Riina, P.E.
251-F Underhill Avenue,
Civil Engineers
(914) 962-4488 -
SCALE: 1"=30'-0"
COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
SAFE DIG
Before You Dig, Drill or Blast!
CALL US TOLL FREE 811 or 1-800-962-7962
NY Industrial Code Rule 753 requires no less
than two working days notice, but not more
than ten days notice.
www.digsafelynewyork.com
F:\2021\21-22 THOMAS W. HANNIGAN (BOB DUBRAY)-UPLAND DR - MATT CARROLL\ENGINEERING\CAD\C3D-21-22 THOMAS W. HANNIGAN (BOB DUBRAY)\DWG\21-22 SITE PLAN 1-10-2024.DWG 1/11/2024 9:33:07 AM
1" = 30'
EROSION AND
SEDIMENT
CONTROL
PLAN
PREPARED FOR
SITE PLAN
Westchester County, NY
CS
6-28-2021
0 ALBANY POST ROAD
PROJECT LOCATION
THOMAS HANNIGAN JR
PROPERTY LINE / RIGHT OF WAY
EXISTING STONE WALL
PROPOSED GRADING
EXISTING GRADING
EXISTING SPOT GRADE
PROPOSED RIP RAP AT PIPE END
EXISTING TREE TO BE REMOVED
CONSTRUCTION ENTRANCE
LEGEND
PROPOSED RETAINING WALLS
PROPOSED STABILIZED
PROPOSED LIMIT OF DISTURBANCE
FD
RD
PROPOSED FOOTING DRAIN
PROPOSED ROOF DRAIN
EXISTING STONE WALLS TO
BE REMOVED
PROPOSED HOUSE AND DRIVE
PROPOSED SOIL STOCKPILES
PROPOSED SILT FENCE
SS
SS
PROPOSED PERMANENT SWALE
8/30/2022 Eng. comments
21-22
PROJECT #
NOTE:
1.
THIS IS NOT A SURVEY. ALL SURVEY INFORMATION SHOWN ON THIS PLAN HAS BEEN
TAKEN FROM SURVEY MAP PREPARED BY JOSEPH R LINK, L.S., DATED 1/22/21. THE
ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
Town of Croton-on-Hudson
1/3/2023 WCHD comments
10/31/2023 Town comments
1/11/2024 Town comments
S 46° 55' 05" W
100.35'
STONE
WALL
STONE
WALL
STONE
WALL
STONE
WALL
WAS Bk 323-P76
?
Stream
STONE
WALL
Bar-Way
Frame
Garage
Deck
Steps
EXISTING
DWELLING
WO
AND
W
1 Sty.
Frame
Wood
Plat.
Ent.
Wood
GLASS AND METAL FENCE
Gate
Pool
PROPANE
TANK COVER
W
FFE: 586.25
GFE: 583.35
C
PROPOSED RESIDENCE
2 BEDROOM + 1 FUTURE BEDROOM
C
DATE:
SCALE:
Sheet
of
No.
Date
Comments:
Yorktown Heights, NY 10598
www.sitedesignconsultants.com
Fax: (914) 962-7386
Land Planners
Engineer:
NYS Lic. No. 64431
Joseph C. Riina, P.E.
251-F Underhill Avenue,
Civil Engineers
(914) 962-4488 -
SCALE: 1"=30'-0"
NOTE:
1.
THIS IS NOT A SURVEY. ALL SURVEY INFORMATION SHOWN ON THIS PLAN HAS BEEN
TAKEN FROM SURVEY MAP PREPARED BY JOSEPH R LINK, L.S., DATED 1/22/21. THE
ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
SAFE DIG
Before You Dig, Drill or Blast!
CALL US TOLL FREE 811 or 1-800-962-7962
NY Industrial Code Rule 753 requires no less
than two working days notice, but not more
than ten days notice.
www.digsafelynewyork.com
F:\2021\21-22 THOMAS W. HANNIGAN (BOB DUBRAY)-UPLAND DR - MATT CARROLL\ENGINEERING\CAD\C3D-21-22 THOMAS W. HANNIGAN (BOB DUBRAY)\DWG\21-22 SITE PLAN 1-10-2024.DWG 1/11/2024 9:33:07 AM
1" = 30'
SLOPE
DISTURBANCE
PLAN
PREPARED FOR
SITE PLAN
Westchester County, NY
CS
6-28-2021
0 ALBANY POST ROAD
PROJECT LOCATION
THOMAS HANNIGAN JR
8/30/2022 Eng. comments
21-22
PROJECT #
SLOPE DISTURBANCE
SLOPE
15% - 25%
25% - 35%
> 35%
Town of Croton-on-Hudson
1/3/2023 WCHD comments
10/31/2023 Town comments
VILLAGE OF CROTON ON HUDSON
TOWN OF CORTLANDT
13,376 SF = 0.31 AC
13,994 SF = 0.32 AC
9,910 SF = 0.23 AC
3,228 SF = 0.07 AC
11,620 SF = 0.27 AC
2,786 SF = 0.06 AC
COMPLIES
EXCEEDS BY 2,908 SF
COMPLIES
1/11/2024 Town comments
S 80° 29' 10" E
46.41'
S 79° 50' 00" E
57.91'
S 62° 43' 30" E
56.74'
S 58° 44' 20" E
64.46'
S 59° 29' 10" E
33.89'
S 62° 28' 00" E
22.00'
S 60° 11' 00" E
98.98'
S 56° 32' 00" E
38.07'
225.18'
S 39
S 41° 00' 10" W
50.11'
S 42° 13' 40" W
152.32'
S 39° 53' 40" W
74.29'
S 42° 35' 00" W
66.86'
S 43° 46' 00" W
90.27'
S 43° 55' 40" W
96.58'
S 46° 55' 05
100.35'
N 48° 12' 20" W
189.42'
N 51° 14' 20" W
31.15'
WALL
STONE
WALL
STONE
WALL
STONE
WALL
S 70° 00' 00" W
52.92'
N 78° 32' 10" W
28.21'
54.81'
35.64'
?
30.5'
G
PARKING
AREA
Remains of
Foundation
Stone Ret.
Wall
rame
Garage
k
Stone Mas.
Ret. Wall
STONE
ASPHALT
DRIVEWAY
ASPHALT
PARKING
AREA
EXISTING
DWELLING
PATH
PATH
S 58° 50
100.3
Pin Found ?
Stone
Ret. Wall
DI-#1
S 60° 11' 00" E
PT#6
DT#6
PT#4
DT#4
PT#5
DT#5
TP-3
IT-3
W
PROPOSED WELL
FFE: 586.25
GFE: 583.35
6' O.C.
100' SEPARATION TO OWTS
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
47'
47'
47'
47'
10' SEPTIC TANK SETBACK
20' SEPTIC SYSTEM SETABCK
10' SEPTIC SYSTEM SETBACK
47'
47'
47'
47'
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
RD
FD
FD
ROOF DRAIN
FOOTING DRAIN
10' SEPTIC SYSTEM SETBACK
D
D
C
72.9'
59.7'
4" SOLID PVC PIPE
L = 124 FT; S = 14.9% MIN
24" WIDE SEPTIC TRENCH 6' O.C.
WITH A 4" PERFORATED PIPE (TYP.)
TOTAL LENGTH = 188 FT.
100% SSDS FUTURE EXPANSION
P/C CONC. JUNCTION BOX (TYP.)
PROPOSED CLEANOUT (TYP.)
O' TO 3' R.O.B. GRAVEL FILL FOR
GRADING PURPOSES
1,000 GAL. P/C CONC.
SEPTIC TANK
4" DIA. SDR 35 PVC PIPE
L = 10 FT; S = 2% MIN
4" SOLID PVC PIPE
L = 79 FT; S = 2.5%
ELECTRIC LINE LOCATION
50' MIN
TO OWTS
PROPOSED RESIDENCE
2 BEDROOM + 1 FUTURE BEDROOM
25.0'
MIN. TO OWTS
C
DATE:
SCALE:
Sheet
of
No.
Date
Comments:
Yorktown Heights, NY 10598
www.sitedesignconsultants.com
Fax: (914) 962-7386
Land Planners
Engineer:
NYS Lic. No. 64431
Joseph C. Riina, P.E.
251-F Underhill Avenue,
Civil Engineers
(914) 962-4488 -
SCALE: 1"=30'-0"
COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
SAFE DIG
Before You Dig, Drill or Blast!
CALL US TOLL FREE 811 or 1-800-962-7962
NY Industrial Code Rule 753 requires no less
than two working days notice, but not more
than ten days notice.
www.digsafelynewyork.com
F:\2021\21-22 THOMAS W. HANNIGAN (BOB DUBRAY)-UPLAND DR - MATT CARROLL\ENGINEERING\CAD\C3D-21-22 THOMAS W. HANNIGAN (BOB DUBRAY)\DWG\21-22 SITE PLAN 1-10-2024.DWG 1/11/2024 9:33:07 AM
1" = 30'
SEPTIC PLAN
PREPARED FOR
SITE PLAN
Westchester County, NY
CS
6-28-2021
Town of Croton-on-Hudson
0 ALBANY POST ROAD
PROJECT LOCATION
THOMAS HANNIGAN JR
PRIVATE DRILLED WELL CONSTRUCTION REQUIREMENTS:
1. All water supply drilled wells may not be constructed without a valid permit issued by the WCHD. Wells shall
constructed in accordance with NYSDOH and WCHD standards.
2. Wells must be sited to meet all minimum restrictive distances. Wells must be sited as per plan. Any deviation
must be approved by the Engineer and, if required, by the WCHD.
3. There are no sources of contamination within 200' of the proposed well (where new wells are proposed).
4. The top of the well must be 18" above finished grade which shall slope away in all directions to provide
positive drainage.
5. Minimum well yield shall be 5 gpm based on a 6 hour pump test and have a minimum 42 gallon pressure tank.
Yield tests below 5 gpm will require a special design(see WCHD standards). Well yields below 2 gpm are not
acceptable.If a well yield of less than 5 gpm is encountered, contact the WCHD immediately.
6. Well locations shown on plan are based on setback requirments and does not guarantee adequate water
supply. A hydrogeologist should be consulted for conformation of water supply, if desired.
7. Well shall be installed by a New York State Department of Environmental Conservation Registered well driller.
8. Drilled well to be sampled and tested in accordance with WCDOH Private well testing Law.
MINIMUM RESTRICTIVE DISTANCES TO WELL:
1. Property Line 10 feet
2. Sewage System Tankage 50 feet
3. Foundation 10 feet
4. Swimming Pools 10 feet
5. Watercourse or Waterbody 50 feet
6. Absorption Trench 100 feet; 200 feet general path of drainage
7. Seepage Pit 150 feet; 200 feet general path of drainage
8. Tri-gallery, 4x4 150 feet; 200 feet general path of drainage
9. Flow Diffusor 100 feet; 200 feet general path of drainage
HEALTH DEPARTMENT SEPTIC SCHEDULE
REMARKS
APPLICATION
RATE
(GPD/SF)
MIN.
DESIGN
RATE
NO. OF
BEDROOMS
DESIGN
FLOW
RATE
REQD.
TRENCH
LENGTH
1,296 S.F.
TP-#4
TP-#6
TP-#5
8" T.SOIL, 8"-48" BR. MED. COMP. SANDY LOAM, 48"-84 MD FINE SANDS MIXED W/ GRAVEL OR COBBLES, @84" NO ROCK, NO GW
306,485 S.F.
5.2 %
7'-0"
7'-0"
7'-0"
PT-5
PT-4
6 - 7 MIN.
8 - 10 MIN.
DEEP TEST PIT DESCRIPTION
PERCENT
SLOPE
AREA
PERC
TEST
NO.
PERC.
RATE
(MIN/IN)
TOTAL
DEPTH
DEPTH
TO
WATER
DEPTH
TO
ROCK
S.S.T.A.
AREA
(S.F.)
LOT
AREA
(S.F.)
TEST
HOLE NO.
0.9
8 -10 MIN.
DESIGN DATA
2 BRM
330 GPD
184 LF
DEPTH
VOLUME
DEPTH
LENGTH
BANK RUN FILL
CURTAIN DRAIN
TANK
SIZE
1,000 GAL
0-3 FT
±3,888 FT³
PT-6
6 - 7 MIN.
B
CsD
ChB
CHARLTON
B
SOILS CLASSIFICATIONS
TYPE
NAME
DESCRIPTION
HYDROLOGICAL
GROUP
CrC
VERY ROCKY
CHARLTON-CHATFIELD
B
8" T.SOIL, 8"-48" BR. MED. COMP. SANDY LOAM, 48"-84 MD FINE SANDS MIXED W/ GRAVEL OR COBBLES, @84" NO ROCK, NO GW
8" T.SOIL, 8"-48" BR. MED. COMP. SANDY LOAM, 48"-84 MD FINE SANDS MIXED W/ GRAVEL OR COBBLES, @84" NO ROCK, NO GW
CHATFIELD-CHARLTON
FINE SANDY LOAM
VERY ROCKY
SITE DATA:
OWNER:
THOMAS HANNIGAN JR
0 ALBANY POST ROAD
CROTON-ON-HUDSON, NY 10520
PROJECT LOCATION:
0 ALBANY POST ROAD
CROTON- ON -HUDSON, NY, 10520
EXISTING TOWN ZONING:
CORTLANDT: R-10. CROTON-ON-HUDSON: R-60
PROPOSED USE:
CORTLANDT: R-10. CROTON-ON-HUDSON: R-60
TOWN TAX MAP DATA:
SECTION 67.8, BLOCK 2, LOT 1
SITE AREA :
7.06 ACRES (307,641 SF)
SEWAGE FACILITIES:
SUBSURFACE SEWAGE TREATMENT SYSTEM
WATER FACILITIES:
DRILLED WELL
WATERSHED: PEEKSKILL / HAVERSTRAW BAY
LOCATION MAP
NOT TO SCALE
SEPTIC DESIGN AREA: SLOPE
EXISTING EXPANSION SYSTEM AREA 10.0%
PROPOSED EXPANSION SYSTEM AREA 5.8%
8/30/2022 Eng. comments
21-22
PROJECT #
UPLAND ROAD
HOLLIS LANE
MT. AIRY RD W
NOTE:
1.
THIS IS NOT A SURVEY. ALL SURVEY INFORMATION SHOWN ON THIS PLAN HAS BEEN
TAKEN FROM SURVEY MAP PREPARED BY JOSEPH R LINK, L.S., DATED 1/22/21. THE
ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
SEPARATION DISTANCES
FROM WASTEWATER SOURCES
WASTEWATER
SOURCES
HOUSE SEWER
SEPTIC TANK
EFFLUENT LINE /
FORCE MAIN
DISTRIBUTION BOX /
JUNCTION BOX
ABSORPTION FIELD (F)
SEEPAGE PIT
DRY WELL (D)
ROOF & FOOTINGS
ROADS & DRIVEWAY
DRILLED WELL
OR SECTION
LINE (G) (FT)
TO STREAM
LAKE
WATERCOURSE
(B) OR
WETLAND (FT)
PROPERTY
LINES
(FT)
25' CIP
50'
50'
100'
100' (A)
150' (A)
50'
25'
100'
50'
50'
25'
10'
100'
100'
10'
10'
10'
10'
10'
10'
NOTES:
A.
Wells located in the general path of drainage of a SSTS must be located 200 feet or more away. All public water supply wells must be 200
feet from absorption fields or seepage pits.
B.
Mean high water mark of defined stream or lake.
C. Drywells are not allowed above OWTS (drywells, Stormwater infiltrator or other subsurface stormwater infiltrator units)
D. For slab on grade foundations with no drains, distance can be reduced in half.
E.
For all systems involving placement of fill, separation disctances are measured from the toe of slope of the fill.
F.
Closest part of OWTS shall be located at least ten (10) feet from any water service line (1.e. - PWS main, water service connection, well).
G. Recommended
H.
Septic tanks are not permitted beneath raised decks and require a minimum of five (5) feet separation from deck piers (sonotubes)
ADDITIONAL SEPERATION DISTANCES FROM SSTA TO:
1.
Piped Drainage 25 feet
2.
Open Channel Drainage 50 feet
3.
Curtain Drain (upgrade from SSTS) 15 feet
4.
Curtain Drain (downgrade from SSTS) 50 feet
5.
Catch Basin 50 feet
6.
Driveway 5 feet
7.
Stormwater Basin 100 feet (high water elevation)
8.
Above Ground Well 10 feet
9.
Deck with Pilings / sonotube 10 feet
10. Slab on Grade Foundation 10 feet
11. Roof & Fotting Drain Discharge Pipe 10 feet
DRAINAGE
DITCH/RAIN
GARDEN
(H) (FT)
10'
10'
10'
20'
20'
20'
10'
INGROUND
POOL (FT)
10'
20'
10'
20'
35'
50'
20'
DWELLING
(FT)
3'
10' (H)
10'
20' (D)
20' (D)
20' (D)
20'
50' OTHER
100'
25'
20'
10'
20'
WCHD NOTES:
1. The design professional shall supervise the construction of the SSTS and make an open works inspection.
2. Within 24-hours of the completion of the SSTS, the design professional must notify the Westchester County
Department of Health that the SSTS is ready for inspection by submitting a completed request for an open
works inspection on the appropriate form to the Department.
3. There are no sources of contamination within 200 feet of the proposed well.
4. There shall be no trees within 10 feet of the OWTS.
5. That no backfilling of a completed OWTS can occur until after it has been inspected and accepted by the
Westchester County Department of Health.
6. After backfilling the OWTS, the area shall be covered with a minimum of 4 inches of clean top soil seeded and
mulched.
7. There are no DEC wetlands, streams, ponds etc. with in 200' of SSTS. There are no reservior/reservior stems
or controlled lake with in 500' of SSTS.
8. There is 1.88 AC of proposed disturbance.
9. There are no existing or proposed wells within 200 feet of the proposed OWTS.
10.There are no existing SSTS within 200 ft of well unless otherwise shown on this plan.
11.Estimated construction and completion date: December 2022 to December 2023.
SEPTIC CONSTRUCTION REQUIREMENTS:
General
1. The installation of the OWTS shall be in accordance with the most recently enacted Rules and Regulations for the Design
and Construction of Residential Subsurface Sewage Treatment Systems and Drilled Wells in Westchester County, NY.
2. The Westchester County Health Department approval expires one year from the date on the approval stamp and is
required to be renewed on or before the expiration date. The approval is revocable for cause or may be amended or
modified when considered necessary by the department.
3. All work performed including new installations, repairs, relocations, etc. shall have all current required permits or
approvals.
4. No regrading in SSTS area except as shown on this plan.
5. Boulders, if any on surface of ground shall be cleared away prior to construction of the SSTS.
6. Prior to any excavation all underground utilities must be located. Call 1-800-962-7962.
House Connection & Tanks
7. The house sewer to tank connection shall be a minimum 4" diameter at a minimum slope of 2.0%. The pipe shall be cast
iron, ductile iron, or sewer grade PVC. All materials shall comply to the NYS Uniform Fire Prevention and Building
Code(9NYCRR). The house trap shall have a cleanout and fresh air intake having a minimum diameter of one-half.
8. If cover exceeds 2 ft over any installed tank or chamber, a manhole and collar to grade is required for access. Minimum
requirement of 6-12" of cover over all tanks and chambers.
Absorption Fields
9. Absorption Fields to be constructed of 4" perforated PVC pipe or equal, encased in crushed stone over pipe with standard
precast junction boxes at influent connection and 4" solid PVC pipe running from septic tank outlet to and between
junction boxes.
10.Minimum Trench Depth = 18", Trench Width = 24".
11.Total depth of stone in trench = 12" (washed gravel 3/4" to 1 1/2").
12.Maximum backfill over trench - 14".
13.All septic field laterals shall be of equal length (60' max. w/o dosing and 100' max. if dosed) and parallel to contours at a
slope rate of 1/16" per foot.
14.All pipes connecting to tank and boxes shall be cut flush with the inside wall of box.
15.PVC pipe to meet minimum standards of ASTM D-2729.
16.Absorption trenches shall not be installed or backfilled in wet, frozen, frost or snow covered soils.
17.Backfill material for the trenches shall contain no particles with any dimension greater than 4". Backfill septic material must
be inspected and approved by the WCHD before installation.
18.No laterals shall be placed beneath a driveway or paved areas.
19.There shall be no trees within 10 feet of the absrption fields.
20.End caps to be placed at end of all 4" perforated P.V.C. pipe in absorption fields.
Fill Section
21.R.O.B. gravel and impervious material to be inspected and approved by the Design Engineer prior to installation of the
proposed system. Fill shall contain no particles greater than 4" in diameter. Fill shall be placed over expansion area where
shown as required by WCHD.
22.Fill stabilization may not be achieved by mechanical compaction Only by a natural settling, for a period required by
W.C.H.D. which may include a freeze-thaw cycle. Percolation tests must be done in stabilized fill and must meet the
design rate.
23.Prior to submission of Certificate of Compliance to WCHD, fill section must be stabilized with grass seed and hay cover.
GENERAL NOTES:
1. A written permit and/or approval issued by the WCHD to construct an individual sewerage system shall terminate and
therefore be null and void unless construction is undertaken within one (1) year of the date of issuance.
2. If for any reason the approved construction plan cannot be followed, a revised plan must be prepared, submitted and
approved by the WCHD.
3. All construction to be in accordance with these plans and last revised set of WCHD Rules and Regulations
4. All SSTS and wells shall be located in the exact location as shown on this plan unless otherwise authorized by the WCHD.
5. Existing wells and SDS shown on this map were installed prior to approval date and are not part of this approval.
6. All laundry and kitchen wastes shall be discharged into the SSTS.
7. No cellar, roof or footing drains shall be discharged into the SSTS or within 25' of any well.
8. Within 24-hours of the completion of the OWTS, the design professional must notify the Westchester County Department
of Health (WCDH) that the OWTS is ready for inspection by submitting a completed request for an open works inspection
on the appropriate form to WCDH.
9. Prior to commencement of operation, a Certificate of Compliance must be applied for and received from WCHD.
10.The proposed SSDS shall be isolated and protected against damage by erosion, storage of earth or materials,
displacement,compaction or other adverse physical change in the characteristics of the soil or in the drainage of area
11.Proposed septic area to be kept free of traffic and debris during house construction and install adequate drainage to
prevent erosion after septic is installed.
12.Any modifications or deviations from this plan must be approved by the Design Engineer and WCHD prior to construction.
13.The Engineer shall not be held responsible or held accountable for the integrity of any structures constructed or under
construction prior to the approval of the plans.
14.All conditions, locations, and dimensions shall be field verified and the Engineer shall be immediately notified of any
discrepancies.
15.All written dimensions on the drawings shall take precedence over any scaled dimensions.
16.The Design Engineer shall supervise the construction of the SSTS and make an open works inspection.
17.The Design Engineer disclaims any liability for damage or loss incurred during or after construction.
18.The proposed OWTS shall be installed by a Westchester County licensed septic contractor. Well shall be installed by a
New York State Department of Environmental Conservation Registered well driller.
19.Contractor to verify all substructures encountered during construction.
20.The Contractor shall supervise and direct the work using his best skill and attention. He shall be solely responsible for all
construction means, methods, techniques, sequences, and procedures and for coordinating all portions of the work under
the contract.
21.The Contractor shall be responsible to the owner for the acts and omissions of his employees, subcontractors, and their
agents and employees, and any other persons performing any of the work under a contract with the Contractor.
22.Unauthorized alterations or additions to this drawing is a violation of Section 7209 (2) of the New York State Education
Law.
23.Survey and topographical information shown hereon prepared by surveyor:Joseph R. Link, L.S.
+
1 FUTURE
BRM
1/3/2023 WCHD comments
10/31/2023 Town comments
1/11/2024 Town comments
S 88° 55' 45" E
67.06'
N 34° 39' 55" E
14.58'
N 42° 31' 55" E
102.19'
N 27° 39' 35" E
32.77'
N 38° 19' 15" E
77.45'
S 88° 55' 45" E
67.06'
S 70° 39' 25" E
28.82'
S 74° 23' 05" E
22.00'
S 70° 56' 05" E
23.25'
S 72° 06' 05" E
98.98'
S 68° 27' 05
38.07'
S 27° 34' 55" W
38.39'
S 29° 05' 05" W
50.11'
S 30° 18' 35" W
152.32'
S 27° 58' 35" W
74.29'
S 30° 39' 55" W
66.86'
S 31° 50' 55" W
90.27'
S 32° 00' 35" W
96.58'
N 60° 07' 25" W
189.42'
N 63° 09' 25" W
31.15'
N 47° 03' 05" W
576.36'
N 78° 32' 10" W
S 80° 29' 10" E
46.41'
S 79° 50' 00" E
57.91'
S 62° 43' 30" E
56.74'
S 58° 44' 20" E
64.46'
S 59° 29' 10" E
33.89'
S 62° 28' 00" E
22.00'
S 60° 11' 00" E
98.98'
S 56° 32' 00" E
38.07'
N 70
225.18'
S 39° 30' 00" W
38.39'
S 41° 00' 10" W
50.11'
S 42° 13' 40" W
152.32'
S 39° 53' 40" W
74.29'
S 42° 35' 00" W
66.86'
S 43° 46' 00" W
90.27'
S 43° 55' 40" W
96.58'
S 46° 55' 05" W
100.35'
N 48° 12' 20" W
189.42'
N 51° 14' 20" W
31.15'
N 35° 08' 00" W
576.36'
34' 40" E
32.77'
N 50° 14' 20" E
77.45'
N 77° 00' 40" W
67.06'
STONE
WALL
STONE
WALL
STONE
WALL
STONE
WALL
S 71° 24' 15" E
33.89'
S 70° 39' 25" E
28.82'
N 45° 00' 00" W
50.00'
S 70° 00' 00" W
52.92'
32.00'
N 78° 32' 10" W
28.21'
230.75'
54.81'
35.64'
WAS Bk 323-P76
?
30.5'
30'
GRAVEL
PARKING
AREA
Stream
Remains of
Foundation
Stone Ret.
Wall
STONE
WALL
Bar-Way
Frame
Garage
Deck
Steps
ASPHALT
Stone Mas.
Ret. Wall
STONE
ASPHALT
DRIVEWAY
ASPHALT
PARKING
AREA
EXISTING
DWELLING
PATH
PATH
PATH
PATH
WO
AND
W
S 58° 50' 10" W
100.35'
S 62° 0
50.0
1 Sty.
Frame
Pin Found ?
Stone
Ret. Wall
Wood
Plat.
N 54° 27
102.19
S 89° 27' 00" E
6.25'
N 46° 35' 00" E
14.58'
Ent.
Wood
Gate
Gate
Gate
S
Re
GLASS AND METAL FENCE
Gate
Pool
PROPANE
TANK COVER
RETAINING WALL
S 78° 32' 10" E
262.75'
PT#6
DT#6
PT#4
DT#4
PT#5
DT#5
TP-3
IT-3
TP-4
IT-4
VILLAGE OF CROTON-ON HUDSON
VILLAGE OF CROTON-ON HUDSON
TOWN OF CORTLANDT
TOWN OF CORTLANDT
W
FFE: 586.25
GFE: 583.35
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
D
D
TREE (TYP.)
TOTAL LIMIT OF DISTURBANCE
±2.12 ACRES
C
0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
8+00
9+00
10+00
11+00
12+00
12+35.28
PROPOSED RESIDENCE
2 BEDROOM + 1 FUTURE BEDROOM
C
3128 3126
DATE:
SCALE:
Sheet
of
No.
Date
Comments:
Yorktown Heights, NY 10598
www.sitedesignconsultants.com
Fax: (914) 962-7386
Land Planners
Engineer:
NYS Lic. No. 64431
Joseph C. Riina, P.E.
251-F Underhill Avenue,
Civil Engineers
(914) 962-4488 -
SCALE: 1"=30'-0"
COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
SAFE DIG
Before You Dig, Drill or Blast!
CALL US TOLL FREE 811 or 1-800-962-7962
NY Industrial Code Rule 753 requires no less
than two working days notice, but not more
than ten days notice.
www.digsafelynewyork.com
F:\2021\21-22 THOMAS W. HANNIGAN (BOB DUBRAY)-UPLAND DR - MATT CARROLL\ENGINEERING\CAD\C3D-21-22 THOMAS W. HANNIGAN (BOB DUBRAY)\DWG\21-22 SITE PLAN 1-10-2024.DWG 1/11/2024 9:33:07 AM
1" = 30'
TREE
DISTURBANCE
PLAN
PREPARED FOR
SITE PLAN
Westchester County, NY
CS
6-28-2021
0 ALBANY POST ROAD
PROJECT LOCATION
THOMAS HANNIGAN JR
8/30/2022 Eng. comments
21-22
PROJECT #
NOTE:
1.
THIS IS NOT A SURVEY. ALL SURVEY INFORMATION SHOWN ON THIS PLAN HAS BEEN
TAKEN FROM SURVEY MAP PREPARED BY JOSEPH R LINK, L.S., DATED 1/22/21. THE
ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY.
Town of Croton-on-Hudson
1/3/2023 WCHD comments
10/31/2023 Town comments
1/11/2024 Town comments
DATE:
SCALE:
Sheet
of
No.
Date
Comments:
Yorktown Heights, NY 10598
www.sitedesignconsultants.com
Fax: (914) 962-7386
Land Planners
Engineer:
NYS Lic. No. 64431
Joseph C. Riina, P.E.
251-F Underhill Avenue,
Civil Engineers
(914) 962-4488 -
COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW.
F:\2021\21-22 THOMAS W. HANNIGAN (BOB DUBRAY)-UPLAND DR - MATT CARROLL\ENGINEERING\CAD\C3D-21-22 THOMAS W. HANNIGAN (BOB DUBRAY)\DWG\21-22 SITE PLAN 1-10-2024 WITH TREES.DWG 5/20/2021 3:31:44 PM
1" = 30'
TREE
DISTURBANCE
PLAN DETAILS
PREPARED FOR
SITE PLAN
Westchester County, NY
CS
6-28-2021
0 ALBANY POST ROAD
PROJECT LOCATION
THOMAS HANNIGAN JR
Tag
Common Name
Scientific Name
DBH
Cond.
Within LOD?
Remove?
Notes
Black birch
Betula lenta
Dead
Yes
Yes
Standing dead tree. Remove based on condition
Black birch
Betula lenta
Dead
Yes
Yes
Standing dead tree. Remove based on condition
Black birch
Betula lenta
Dead
No
Yes
Remove based on condition
Black birch
Betula lenta
Dead
No
Yes
Remove based on condition
Black birch
Betula lenta
Dead
Yes
Yes
Remove based on condition
White ash
Fraxinus americana
Dead
Yes
Yes
Remove based on condition
Black cherry
Prunus serotina
Dead
Yes
Yes
Remove based on condition
Black birch
Betula lenta
Dead
Yes
Yes
Remove based on condition
Black cherry
Prunus serotina
Dead
No
Yes
Remove based on condition
Black birch
Betula lenta
Dead
Yes
Yes
Remove based on condition
Black birch
Betula lenta
Dead
Yes
Yes
Remove based on condition
Black birch
Betula lenta
Dead
No
Yes
Remove based on condition
Black birch
Betula lenta
Dead
Yes
Yes
Remove based on condition
Black birch
Betula lenta
Dead
Yes
Yes
Remove based on condition
Ash
Fraxinus
Dead
No
Yes
Standing dead tree. Remove based on condition
Red maple
Acer rubrum
Dead
Yes
Yes
Remove based on condition
Black birch
Betula lenta
Dead
No
Yes
Dead tree leaning over proposed drive. Remove based on
condition
Black birch
Betula lenta
Dead
Yes
Yes
Remove based on condition
Black birch
Betula lenta
Dead
No
Yes
Remove based on condition
Black birch
Betula lenta
Dead
Yes
Yes
Remove based on condition
Black birch
Betula lenta
Dead
No
Yes
Remove based on condition
Black birch
Betula lenta
Dead
No
Yes
Standing dead tree leans toward proposed drive. Remove
based on condition
Black birch
Betula lenta
Dead
Yes
Yes
Remove based on condition
Black birch
Betula lenta
Dead
Yes
Yes
Remove based on condition
Black birch
Betula lenta
Dead
Yes
Yes
Remove based on condition
Black birch
Betula lenta
Dead
No
Yes
Remove based on condition
Black birch
Betula lenta
Dead
Yes
Yes
Remove based on condition
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
No
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Norway maple
Acer platanoides
Fair
Yes
Yes
Invasive species
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
No
Yes
Basal decay
Black birch
Betula lenta
Fair
Yes
Yes
Basal decay
Black birch
Betula lenta
Fair
Yes
Yes
None
Japanese falsecypress
Chamaecyparis pisifera
Fair
No
Yes
None
Black birch
Betula lenta
Fair
No
Yes
None
Japanese falsecypress
Chamaecyparis pisifera
Fair
No
Yes
None
Japanese falsecypress
Chamaecyparis pisifera
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black cherry
Prunus serotina
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Norway maple
Acer platanoides
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
Column of decay along trunk
Flowering dogwood
Cornus florida
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
Codominant near base.
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
Yes
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black cherry
Prunus serotina
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
Codominant at base
American elm
Ulmus americana
Fair
No
No
None
Black oak
Quercus velutina
Fair
No
Yes
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black cherry
Prunus serotina
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Black birch
Betula lenta
Fair
No
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Hornbeam
Carpinus caroliniana
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Hornbeam
Carpinus caroliniana
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Hornbeam
Carpinus caroliniana
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
No
No
None
Hornbeam
Carpinus caroliniana
Fair
No
No
None
Hornbeam
Carpinus caroliniana
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
American elm
Ulmus americana
Fair
No
No
None
Sweet cherry
Prunus avium
Fair
No
No
None
Sweet cherry
Prunus avium
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Flowering dogwood
Cornus florida
Fair
No
No
None
American elm
Ulmus americana
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black cherry
Prunus serotina
Fair
No
No
None
Flowering dogwood
Cornus florida
Fair
No
No
None
Flowering dogwood
Cornus florida
Fair
No
No
None
Black cherry
Prunus serotina
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Hornbeam
Carpinus caroliniana
Fair
No
No
None
American elm
Ulmus americana
Fair
No
No
None
Norway maple
Acer platanoides
Fair
Yes
Yes
Invasive species
Black birch
Betula lenta
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Norway maple
Acer platanoides
Fair
Yes
Yes
Invasive species
Hornbeam
Carpinus caroliniana
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Sugar maple
Acer saccharum
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Norway maple
Acer platanoides
Fair
No
No
Invasive species
Hornbeam
Carpinus caroliniana
Fair
Yes
Yes
None
Black gum
Nyssa sylvatica
Fair
No
No
None
Hornbeam
Carpinus caroliniana
Fair
No
No
None
Hornbeam
Carpinus caroliniana
Fair
Yes
Yes
None
Black gum
Nyssa sylvatica
Fair
No
No
None
Sugar maple
Acer saccharum
Fair
No
No
None
White oak
Quercus alba
Fair
No
No
None
Norway maple
Acer platanoides
Fair
No
Yes
Invasive species
Black gum
Nyssa sylvatica
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
Yes
None
Norway maple
Acer platanoides
Fair
No
No
Invasive species
Red oak
Quercus rubra
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
White oak
Quercus alba
Fair
No
No
None
Sugar maple
Acer saccharum
Fair
No
No
None
Black cherry
Prunus serotina
Fair
No
No
None
Black cherry
Prunus serotina
Fair
No
No
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Black cherry
Prunus serotina
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
Black cherry
Prunus serotina
Fair
No
No
None
Black cherry
Prunus serotina
Fair
Yes
Yes
None
Norway maple
Acer platanoides
Fair
Yes
Yes
Invasive species
Red maple
Acer rubrum
Fair
Yes
Yes
None
Black cherry
Prunus serotina
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
Codominant at 3 feet; 18 and 17 inches
Black birch
Betula lenta
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Red maple
Acer rubrum
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Flowering dogwood
Cornus florida
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Black cherry
Prunus serotina
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Red maple
Acer rubrum
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
No
Yes
None
Black cherry
Prunus serotina
Fair
No
No
None
Sugar maple
Acer saccharum
Fair
No
No
None
Black cherry
Prunus serotina
Fair
No
No
None
Black cherry
Prunus serotina
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Red maple
Acer rubrum
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Black cherry
Prunus serotina
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
White oak
Quercus alba
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
Yes
None
Black cherry
Prunus serotina
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Flowering dogwood
Cornus florida
Fair
Yes
Yes
None
Black cherry
Prunus serotina
Fair
Yes
Yes
None
Norway maple
Acer platanoides
Fair
No
No
Invasive species. Removal an option
Sugar maple
Acer saccharum
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Norway maple
Acer platanoides
Fair
Yes
Yes
Invasive species
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Norway maple
Acer platanoides
Fair
No
Yes
Invasive species
Black birch
Betula lenta
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
No
No
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Shagbark hickory
Carya ovata
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
No
No
None
Sugar maple
Acer saccharum
Fair
No
No
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Mockernut hickory
Carya tomentosa
Fair
Yes
Yes
None
Norway maple
Acer platanoides
Fair
Yes
Yes
Invasive species
Red maple
Acer rubrum
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Mockernut hickory
Carya tomentosa
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
Yes
None
Red oak
Quercus rubra
Fair
No
Yes
None
Red oak
Quercus rubra
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Norway maple
Acer platanoides
Fair
No
No
Invasive species
Mockernut hickory
Carya tomentosa
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
American elm
Ulmus americana
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
Norway maple
Acer platanoides
Fair
No
No
Invasive species
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Norway maple
Acer platanoides
Fair
No
No
Invasive species
Red oak
Quercus rubra
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
Yes
None
Red maple
Acer rubrum
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
Mockernut hickory
Carya tomentosa
Fair
No
No
None
Black cherry
Prunus serotina
Fair
No
Yes
None
Mockernut hickory
Carya tomentosa
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
No
Yes
Codominant at 3 feet. 22 and 18 inches
Red oak
Quercus rubra
Fair
No
No
None
Shagbark hickory
Carya ovata
Fair
No
No
None
Black cherry
Prunus serotina
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Norway maple
Acer platanoides
Fair
Yes
Yes
Invasive species
Ailanthus
Ailanthus altissima
Fair
Yes
Yes
Invasive species
Ailanthus
Ailanthus altissima
Fair
Yes
Yes
Invasive species
Red oak
Quercus rubra
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Black cherry
Prunus serotina
Fair
No
No
None
Bitternut hickory
Carya cordiformis
Fair
Yes
Yes
None
Bitternut hickory
Carya cordiformis
Fair
Yes
Yes
None
Bitternut hickory
Carya cordiformis
Fair
Yes
Yes
None
Bitternut hickory
Carya cordiformis
Fair
Yes
Yes
None
Black cherry
Prunus serotina
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Black cherry
Prunus serotina
Fair
No
No
None
Black cherry
Prunus serotina
Fair
No
Yes
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Bitternut hickory
Carya cordiformis
Fair
Yes
Yes
None
Bitternut hickory
Carya cordiformis
Fair
Yes
Yes
None
Bitternut hickory
Carya cordiformis
Fair
Yes
Yes
None
Black oak
Quercus velutina
Fair
Yes
Yes
None
Black cherry
Prunus serotina
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
Black birch
Betula lenta
Fair
No
Yes
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Black cherry
Prunus serotina
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Black cherry
Prunus serotina
Fair
Yes
Yes
None
Bitternut hickory
Carya cordiformis
Fair
Yes
Yes
None
White oak
Quercus alba
Fair
Yes
Yes
None
Bitternut hickory
Carya cordiformis
Fair
No
No
None
Black cherry
Prunus serotina
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
Yes
None
Black oak
Quercus velutina
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Red maple
Acer rubrum
Fair
Yes
Yes
None
Red maple
Acer rubrum
Fair
Yes
Yes
None
Red maple
Acer rubrum
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
Yes
None
Red maple
Acer rubrum
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
Red maple
Acer rubrum
Fair
Yes
Yes
None
Red maple
Acer rubrum
Fair
Yes
Yes
None
Red maple
Acer rubrum
Fair
Yes
Yes
None
Black cherry
Prunus serotina
Fair
Yes
Yes
None
Red maple
Acer rubrum
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Red maple
Acer rubrum
Fair
No
No
None
Bitternut hickory
Carya cordiformis
Fair
No
Yes
None
Mockernut hickory
Carya tomentosa
Fair
No
No
None
Mockernut hickory
Carya tomentosa
Fair
No
No
None
Mockernut hickory
Carya tomentosa
Fair
No
No
None
Red maple
Acer rubrum
Fair
Yes
Yes
None
Sycamore maple
Acer pseudoplatanus
Fair
Yes
Yes
Invasive species
Black cherry
Prunus serotina
Fair
Yes
Yes
Codominant at base. 18 and 12 inches
Bitternut hickory
Carya cordiformis
Fair
No
No
None
Mockernut hickory
Carya tomentosa
Fair
No
No
None
Mockernut hickory
Carya tomentosa
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
Yes
None
Bitternut hickory
Carya cordiformis
Fair
No
No
None
Ailanthus
Ailanthus altissima
Fair
No
No
Invasive species
Mockernut hickory
Carya tomentosa
Fair
Yes
Yes
None
Mockernut hickory
Carya tomentosa
Fair
Yes
Yes
None
Mockernut hickory
Carya tomentosa
Fair
No
No
None
Mockernut hickory
Carya tomentosa
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
Yes
None
Mockernut hickory
Carya tomentosa
Fair
Yes
Yes
None
Bitternut hickory
Carya cordiformis
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Bitternut hickory
Carya cordiformis
Fair
Yes
Yes
None
Bitternut hickory
Carya cordiformis
Fair
Yes
Yes
None
Bitternut hickory
Carya cordiformis
Fair
Yes
Yes
None
Bitternut hickory
Carya cordiformis
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
No
Yes
None
Norway maple
Acer platanoides
Fair
Yes
Yes
Invasive species
Black birch
Betula lenta
Fair
No
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Mockernut hickory
Carya tomentosa
Fair
Yes
Yes
None
Mockernut hickory
Carya tomentosa
Fair
No
Yes
None
Bitternut hickory
Carya cordiformis
Fair
Yes
Yes
None
Red maple
Acer rubrum
Fair
No
No
None
Sugar maple
Acer saccharum
Fair
No
No
None
White oak
Quercus alba
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Sugar maple
Acer saccharum
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Bitternut hickory
Carya cordiformis
Fair
No
No
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
No
No
None
Hophornbeam
Ostrya virginiana
Fair
No
No
None
Sugar maple
Acer saccharum
Fair
No
No
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Sugar maple
Acer saccharum
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
White oak
Quercus alba
Fair
No
No
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Norway maple
Acer platanoides
Fair
Yes
Yes
Invasive species
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
No
No
None
Norway maple
Acer platanoides
Fair
Yes
Yes
Invasive species
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Shadbush
Amelanchier canadensis
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
No
No
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
No
No
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
No
No
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
No
No
None
Norway maple
Acer platanoides
Fair
No
No
Invasive species
Norway maple
Acer platanoides
Fair
No
No
Invasive species
Hornbeam
Carpinus caroliniana
Fair
No
No
None
Hornbeam
Carpinus caroliniana
Fair
Yes
Yes
None
Hornbeam
Carpinus caroliniana
Fair
Yes
Yes
None
Hornbeam
Carpinus caroliniana
Fair
No
No
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
Yes
Yes
None
Hornbeam
Carpinus caroliniana
Fair
Yes
Yes
None
Black cherry
Prunus serotina
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black cherry
Prunus serotina
Fair
No
No
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black cherry
Prunus serotina
Fair
No
Yes
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Red oak
Quercus rubra
Fair
Yes
Yes
None
Hornbeam
Carpinus caroliniana
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Norway maple
Acer platanoides
Fair
No
No
Invasive species
Black birch
Betula lenta
Fair
Yes
Yes
None
Red maple
Acer rubrum
Fair
Yes
Yes
None
Buckthorn
Rhamnus spp
Fair
No
No
Invasive species
Black birch
Betula lenta
Fair
Yes
Yes
None
Flowering dogwood
Cornus florida
Fair
No
No
None
Japanese falsecypress
Chamaecyparis pisifera
Fair
Yes
Yes
None
Japanese falsecypress
Chamaecyparis pisifera
Fair
Yes
Yes
None
Black cherry
Prunus serotina
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
Black gum
Nyssa sylvatica
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
Red maple
Acer rubrum
Fair
No
No
None
Flowering dogwood
Cornus florida
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Sugar maple
Acer saccharum
Fair
No
No
None
Black birch
Betula lenta
Fair
Yes
Yes
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Hophornbeam
Ostrya virginiana
Fair
No
No
None
Red oak
Quercus rubra
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Black birch
Betula lenta
Fair
No
No
None
Norway maple
Acer platanoides
Fair
Yes
Yes
Invasive species
Red oak
Quercus rubra
Fair
No
No
None
Japanese falsecypress
Chamaecyparis pisifera
Good
Yes
Yes
None
Hornbeam
Carpinus caroliniana
Good
Yes
Yes
None
Shagbark hickory
Carya ovata
Good
No
No
None
Bitternut hickory
Carya cordiformis
Good
Yes
Yes
None
Black birch
Betula lenta
Poor
Yes
Yes
Codominant at 4 feet. Basal decay. Should be removed
based on condition
Black birch
Betula lenta
Poor
No
Yes
Significant basal decay. Should be removed based on
condition
Black birch
Betula lenta
Poor
Yes
Yes
Leans. Significant basal decay. Tree should be removed
based on condition
White ash
Fraxinus americana
Poor
No
Yes
Emerald ash borer infested. Remove due to condition
Black birch
Betula lenta
Poor
Yes
Yes
Basal decay. One lead failed with decay. Remove based on
condition
Black birch
Betula lenta
Poor
Yes
Yes
Significant basal decay. Little canopy remains. Remove
based on condition
Black cherry
Prunus serotina
Poor
Yes
Yes
Remove based on condition
Red oak
Quercus rubra
Poor
Yes
Yes
Very little canopy remains. Remove based on condition
White ash
Fraxinus americana
Poor
Yes
Yes
Emerald ash borer infested. Remove based on condition
Flowering dogwood
Cornus florida
Poor
Yes
Yes
None
Black cherry
Prunus serotina
Poor
Yes
Yes
None
Black cherry
Prunus serotina
Poor
No
Yes
Significant basal decay. Remove based on condition
Red maple
Acer rubrum
Poor
Yes
Yes
Little foliage remains. Remove based on condition
Black birch
Betula lenta
Poor
Yes
Yes
Significant basal decay. Remove based on condition
Black birch
Betula lenta
Poor
Yes
Yes
Codominant at base. One lead dead. Remove based on
condition
Black birch
Betula lenta
Poor
Yes
Yes
Significant basal decay from prior lead failure. Remove
based on condition
Black birch
Betula lenta
Poor
Yes
Yes
Basal and trunk decay. Remove based on condition
Black birch
Betula lenta
Poor
Yes
Yes
Significant decay. Remove based on condition
Black birch
Betula lenta
Poor
Yes
Yes
Decay. Thin canopy. Remove based on condition
Black birch
Betula lenta
Poor
Yes
Yes
Significant basal decay. Almost dead. Remove based on
condition
8/30/2022 Eng. comments
21-22
PROJECT #
Town of Croton-on-Hudson
1/3/2023 WCHD comments
10/31/2023 Town comments
1/11/2024 Town comments
DATE:
SCALE:
Sheet
of
No.
Date
Comments:
Yorktown Heights, NY 10598
www.sitedesignconsultants.com
Fax: (914) 962-7386
Land Planners
Engineer:
NYS Lic. No. 64431
Joseph C. Riina, P.E.
251-F Underhill Avenue,
Civil Engineers
(914) 962-4488 -
EROSION AND
SEDIMENT
CONTROL
DETAILS
06/28/21
AS NOTED
CS
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW
COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
SILT FENCE DETAIL
NOT TO SCALE
E-1
WOOD OR METAL DRIVE
POSTS AT 8'-0" O.C. MAX.
ATTACH SILT FABRIC ON
UPHILL SIDE OF POSTS AND
BACKFILL OVER FABRIC
PROPEX SILT STOP FABRIC
OR APPROVED EQUAL
SOIL TO BE RETAINED
DIG 6"X6" TRENCH INSTALL
FABRIC AND BACKFILL
NATIVE SOIL
EXISTING AREA TO BE
PROTECTED
FLOW
FLOW
10' O.C. MAX.
36" MIN. FENCE
POSTS, DRIVEN MIN.
16" INTO GROUND
16" MIN. HEIGHT OF
FILTER ABOVE GROUND
6" MIN. EMBEDMENT
PERSPECTIVE VIEW
SECTION
FLOW
WOODEN FENCE POST
4 FT. LENGTH
SUPPORT NET
FILTER FABRIC
ANCHOR FABRIC 6" BELOW
EXISTING CHANNEL WHEN
CROSSING STREAM
CHANNEL
3'-0" MIN.
1'-0" MIN.
PLAN VIEW: JOINING SECTIONS
SECTION
POSTS FASTENED TOGETHER
EMBED FILTER
CLOTH MIN. 6"
INTO GROUND
FLOW
UNDISTURBED
GROUND
NOTES:
1.
Filter cloth to be fastened securely to post: steel either t or u type or 2" hardwood posts at top and mid section.
2.
When two sections of filter cloth adjoin each other they shall be overlapped by 6 inches and folded. Filter cloth
shall be mirafi 100x, stabilinka t140n or approved equal
3.
Maintenance shall be performed as needed and material removed when "bulges" develop in the silt fence.
4.
Excavate 4 inch trench along the lower perimeter of the site.
5.
Unroll a section at a time and position the post against the back (downstream) wall of the trench (net side away
from direction of flow).
6.
Drive the post into the ground until the netting is approximately 2 inches from the trench bottom.
7.
Lay the toe-in flap of fabric onto the undisturbed bottom of the trench, backfill the trench and tamp the soil.
Steeper slopes require an intercept trench.
8.
Join sections as shown above.
20" MIN.
16" MIN.
SYMBOL
SOIL STOCKPILE DETAIL
NOT TO SCALE
E-3
NOTES:
1.
Area chosen for stockpiling operations shall be dry and stable.
2.
Maximum slope of stockpile shall be 1:2.
3.
Upon completion of soil stockpiling, each pile shall be surrounded with either silt fencing or strawbales, then stabilized
with vegetation or covered.
4.
See detail for installation of silt fence.
STRAWBALES OR SILT FENCE
MIN. SLOPE
MIN. SLOPE
SLOPE OR LESS
STABILIZE ENTIRE PILE WITH
VEGETATION OR COVER
SYMBOL
SS
STABILIZED CONSTRUCTION ENTRANCE DETAIL
NOT TO SCALE
E-2
EXISTING GRADE
COMPACTED SUBGRADE
FILTER CLOTH
SECTION A-A
3" CLEAN STONE
MOUNTABLE BERM
(OPTIONAL SEE
NOTE 5)
10'-0" MINIMUM
WIDTH
6" MIN.
EXISTING PAVEMENT
10'-0"
30'-0" MINIMUM
EXISTING
PAVEMENT
10'-0"
12'-0" MINIMUM
10'-0"
MINIMUM
START AT EXIST.
PLAN
INSTALLATION NOTES:
1.
Stone size - use 3" min. Stone, or reclaimed or recycled concrete equivalent.
2.
Length - as required, but not less than 50 feet (except on a single residence lot where a 30 foot
minimum length would apply.
3.
Thickness - not less than six (6) inches.
4.
Width - 10 foot minimum, but not less than the full width at points where ingress or egress occur. 24 ft
if single entrance to site.
5.
Surface water - all surface water flowing or diverted toward construction entrances shall be piped
across the entrance. If piping is impractical, a mountable berm with 5:1 slopes will be permitted.
6.
Maintenance - the entrance shall be maintained in a condition which will prevent tracking or flowing of
sediment onto public right of way this may require periodic top dressing with additional stone as
conditions demand and repair and/or cleanouts of any measures used to trap sediment. All sediment
spilled, dropped, washed or tracked onto public right of way must be removed immediately.
7.
Washing - wheels shall be cleaned to remove sediment prior to entrance onto public right of way.
When washing is required, it shall be done on an area stabilized with stone and which drains into an
approved sediment trapping device.
8.
Periodic inspection and needed maintenance shall be provided after each rain
A
A
INLET PROTECTION DETAIL
E-4
INLET
3" WASHED GRAVEL
OVER INLET
3:1 SLOPE
2:1 SLOPE
PLAN
CONSTRUCTION
ENTRANCE GRAVEL
TEMPORARY SEDIMENT POOL
1 FT MIN
2 FT MAX
SUBGRADE
SYMBOL
SECTION
FILTER FABRIC OVER
INELT
INLET
NOT TO SCALE
INSP.
INSP.
INLET
PROTECTION
SILT FENCE
CLEAN/
REPLACE
REMOVE
INSP.
INSP.
REMOVE
REPLACE
CLEAN
DAILY
WEEKLY
MONTHLY
AFTER
RAINFALL
NECESSARY
TO MAINTAIN
FUNCTION
AFTER
APPROVAL
OF INSPECTOR
MAINTENANCE SCHEDULE:
GENERAL EROSION CONTROL NOTES:
1.
Contractor shall be responsible for compliance with all sediment and erosion control practices. The sediment and erosion control practices are to be
installed prior to any major soil disturbances, and maintained until permanent protection is established. Road surface flows from the site should be
dissipated with tracking pad or appropriate measures during adjacent road shoulder regrading. Contractor is responsible for the installation and
maintenance of all soil erosion and sedimentation control devices throughout the course of construction.
2.
Catch basin inlet protection must be installed and operating at all times until tributary areas have been stabilized. When possible flows should be
stabilized before reaching inlet protection structure. Timely maintenance of sediment control structures is the responsibility of the Contractor.
3.
All structures shall be maintained in good working order at all times. The sediment level in all sediment traps shall be closely monitored and sediment
removed promptly when maximum levels are reached or as ordered by the engineer. All sediment control structures shall be inspected on a regular
basis, and after each heavy rain to insure proper operation as designed. An inspection schedule shall be set forth prior to the start of construction.
4.
The locations and the installation times of the sediment capturing standards shall be as specified in these plans, as ordered by the Engineer, and in
accordance with the latest edition of the "New York Standards and Specifications for Erosion and Sediment Control" (NYSSESC).
5.
All topsoil shall be placed in a stabilized stockpile for reuse on the site. All stockpile material required for final grading and stored on site shall be
temporarily seeded and mulched within 7 days. Refer to soil stockpile details.
6.
Any disturbed areas that will be left exposed more than 7 days and not subject to construction traffic, shall immediately receive temporary seeding.
Mulch shall be used if the season prevents the establishment of a temporary cover. Disturbed areas shall not be limed and fertilized prior to temporary
seeding.
7.
All disturbed areas within 500 feet of an inhabited dwelling shall be wetted as necessary to provide dust control.
8.
The contractor shall keep the roadways within the project clear of soil and debris and is responsible for any street cleaning necessary during the
course of the project.
9.
Sediment and erosion control structures shall be removed and the area stabilized when the drainage area has been properly stabilized by permanent
measures.
10. All sediment and erosion control measures shall be installed in accordance with current edition of NYSSESC.
11. All regraded areas must be stabilized appropriately prior to any rock blasting, cutting, and/or filling of soils. Special care should be taken during
construction to insure stability during maintenance and integrity of control structures.
12. Any slopes graded at 3:1 or greater shall be stabilized with erosion blankets to be staked into place in accordance with the manufactures
requirements. Erosion blankets may also be required at the discretion of Town officials or Project Engineer. When stabilized blanket is utilized for
channel stabilization, place all of the volume of seed mix prior to laying net, or as recommended by the manufacturer.
13. To prevent heavy construction equipment and trucks from tracking soil off-site, construct a pervious crushed stone pad. Locate and construct pads
as detailed in these plans.
14. Contractor is responsible for controlling dust by sprinkling exposed soil areas periodically with water as required. Contractor to supply all equipment
and water.
15. Contractor shall be responsible for construction inspections as per NYSDEC GP-0-15-002 and Town of Cortlandt Code & Village of Croton on Hudson.
MAINTENANCE OF TEMPORARY EROSION AND SEDIMENT CONTROL STRUCTURES:
N.Y.S.D.E.C. GP-0-15-002 EXPOSURE RESTRICTIONS - States that any exposed earthwork shall be stabilized in accordance with the guidelines of this
plan.
1.
Trees and vegetation shall be protected at all times as shown on the detail drawing and as directed by the Engineer.
2.
Care should be taken so as not to channel concentrated runoff through the areas of construction activity on the site.
3.
Fill and site disturbances should not be created which causes water to pond off site or on adjacent properties.
4.
Runoff from land disturbances shall not be discharged or have the potential to discharge off site without first being intercepted by a control structure,
such as a sediment trap or silt fence. Sediment shall be removed before exceeding 50% of the retention structure's capacity.
5.
For finished grading, adequate grade shall be provided so that water will not pond on lawns for more than 24 hours after rainfall, except in swale flow
areas which may drain for as long as 48 hours after rainfall.
6.
All swales and other areas of concentrated flow shall be properly stabilized with temporary control measures to prevent erosion and sediment travel.
Surface flows over cut and fill areas shall be stabilized at all times.
7.
All sites shall be stabilized with erosion control materials within 7 days of final grading.
8.
Temporary sediment trapping devices shall be removed from the site within 30 days of final stabilization.
MAINTENANCE OF PERMANENT CONTROL STRUCTURES DURING CONSTRUCTION:
The stormwater management system and outlet structure shall be inspected on a regular basis and after every rainfall event. Sediment build up shall be
removed from the inlet protection regularly to insure detention capacity and proper drainage. Outlet structure shall be free of obstructions. All piping and drain
inlets shall be free of obstruction. Any sediment build up shall be removed.
MAINTENANCE OF CONTROLS AFTER CONSTRUCTION:
Controls (including respective outlet structures) should be inspected periodically for the first few months after construction and on an annual basis thereafter.
They should also be inspected after major storm events.
DEBRIS AND LITTER REMOVAL:
Twice a year, inspect outlet structure and drain inlets for accumulated debris. Also, remove any accumulations during each mowing operation.
STRUCTURAL REPAIR/REPLACEMENT:
Outlet structure must be inspected twice a year for evidence of structural damage and repaired immediately.
EROSION CONTROL:
Unstable areas tributary to the basin shall immediately be stabilized with vegetation or other appropriate erosion control measures.
SEDIMENT REMOVAL:
Sediment should be removed after it has reached a maximum depth of five inches above the stormwater management system floor.
TOPSOIL:
Existing topsoil will be removed and stored in piles sufficiently as to avoid mixing with other excavation.
Stockpiles shall be surrounded by erosion control as outlined on these plans. The furnishing of new topsoil
shall be of a better or equal to the following criteria (SS713.01 NYSDOT):
1.
The pH of the material shall be 5.5 to 7.6.
2.
The organic content shall not be less than 2% or more than 70%.
3.
Gradation: SIEVE SIZE
% PASSING BY WGT.
2 INCH
1 INCH
85 TO 100
1/4 INCH
65 TO 100
NO. 200 MESH
20 TO 80
PERMANENT VEGETATIVE COVER:
1.
Site preparation:
1.1.
Install erosion control measures.
1.2.
Scarify compacted soil areas.
1.3.
Lime as required to ph 6.5.
1.4.
Fertilize with 10-6-4 4 lbs/1,000 S.F.
1.5.
Incorporate amendments into soil with disc harrow.
2.
Seed mixtures for use on swales and cut and fill areas.
MIXTURE
LBS./ACRE
ALT. A
KENTUCKY BLUE GRASS
CREEPING RED FESCUE
RYE GRASS OR REDTOP
ALT. B
CREEPING RED FESCUE
REDTOP
TALL FESCUE/SMOOTH BLOOMGRASS
3.
SEEDING
3.1.
Prepare seed bed by raking to remove stones, twigs, roots and other foreign material.
3.2.
Apply soil amendments and integrate into soil.
3.3.
Apply seed uniformly by cyclone seeder culti-packer or hydro-seeder at rate indicated.
3.4.
Stabilize seeded areas in drainage swales.
3.5.
Irrigate to fully saturate soil layer, but not to dislodge planting soil.
3.6.
Seed between April 1st and May 15th or August 15th and October 15th.
3.7.
Seeding may occur May 15th and August 15th if adequate irrigation is provided.
TEMPORARY VEGETATIVE COVER:
SITE PREPARATION:
1.
Install erosion control measures.
2.
Scarify areas of compacted soil.
3.
Fertilize with 10-10-10 at 400/acre.
4.
Lime as required to ph 6.5.
SEED SPECIES:
MIXTURE
LBS./ACRE
Rapidly germinating annual ryegrass
(or approved equal)
Perennial ryegrass
Cereal oats
SEEDING:
Same as permanent vegetative cover
CONTRACTOR CERTIFICATION STATEMENT
Certification Statement - All contractors and subcontractors as identified in a SWPPP, by the Owner or
Operator, in accordance with Part III.A.5 of the SPDES General Permit for Stormwater Runoff from
Construction Activity, GP-0-15-002, dated January 29, 2015, Page 10 of 40, shall sign a copy of the
following Certification Statement before undertaking any construction activity at the Site identified in the
SWPPP:
"I hereby certify that I understand and agree to comply with the terms and conditions of the SWPPP and
agree to implement any corrective actions identified by the Qualified Inspector during a site inspection. I also
understand that the Owner or Operator must comply with the terms and conditions of the New York State
Pollutant Discharge Elimination System ("SPDES") General Permit for Stormwater Discharge from
Construction Activities and that it is unlawful for any person to cause or contribute to a violation of water
quality standards. Furthermore, I understand that certifying false, incorrect or inaccurate information is a
violation of the referenced permit and the laws of the State of New York and could subject me to criminal,
civil and/or administrative proceedings."
Individual Contractor:
Name and Title (please print):
Signature of Contractor:
Company / Contracting Firm:
Name of Company:
Address of Company:
Telephone Number / Cell Number:
Site Information:
Address of Site:
Today's Date:
OWNER / OPERATOR CERTIFICATION
Name (please print):
Title:
Date:
Phone:
E-mail:
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered and
evaluated the information submitted. Based on my inquiry of the person or persons who manage the system,
or those persons directly responsible for gathering the information, the information submitted is, to the best of
my knowledge and belief, true, accurate, and complete. Further, I hereby certify that the SWPPP meets all
Federal, State, and local erosion and sediment control requirements. I am aware that false statements made
herein are punishable as a Class A misdemeanor pursuant to Section 210.45 of the Penal Law."
INSP.
CONSTRUCTION SEQUENCE:
Refer to the Plan Set for all plans and details which relate to Construction Sequence.
1.
Prior to the beginning of any site work the major features of the construction must be field staked by a licensed surveyor. These include the
building, limits of disturbance, utility lines, and stormwater practices.
2.
Prior to the start of the project, an on-site pre-construction meeting will be held. this will be attended by the project owner, the operator
responsible for complying with the approved construction drawings including the erosion and sediment control (E&SC) plan and details, the
design engineer, the engineer responsible for E&SC monitoring during construction, and town representatives from the engineering department
and code enforcement.
3.
A licensed surveyor must define infrastructure locations, limits of disturbance, stormwater basin limits, and grades in the field prior to start of
any construction. Limits of disturbance shall be marked with the installation of construction fence or approved equal. The extents of the
stormwater management system shall be cordoned off to minimize the disturbance on this area.
4.
Install all perimeter erosion control measures, construction entrance as shown on the Erosion and Sediment Control Plan and the associated
Details. Install silt fencing at the bottom of slopes. The standards established in Part 1.B 1.b of the GP-015-002 included in appendix B of this
SWPPP must be adhered to.
5.
Strip site, clear vegetation, and place topsoil in stockpile locations shown on the plan.
6.
Begin rough grading the site. Contractor to limit exposure of denuded soils by providing temporary stabilization for work areas that will remain
undisturbed for over seven (7) days. Chipped rock that is not suitable to remain on site shall be hauled away and properly disposed of. An area
has been provided for the stockpiling of removed soil and rock which is to be removed from the site.
7.
Begin grading of driveway. The sections of driveway started at the beginning of the work day must be paved and completed by the end of the
day.
8.
Rough grade building.
9.
Begin construction of building.
10. Begin the excavation and installation of the drainage and stormwater management system. Protect trenches and open excavations from
erosion. Entry into the system shall be blocked off until site has reached final stabilization. Once system has been installed, backfill, seed where
necessary, and reinstall measures to cordon off the system from disturbance.
11. During site construction maintain and re-establish as required erosion control and stabilization measures as required by the site plan and
details.
12. Excavate to the sub-grade level. Scarify the existing soil to a depth of 12-inches by rototilling or other means acceptable to the Engineer. Install
all courses of stone as per the specifications given on the Plan.
13. Install base course of Item 4 in all pavement areas. Stabilize all open areas with seed and mulch.
14.
Construct remainder of building, driveway and parking areas. First install curbs, asphalt binder, and concrete sidewalk. Once binder course is
installed, drainage outlet may be unblocked.
15. Backfill curbs, grade, place final soil topping and put in place permanent vegetative cover over all disturbed areas, landscape beds, slopes, etc.
16.
Once site stabilization has taken place (An area shall be considered to have achieved final stabilization when it has a minimum uniform 80%
perennial vegetative cover or other permanent non-vegetative cover with a density sufficient to resist accelerated surface erosion and
subsurface characteristics sufficient to resist sliding and other movements), remove all temporary erosion and sediment controls, unplug the
drainage system to allow runoff to enter the stormwater management system.
Winter Stabilization Notes:
If construction activities are expected to extend into or occur during the winter season the contractor shall anticipate proper stabilization and
sequencing. Construction shall be sequenced such that wherever possible areas of disturbance that can be completed and permanently stabilized
shall be done by applying and establishing permanent vegetative cover before the first frost. Areas subject to temporary disturbance that will not be
worked for an extended period of time shall be treated with temporary seed, mulch, and/or erosion blankets.
PREPARED FOR
SITE PLAN
Westchester County, NY
0 ALBANY POST ROAD
PROJECT LOCATION
THOMAS HANNIGAN JR
CHECK DAM DETAIL
NOT TO SCALE
E-5
CONSTRUCTION SPECIFICATIONS:
1.
Stones will be placed on a filter fabric foundation to the lines, grades and
locations shown in the plan.
2.
Set spacing of check dams to ensure that the elevations of the crest of the
downstream dam is the same elevation of the toe of the upstream dam.
3.
Extend the stone a minimum of 1.5 ft. Beyond the ditch banks to prevent cutting
around the dam.
4.
Protect the channel downstream of the lowest check dam from scour and
erosion with stone or liner as appropriate.
5.
Ensure that channel appurtenances such as culvert entrances below check
dams are not subject to damage or blockage from displaced stones.
TOP BANK OF SWALE
TOE
SAME ELEVATION
A
A
CREST
B
PROFILE
FILTER
FABRIC
9" MIN.
1.5'
MIN.
B
SECTION A-A
SECTION B-B
FILTER
FABRIC
24" MAX @
CENTER
SYMBOL
SPACING VARIES DEPENDING
ON CHANNEL SLOPE
8/30/2022 Eng. comments
21-22
PROJECT #
Town of Croton-on-Hudson
1/3/2023 WCHD comments
10/31/2023 Town comments
1/11/2024 Town comments
ELEVATION (FT)
DISTANCE ALONG BASELINE (FT)
PROP. DRIVEWAY
VERT. SCALE: 1" = 6
HORIZ. SCALE: 1" = 30
0+00
470.4
470.44
0+50
474.5
474.55
1+00
479.1
479.13
1+50
481.4
481.39
2+00
487.7
487.71
2+50
491.3
491.32
3+00
494.8
494.81
3+50
498.7
498.72
4+00
511.0
510.97
4+50
524.7
524.68
5+00
526.6
526.56
5+50
527.3
527.35
6+00
526.8
526.84
6+50
530.7
530.68
7+00
536.8
536.83
7+50
542.7
542.72
8+00
547.9
547.88
8+50
551.4
551.44
9+00
555.1
555.08
9+50
559.2
559.22
10+00
564.0
564.01
10+50
570.0
570.00
11+00
579.1
579.11
11+50
584.2
584.19
12+00
586.3
586.30
12+35.28
586.4
586.44
2.8%
10.0%
1.8%
GRADE BREAK STA = 0+00.00
ELEV = 470.44
GRADE BREAK STA = 11+33.32
ELEV = 581.56
GRADE BREAK STA = 12+35.28
ELEV = 583.35
DATE:
SCALE:
Sheet
of
No.
Date
Comments:
Yorktown Heights, NY 10598
www.sitedesignconsultants.com
Fax: (914) 962-7386
Land Planners
Engineer:
NYS Lic. No. 64431
Joseph C. Riina, P.E.
251-F Underhill Avenue,
Civil Engineers
(914) 962-4488 -
EROSION &
SEDIMENT
CONTROL AND
SITE PLAN
DETAILS
06/28/21
AS NOTED
CS
COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
PREPARED FOR
SITE PLAN
Westchester County, NY
0 ALBANY POST ROAD
PROJECT LOCATION
THOMAS HANNIGAN JR
Drawing Not To Scale
Disclaimer:
The information presented herein is general design information only. For specific applications,
consult an independent professional for further design guidance.
A
B
C
A
B
C
CRITICAL POINTS
A. Overlaps and Seams
B. Projected Water Line
C. Channel Bottom/Side Slope Vertices
Load Bearing
Plate
Tendon
Anchor Head
(Load-Locked
Position)
Embedment
(As Designed)
NOTES:
* The performance of ground anchoring devices is highly
dependent on numerous site/project specific variables. It is the
sole responsibility of the project engineer and/or contractor to
select the appropriate anchor type and length. Anchoring shall be
selected to hold the mat in intimate contact with the soil subgrade
and resist pullout in accordance with the project's design intent.
* Anchor Pattern Guide can vary based on earth anchor and
blanket selection.
* If desired, the system can be soil-filled and sodded after TRM
installation. Sod should be staples/staked according to plan
specifications.
Earth Anchor
Detail
2"-5"
(5-12.5cm)
3.3'
(1m)
6'
(1.8m)
3'
(0.9m)
4'
(1.2m)
1.6'
(0.5m)
2'
(0.6m)
0.7 Anchors per SQ.YD.
(0.8 Anchors per SQ. M.)
A
B
C
D
2"-5"
(5-12.5cm)
2"-5"
(5-12.5cm)
2"-5"
(5-12.5cm)
2"-5"
(5-12.5cm)
6'
(1.8m)
3.3'
(1m)
3.3'
(1m)
3'
(0.9m)
3.3'
(1m)
3.3'
(1m)
1.6'
(0.5m)
3'
(0.9m)
1.5'(0.45m)
2"-5"
(5-12.5cm)
2"-5"
(5-12.5cm)
2"-5"
(5-12.5cm)
1.15 Anchors per SQ.YD.
(1.35 Anchors per SQ. M.)
1.7 Anchors per SQ.YD.
(2.0 Anchors per SQ. M.)
2.3 Anchors per SQ.YD.
(2.7 Anchors per SQ. M.)
Steep Slopes
Shallow Slopes
Channel & Shoreline
Slopes
2:1
3:1
1.6'
(0.5m)
0.7 Anchors/SQ.YD.(0.8 Anchors/SQ. M.)
1.15 Anchors/SQ.YD.(1.35 Anchors/SQ. M.)
1.7 Anchors/SQ.YD.(2.0 Anchors/SQ. M.)
2.3 Anchors/SQ.YD.(2.7 Anchors/SQ. M.)
1:1
Drawn on: 01-28-13
5401 St. Wendel - Cynthiana Rd.
Poseyville, IN 47633
PH: 800-772-2040
www.tensarnagreen.com
SLOPE
INSTALLATION
EARTH ANCHOR
(EA) DETAIL
*NOTE:
In loose soil conditions, the use of
staple or stake lengths greater than
6"(15cm) may be necessary to
properly secure the HP-TRMs.
1. Prepare soil before installing
high-performance turf reinforcement
mats (HP-TRMs), including any
necessary application of lime,
fertilizer, and seed.
2. Begin at the top of the slope by
anchoring the HP-TRMs in a 6” (15
cm) deep x 6” (15cm) wide trench
with approximately 12” (30 cm) of
HP-TRMs extended beyond the
up-slope portion of the trench.
Anchor the HP-TRMs with a row of
staples and anchors approximately
12” (30 cm) apart in the bottom of
the trench. Backfill and compact
the trench after stapling. Apply
seed to compacted soil and fold
remaining 12” (30 cm) portion of
HP-TRMs back over seed and
compacted soil. Secure HP-TRMs
over compacted soil with a row of
staples/stakes spaced
approximately 12" (30 cm) apart
across the width of the HP-TRMs.
3. Roll the HP-TRMs (A) down or (B)
horizontally across the slope.
HP-TRMs will unroll with
appropriate side against the soil
surface. All HP-TRMs must be
securely fastened to soil surface by
placing staples/stakes in
appropriate locations as shown in
the staple pattern guide.
4. The edges of parallel HP-TRMs
must be stapled with approximately
2" - 5" (5-12.5cm) overlap
depending on the HP-TRM type.
5. Consecutive HP-TRMs spliced
down the slope must be end over
end (Shingle style) with an
approximate 3"(7.5cm) overlap.
Staple through overlapped area,
approximately 12"(30cm) apart
across entire HP-TRM width.
SLOPE
INSTALLATION
EARTH ANCHOR
(EA) DETAIL
Drawing Not To Scale
3B
3A
*NOTE:
In loose soil conditions, the use of
staple or stake lengths greater than
6"(15cm) may be necessary to
properly secure the HP-TRMs.
30"(76.2cm)
12"
(30cm)
12"
(30cm)
4"
(10 cm)
Earth
Anchor
Earth
Anchor
Staples/Stakes
Drawn on: 01-28-13
5401 St. Wendel - Cynthiana Rd.
Poseyville, IN 47633
PH: 800-772-2040
www.tensarnagreen.com
1. Prepare soil before installing
high-performance turf reinforcement
mats (HP-TRMs), including any
necessary application of lime,
fertilizer, and seed.
2. Begin at the top of the slope by
anchoring the HP-TRMs in a 12” (30
cm) deep x 12” (30cm) wide trench
with approximately 30” (76.2 cm) of
HP-TRMs extended beyond the
up-slope portion of the trench.
Anchor the HP-TRMs with an
alternating row of staples and
anchors approximately 30” (76.2 cm)
apart in the bottom of the trench.
Backfill and compact the trench after
stapling. Fold remaining 30” (76.2
cm) portion of HP-TRMs back over
compacted soil. Secure HP-TRMs
over compacted soil with an
alternating row of staples/anchors
spaced approximately 18" (45 cm)
apart across the width of the
HP-TRMs.
3. Roll the HP-TRMs (A) down or (B)
horizontally across the slope.
HP-TRMs will unroll with appropriate
side against the soil surface. All
HP-TRMs must be securely fastened
to soil surface by placing
staples/anchors in appropriate
locations as shown in the staple
pattern guide.
4. The edges of parallel HP-TRMs must
be stapled between earth anchors
with approximately 4" (10 cm) overlap
depending on the HP-TRM type. For
curved sections, adjust the overlap
edges of parallel HP-TRMs
accordingly with a minimum of 4" (10
cm) overlap to accommodate
transitional segments.
E-6
EROSION BLANKET DETAIL
NOT TO SCALE
R-1
HOUSE DRIVEWAY DETAIL
NOT TO SCALE
2-1/2" ASPHALT CONCRETE TOP COURSE
N.Y.S. ITEM NO. 403.16
6" COMPACTED N.Y.S. D.O.T. ITEM NO.
304.05
2' SHOULDER
4" ASPHALT
CURB
2% SLOPE
12'
MIN.
8/30/2022 Eng. comments
21-22
PROJECT #
STORM DRAIN MANHOLE DETAIL
NOT TO SCALE
D-1
DRAIN
PLAN
24" Ø
2'-0"
4'-0" MIN.
(SEE NOTE 3)
SECTION
3/4" CRUSHED STONE
3'-0"
NOTES:
1.
All pipes must be cut flush with inside walls.
2.
Drain manhole shall be precast as manufactured by Fort Miller, or approved equal.
3.
Where depth of manhole exceeds 10 ft, inside diameter shall be 60".
4.
Manhole covers and structures shall meet or exceed A.S.T.M. and O.S.H.A. requirements.
5.
Pre-cast sections shall be in accordance with "Pre-cast Reinforced Manhole Sections", A.S.T.M. designation C-478,
latest revision. Minimum compressive strength shall be 4000 psi. Structures shall be rated for h-20 vehicle loading.
CAST IRON FRAME AND COVER
MANUFACTURED BY CAMPBELL FOUNDRY
MODEL NO.1203 OR APPROVED EQUAL
CAST IRON OR
POLYPROPYLENE COATED
STEEL STEPS AT 12" O.C.
MANHOLES SHALL BE SET
WITH NO SUMP
8" CONCRETE WALLS
ECCENTRIC CONE
4000 P.S.I. CONCRETE
MORTAR SETTING
W/ ONE BRICK
LEVELING COURSE
SET FLUSH WITH PAVEMENT
FINISHED GRADE
OUT
IN
Town of Croton-on-Hudson
1/3/2023 WCHD comments
10/31/2023 Town comments
R-2
4"
6" REVEAL
8"
6"
10"
8"
4"
BELGIUM CURB DETAIL
MIN. 4" TOP SOIL AND SEED
BELGIUM BLOCK CURBING (10"
DEEP x 7" LONG x 4" WIDE)
FINISHED PAVEMENT
2" TOP COURSE
4" BINDER COURSE
8" ITEM 4 SUBBASE
APPROVED COMPACTED
SUBGRADE
CLASS A CONCRETE
FOUNDATION (3,500 PSI)
NOTE:
1.
Joints shall be 3/4" or less and fully
mortared with 1:2 cement mortar,
and cleaned of excess mortar
4" COMPACT N.Y.S.D.O.T.
ITEM 304.05 BASE
APPROXIMATE 1"
TO 1-1/2" BEDDING
SAND OR STONE
DUST
BRICK PAVER
6" MIN.
EMERGENCY ACCESS ROAD DETAIL
R-4
NOT TO SCALE
COMPACTED SOIL
AT PERIMETER
APPROXIMATE 1"
TO 1-1/2" BEDDING
SAND
GEOTEXTILE AS
REQUIRED TURN
UP AT SIDES
COMPACT N.Y.S.D.O.T. ITEM 304.05
8" MIN. THICKNESS
COMPACT SOIL SUBGRADE
CONCRETE GRID PAVER 3-1/8" MIN.
THICKNESS AS MANUFACTURED BY
ANCHOR CONCRETE PRODUCTS OR
APPROVED EQUAL
SOD PLUGS OR GRASS SEED
TOPSOIL IN OPENINGS FILL
1/2" BELOW SURFACE
SECTION
1/11/2024 Town comments
EMERGENCY ACCESS ROAD DETAIL
R-3
NOT TO SCALE
ELEVATION (FT)
DISTANCE ALONG BASELINE (FT)
Septic Profile
VERT. SCALE: 1" = 6
HORIZ. SCALE: 1" = 30
HOUSE SEWER
INV. OUT = 584.05'
SEPTIC TANK
INV. IN = 583.84'
INV. OUT = 583.59'
TRENCH 1 INV. IN = 562.70'
TRENCH 2 INV. IN = 562.50'
EXP. TRENCH 1 INV. IN = 561.76'
EXP. TRENCH 2 INV. IN = 561.06'
0+00
586.1
0+50
584.9
1+00
581.5
1+50
573.9
2+00
564.4
2+50
561.1
560.82
2+51.16
560.9
560.73
2.7%
3.4%
11.6%
11.7%
7.7%
GRADE BREAK STA = 2+18.47
ELEV = 564.43
GRADE BREAK STA = 2+49.85
ELEV = 561.97
4" DIA. SDR 35 PVC PIPE
L = 10 FT; S = 2% MIN
PROPOSED GRADE
1,000 GAL. P/C CONC.
SEPTIC TANK
4" PVC PIPE L = 124 FT; S = 14.9% MIN
24" WIDE SEPTIC TRENCH 6" O.C. WITH 4"
PERFORATED PIPE. TOTAL LENGTH = 188 FT
EXISTING GRADE
FUTURE 24" WIDE EXPANSION SEPTIC
TRENCH 6" O.C. W/ 4" PERFORATED
PIPE (TYP.)
PROPOSED CLEANOUT
4" PVC PIPE L = 79 FT; S = 2.5%
N 78° 32' 10" W
S 80° 29' 10" E
46.41'
S 79° 50' 00" E
57.91'
S 62° 43' 30" E
56.74'
S 58° 44' 20" E
64.46'
S 59° 29' 10" E
33.89'
S 62° 28' 00" E
22.00'
S 60° 11' 00" E
98.98'
S 56° 32' 00" E
38.07'
N 70° 33' 00" E
341.27
225.18'
S 39° 30' 00" W
38.39'
S 41° 00' 10" W
50.11'
S 42° 13' 40" W
152.32'
S 39° 53' 40" W
74.29'
S 42° 35' 00" W
66.86'
S 43° 46' 00" W
90.27'
S 43° 55' 40" W
96.58'
N 48° 12' 20" W
189.42'
N 51° 14' 20" W
31.15'
N 35° 08' 00" W
576.36'
N 39° 34' 40" E
32.77'
N 50° 14' 20" E
77.45'
N 77° 00' 40" W
67.06'
N 45° 00' 00" W
50.00'
S 70° 00' 00" W
52.92'
32.00'
N 78° 32' 10" W
28.21'
230.75'
54.81'
35.64'
30'
S 58° 50' 10" W
100.35'
S 63° 3
123.28'
S 62° 06' 30" W
50.00'
N 54° 27' 00" E
102.19'
N 58° 20' 50" E
98.48'
S 89° 27' 00" E
6.25'
N 46° 35' 00" E
14.58'
N 57° 11' 50" E
298.62'
S 78° 32' 10" E
262.75'
S 60° 11' 00" E
S 77° 00' 40" E
TOWN OF CORTLANDT
VILLAGE OF
CROTON-ON-HUDSON
PT#6
DT#6
PT#4
DT#4
PT#5
DT#5
TP-3
IT-3
TP-4
IT-4
VILLAGE OF CROTON-ON HUDSON
VILLAGE OF CROTON-ON HUDSON
TOWN OF CORTLANDT
TOWN OF CORTLANDT
W
47'
47'
47'
47'
47'
47'
47'
47'
C
C
3128 3126
DATE:
SCALE:
Sheet
of
No.
Date
Comments:
Yorktown Heights, NY 10598
www.sitedesignconsultants.com
Fax: (914) 962-7386
Land Planners
Engineer:
NYS Lic. No. 64431
Joseph C. Riina, P.E.
251-F Underhill Avenue,
Civil Engineers
(914) 962-4488 -
SEPTIC SYSTEM
SITE PLAN AND
DETAILS
06/28/21
AS NOTED
CS
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW
COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
PERFORATED PIPE TRENCH DETAIL
NOT TO SCALE
S-5
FOR SLOPING GROUND
TYPICAL FILL SECTION
NOT TO SCALE
LP
IMPERVIOUS MATERIAL
(CLAY)
12" MIN. THICKNESS
IMPERVIOUS LAYER
OF CLAY
3:1 MAX.
6" SOIL COVER
ROCK OR WATER
10' MIN.
12"MIN
B.O.H. APPROVED RUN-OF-BANK FILL
(SEE SCHEDULE FOR DEPTH OF FILL).
ALL PIPES TO BE LAID IN A 6" BED OF
3/4" TO 1-1/2" WASHED STONE OR
GRAVEL
ORIGINAL GROUND
10'MIN.
6'
6'
10'
NOTE:
1.
Restrictive measurements are to be taken from the toe of slope.
5' MIN.
S-6
12" MIN
12" MIN
S-1
NOT TO SCALE
JUNCTION BOX DETAIL
REMOVABLE
COVER
NOTES:
1.
Bottom of junction box must be level and firmly supported below frost line.
2. Junction box footing shall extend to 36" below ground level.
3. Junction boxes shall be placed on single branch distributors.
4. Junction boxes shall be constructed of waterproofed masonry construction.
5. Tight joint pipe shall be used between the septic tank and junction box and
between all junction boxes and laterals.
4. All pipes connecting to the junction box shall be cut flush with the inside wall.
5. Maximum cover above junction boxes shall be 12 inches.
6. The clear inside dimension of junction boxes shall be a minimum of 12" x 12".
7.
All pipes shall be cut flush with inside of junction box.
PLAN
OUTLET
PER PLAN
INLET
OUTLET
PER PLAN
5"
REMOVABLE
COVER
FINISHED
GRADE
ELEVATION
12" SAND/PEA GRAVEL BASE
2"-4" MIN.
OUTLET
PER PLAN
3"
2"
2" MIN
S-3
12"
3"
48"
56"
67"
120"
60"
1,250 Gal.
12"
1" TAPER
3"
A
A
A
7"
B
55"
67"
1,000 Gal.
58"
102"
D
A
B
10"
C
48"
3"
D
18" MIN
E
F
C
F
67"
3"
12"
1,500 Gal.
65"
126"
56"
48"
E
G
H
G
H
5"
5"
5"
4"
LIQUID
CAPACITY
INLET
BAFFLE
OUTLET
BAFFLE
DUAL
COMPARTMENT
BAFFLE
NOTES:
1.
The minimum required fill cover above the septic tank shall be 6 to 12 inches with a maximum cover depth of 24 inches. When required fill
cover exceeds 24 inches, manhole extensions with steel frames and covers shall be installed and extended to finished grade. If the septic
tank is rated for H-20 vehicle loading, the manholes, frames and covers shall be H-20 rated also.
2.
The dual compartment baffle is required on all septic tanks with a length "B" equal to or greater than 10 feet.
3.
For installations that require an overflow tank, a tank the same size as the septic tank shall be used. Dual compartment baffles are not
required on overflow tanks regardless of the size.
4.
All pipes connecting to the tank shall be cut flush with the inside wall.
5.
Tank shall be manufactured by Mid Hudson Concrete Products, Inc.
CLEANOUT
COVER
REINFORCING
RIBS
LIQUID LEVEL
48" MIN; 60" MAX
INSPECTION COVER
PLAN
3" VENT
5"x5" OUTLET
SECTION A-A
3" SAND/PEA GRAVEL BED
NOTE: Add 4" to H for H-20 Loading
SEPTIC TANK SPECIFICATIONS & CAPACITIES
I
J
K
L
OUTLET
INTLET
60% TO 70%
TANK VOLUME
I
J
K
L
4"
6"x9"
20"Ø
10"x14"
4"
4"
2,000 Gal.
4"
5"
3"
12"
48"
56"
67"
6"x9"
10"x14"
6"x9"
10"x14"
6"x9"
10"x14"
144"
78"
PRECAST CONCRETE SEPTIC TANK DETAIL
AND OVERFLOW TANK DETAIL
16"
MIN
20"Ø
20"Ø
20"Ø
PREPARED FOR
SITE PLAN
Westchester County, NY
0 ALBANY POST ROAD
PROJECT LOCATION
THOMAS HANNIGAN JR
SEPTIC SYSTEM DETAIL
NOT TO SCALE
S-4
UNCONSOLIDATED
DRILLED WELL DETAIL
WATER BEARING ROCK
NOT TO SCALE
18"
18"
W-1
VERMIN-PROOF
SANITARY WELL CAP
CONDUIT FOR
ELECTRIC CABLE
CONCRETE SEAL
TEMPORARY CASING
MAY BE WITHDRAWN
AS GROUT IS PLACED
2" DISCHARGE LINE
CHECK VALVE
DRIVE SHOE
ALLOW SUFFICIENT
CLEARANCE FOR
GROUT PLACEMENT
SUBMERSIBLE PUMP
WELL CASING 50' MIN.
10' MIN. INTO ROCK
DROP PIPE
BASIC PITLESS UNIT
LIFT OUT PIPE
EXISTING GRADE
FINISHED GRADE
(MOUNDED TOPSOIL
@ WELL HEAD)
NOTES:
1.
The top of the well casing shall be set a minimum of 2 ft above the 100 yr
high-water level or 18 " above finished ground surface, whichever is greater.
2.
A minimum of 4 feet of cover shall be provided over the water service line.
8/30/2022 Eng. comments
21-22
PROJECT #
PROJECT SITE VIEW
NOT TO SCALE
S-7
6"-12"
4"
2"
24"
18" MIN. - 30" MAX.
OVERFILL TO ALLOW
FOR SETTLEMENT
4" TOPSOIL & SEED
UNTREATED BUILDING PAPER
OR PERMEABLE GEOTEXTILE
OR STRAW HAY
4"PERFORATED PIPE
MAX SLOPE 1/16" PER FT.
PERFORATIONS DOWN
3/4" TO 1-1/2" GRADED WASHED GRAVEL
OR WASHED CRUSHED STONE FREE OF
FINES AND SILTS - 12" MIN. DEPTH
NOTES:
1.
Ends of all trenches are to be capped.
2.
A separation distance of 5' minimum is required between the bottom of absorption trench and presence of ledgerock and/or groundwater table.
3.
4 inch perforated pvc gravity distribution lines shall be set at a pitch of 1/16" to 1/32" per ft. for gravity systems and set level for dosed systems.
4.
DO NOT install absorption trenches in wet or frozen soils.
5.
Absorption trenches are to be installed parallel to the contours.
BACKFILL (EARTH)
6" - 12" DEPTH
BACKFILL (EARTH)
6"-12" DEPTH
6"
MIN.
ENDCAP
6" MIN.
5' MIN. TO LEDGE
ROCK OR
GROUNDWATER
LEDGEROCK OR GROUNDWATER
1/3/2023 WCHD comments
Town of Croton-on-Hudson
1/3/2023 WCHD comments
10/31/2023 Town comments
1/11/2024 Town comments
DATE:
SCALE:
Sheet
of
No.
Date
Comments:
Yorktown Heights, NY 10598
www.sitedesignconsultants.com
Fax: (914) 962-7386
Land Planners
Engineer:
NYS Lic. No. 64431
Joseph C. Riina, P.E.
251-F Underhill Avenue,
Civil Engineers
(914) 962-4488 -
DRAINAGE
DETAILS
06/28/21
AS NOTED
CS
NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW
COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED
PREPARED FOR
SITE PLAN
Westchester County, NY
0 ALBANY POST ROAD
PROJECT LOCATION
THOMAS HANNIGAN JR
IMPORTANT - NOTES FOR THE BIDDING AND INSTALLATION OF THE SC-740 SYSTEM
1.
STORMTECH SC-740 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S REPRESENTATIVE HAS COMPLETED A
PRE-CONSTRUCTION MEETING WITH THE INSTALLERS.
2.
STORMTECH SC-740 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE".
3.
CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR AN EXCAVATOR SITUATED OVER THE CHAMBERS.
STORMTECH RECOMMENDS 3 BACKFILL METHODS:
·
STONESHOOTER LOCATED OFF THE CHAMBER BED.
·
BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR SUBGRADE.
·
BACKFILL FROM OUTSIDE THE EXCAVATION USING A LONG BOOM HOE OR EXCAVATOR.
4.
THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS.
5.
JOINTS BETWEEN CHAMBERS SHALL BE PROPERLY SEATED PRIOR TO PLACING STONE.
6.
MAINTAIN MINIMUM - 6" (150 mm) SPACING BETWEEN THE CHAMBER ROWS.
7.
EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE 3/4-2" (20-50 mm).
8.
THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIALS BEARING CAPACITIES TO THE SITE DESIGN
ENGINEER.
9.
ADS RECOMMENDS THE USE OF "FLEXSTORM CATCH IT" INSERTS DURING CONSTRUCTION FOR ALL INLETS TO PROTECT THE SUBSURFACE
STORMWATER MANAGEMENT SYSTEM FROM CONSTRUCTION SITE RUNOFF.
NOTES FOR CONSTRUCTION EQUIPMENT
1.
STORMTECH SC-740 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE".
2.
THE USE OF CONSTRUCTION EQUIPMENT OVER SC-740 CHAMBERS IS LIMITED:
·
NO EQUIPMENT IS ALLOWED ON BARE CHAMBERS.
·
NO RUBBER TIRED LOADERS, DUMP TRUCKS, OR EXCAVATORS ARE ALLOWED UNTIL PROPER FILL DEPTHS ARE REACHED IN ACCORDANCE
WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE".
·
WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT CAN BE FOUND IN THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE".
3.
FULL 36" (900 mm) OF STABILIZED COVER MATERIALS OVER THE CHAMBERS IS REQUIRED FOR DUMP TRUCK TRAVEL OR DUMPING.
USE OF A DOZER TO PUSH EMBEDMENT STONE BETWEEN THE ROWS OF CHAMBERS MAY CAUSE DAMAGE TO THE CHAMBERS AND IS NOT AN
ACCEPTABLE BACKFILL METHOD. ANY CHAMBERS DAMAGED BY THE "DUMP AND PUSH" METHOD ARE NOT COVERED UNDER THE STORMTECH
STANDARD WARRANTY.
CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON INSTALLATION REQUIREMENTS OR WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT.
SC-740 STORMTECH CHAMBER SPECIFICATIONS
1.
CHAMBERS SHALL BE STORMTECH SC-740.
2.
CHAMBERS SHALL BE ARCH-SHAPED AND SHALL BE MANUFACTURED FROM VIRGIN, IMPACT-MODIFIED POLYPROPYLENE
COPOLYMERS.
3.
CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418-16a, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP)
CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".
4.
CHAMBER ROWS SHALL PROVIDE CONTINUOUS, UNOBSTRUCTED INTERNAL SPACE WITH NO INTERNAL SUPPORTS THAT WOULD
IMPEDE FLOW OR LIMIT ACCESS FOR INSPECTION.
5.
THE STRUCTURAL DESIGN OF THE CHAMBERS, THE STRUCTURAL BACKFILL, AND THE INSTALLATION REQUIREMENTS SHALL ENSURE
THAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET FOR: 1)
LONG-DURATION DEAD LOADS AND 2) SHORT-DURATION LIVE LOADS, BASED ON THE AASHTO DESIGN TRUCK WITH CONSIDERATION
FOR IMPACT AND MULTIPLE VEHICLE PRESENCES.
6.
CHAMBERS SHALL BE DESIGNED, TESTED AND ALLOWABLE LOAD CONFIGURATIONS DETERMINED IN ACCORDANCE WITH ASTM F2787,
"STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS".
LOAD CONFIGURATIONS SHALL INCLUDE: 1) INSTANTANEOUS (<1 MIN) AASHTO DESIGN TRUCK LIVE LOAD ON MINIMUM COVER 2)
MAXIMUM PERMANENT (75-YR) COVER LOAD AND 3) ALLOWABLE COVER WITH PARKED (1-WEEK) AASHTO DESIGN TRUCK.
7.
REQUIREMENTS FOR HANDLING AND INSTALLATION:
·
TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING
STACKING LUGS.
·
TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS
THAN 2”.
·
TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN
SECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 550 LBS/IN/IN. AND b) TO RESIST CHAMBER DEFORMATION
DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM
REFLECTIVE GOLD OR YELLOW COLORS.
8.
ONLY CHAMBERS THAT ARE APPROVED BY THE SITE DESIGN ENGINEER WILL BE ALLOWED. UPON REQUEST BY THE SITE DESIGN
ENGINEER OR OWNER, THE CHAMBER MANUFACTURER SHALL SUBMIT A STRUCTURAL EVALUATION FOR APPROVAL BEFORE
DELIVERING CHAMBERS TO THE PROJECT SITE AS FOLLOWS:
·
THE STRUCTURAL EVALUATION SHALL BE SEALED BY A REGISTERED PROFESSIONAL ENGINEER.
·
THE STRUCTURAL EVALUATION SHALL DEMONSTRATE THAT THE SAFETY FACTORS ARE GREATER THAN OR EQUAL TO 1.95 FOR
DEAD LOAD AND 1.75 FOR LIVE LOAD, THE MINIMUM REQUIRED BY ASTM F2787 AND BY SECTIONS 3 AND 12.12 OF THE AASHTO
LRFD BRIDGE DESIGN SPECIFICATIONS FOR THERMOPLASTIC PIPE.
·
THE TEST DERIVED CREEP MODULUS AS SPECIFIED IN ASTM F2418 SHALL BE USED FOR PERMANENT DEAD LOAD DESIGN
EXCEPT THAT IT SHALL BE THE 75-YEAR MODULUS USED FOR DESIGN.
9.
CHAMBERS AND END CAPS SHALL BE PRODUCED AT AN ISO 9001 CERTIFIED MANUFACTURING FACILITY.
NOTES
1.
8-30" (200-750 mm) GRATES/SOLID COVERS SHALL BE DUCTILE IRON PER ASTM A536
GRADE 70-50-05
2.
12-30" (300-750 mm) FRAMES SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05
3.
DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS
4.
DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TO ASTM D3212
FOR CORRUGATED HDPE (ADS & HANCOR DUAL WALL) & SDR 35 PVC
5.
FOR COMPLETE DESIGN AND PRODUCT INFORMATION: WWW.NYLOPLAST-US.COM
6.
TO ORDER CALL: 800-821-6710
A
PART #
GRATE/SOLID COVER OPTIONS
8"
(200 mm)
2808AG
PEDESTRIAN LIGHT
DUTY
STANDARD LIGHT
DUTY
SOLID LIGHT DUTY
10"
(250 mm)
2810AG
PEDESTRIAN LIGHT
DUTY
STANDARD LIGHT
DUTY
SOLID LIGHT DUTY
12"
(300 mm)
2812AG
PEDESTRIAN
AASHTO H-10
STANDARD AASHTO
H-20
SOLID
AASHTO H-20
15"
(375 mm)
2815AG
PEDESTRIAN
AASHTO H-10
STANDARD AASHTO
H-20
SOLID
AASHTO H-20
18"
(450 mm)
2818AG
PEDESTRIAN
AASHTO H-10
STANDARD AASHTO
H-20
SOLID
AASHTO H-20
24"
(600 mm)
2824AG
PEDESTRIAN
AASHTO H-10
STANDARD AASHTO
H-20
SOLID
AASHTO H-20
30"
(750 mm)
2830AG
PEDESTRIAN
AASHTO H-20
STANDARD AASHTO
H-20
SOLID
AASHTO H-20
INTEGRATED DUCTILE IRON
FRAME & GRATE/SOLID TO
MATCH BASIN O.D.
VARIOUS TYPES OF INLET AND
OUTLET ADAPTERS AVAILABLE:
4-30" (100-750 mm) FOR
CORRUGATED HDPE
WATERTIGHT JOINT
(CORRUGATED HDPE SHOWN)
BACKFILL MATERIAL BELOW AND TO SIDES
OF STRUCTURE SHALL BE ASTM D2321
CLASS I OR II CRUSHED STONE OR GRAVEL
AND BE PLACED UNIFORMLY IN 12" (305 mm)
LIFTS AND COMPACTED TO MIN OF 90%
TRAFFIC LOADS: CONCRETE DIMENSIONS
ARE FOR GUIDELINE PUPOSES ONLY.
ACTUAL CONCRETE SLAB MUST BE
DESIGNED GIVING CONSIDERATION FOR
LOCAL SOIL CONDITIONS, TRAFFIC LOADING
& OTHER APPLICABLE DESIGN FACTORS
ADAPTER ANGLES VARIABLE 0°- 360°
ACCORDING TO PLANS
18" (457 mm)
MIN WIDTH
A
AASHTO H-20 CONCRETE SLAB
8" (203 mm) MIN THICKNESS
VARIABLE SUMP DEPTH
ACCORDING TO PLANS
[6" (152 mm) MIN ON 8-24" (200-600 mm),
10" (254 mm) MIN ON 30" (750 mm)]
4" (102 mm) MIN ON 8-24" (200-600 mm)
6" (152 mm) MIN ON 30" (750 mm)
12" (610 mm) MIN
(FOR AASHTO H-20)
INVERT ACCORDING TO
PLANS/TAKE OFF
INSPECTION & MAINTENANCE
STEP 1)
INSPECT ISOLATOR ROW PLUS FOR SEDIMENT
A.
INSPECTION PORTS (IF PRESENT)
A.1.
REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN
A.2.
REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED
A.3.
USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG
A.4.
LOWER A CAMERA INTO ISOLATOR ROW PLUS FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL)
A.5.
IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.
B.
ALL ISOLATOR PLUS ROWS
B.1.
REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW PLUS
B.2.
USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW PLUS THROUGH OUTLET PIPE
i)
MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRY
ii) FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE
B.3.
IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3.
STEP 2)
CLEAN OUT ISOLATOR ROW PLUS USING THE JETVAC PROCESS
A.
A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERRED
B.
APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN
C.
VACUUM STRUCTURE SUMP AS REQUIRED
STEP 3)
REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS.
STEP 4)
INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM.
NOTES
1.
INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS
OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS.
2.
CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY.
OR
MANHOLE
STORMTECH HIGHLY RECOMMENDS
FLEXSTORM INSERTS IN ANY UPSTREAM
STRUCTURES WITH OPEN GRATES
COVER ENTIRE ISOLATOR ROW PLUS WITH ADS
GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE
8' (2.4 m) MIN WIDE
SC-740 CHAMBER
OPTIONAL INSPECTION PORT
SC-740 END CAP
24" (600 mm) HDPE ACCESS PIPE REQUIRED
USE FACTORY PRE-FABRICATED END CAP
WITH FLAMP PART #: SC740EPE24BR
ONE LAYER OF ADSPLUS125 WOVEN GEOTEXTILE BETWEEN
FOUNDATION STONE AND CHAMBERS
5' (1.5 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS
SUMP DEPTH TBD BY
SITE DESIGN ENGINEER
(24" [600 mm] MIN RECOMMENDED)
NOTE:
INSPECTION PORTS MAY BE CONNECTED THROUGH ANY CHAMBER CORRUGATION CREST.
STORMTECH CHAMBER
8" NYLOPLAST INSPECTION PORT
BODY (PART# 2708AG4IPKIT) OR
TRAFFIC RATED BOX W/SOLID
LOCKING COVER
CONCRETE COLLAR
PAVEMENT
12" (300 mm) MIN WIDTH
CONCRETE SLAB
6" (150 mm) MIN THICKNESS
CONCRETE COLLAR NOT REQUIRED
FOR UNPAVED APPLICATIONS
4" (100 mm)
SDR 35 PIPE
4" (100 mm) INSERTA TEE
TO BE CENTERED ON
CORRUGATION CREST
NOMINAL CHAMBER SPECIFICATIONS
SIZE (W X H X INSTALLED LENGTH)
51.0" X 30.0" X 85.4"
(1295 mm X 762 mm X 2169 mm)
CHAMBER STORAGE
45.9 CUBIC FEET
(1.30 m³)
MINIMUM INSTALLED STORAGE*
74.9 CUBIC FEET
(2.12 m³)
WEIGHT
75.0 lbs.
(33.6 kg)
*ASSUMES 6" (152 mm) STONE ABOVE, BELOW, AND BETWEEN CHAMBERS
BUILD ROW IN THIS DIRECTION
OVERLAP NEXT CHAMBER HERE
(OVER SMALL CORRUGATION)
START END
90.7" (2304 mm) ACTUAL LENGTH
85.4" (2169 mm) INSTALLED LENGTH
A
A
C
B
51.0"
(1295 mm)
30.0"
(762 mm)
45.9" (1166 mm)
12.2"
(310 mm)
29.3"
(744 mm)
PART #
STUB
A
B
C
SC740EPE06T / SC740EPE06TPC
6" (150 mm)
10.9" (277 mm)
18.5" (470 mm)
---
SC740EPE06B / SC740EPE06BPC
---
0.5" (13 mm)
SC740EPE08T /SC740EPE08TPC
8" (200 mm)
12.2" (310 mm)
16.5" (419 mm)
---
SC740EPE08B / SC740EPE08BPC
---
0.6" (15 mm)
SC740EPE10T / SC740EPE10TPC
10" (250 mm)
13.4" (340 mm)
14.5" (368 mm)
---
SC740EPE10B / SC740EPE10BPC
---
0.7" (18 mm)
SC740EPE12T / SC740EPE12TPC
12" (300 mm)
14.7" (373 mm)
12.5" (318 mm)
---
SC740EPE12B / SC740EPE12BPC
---
1.2" (30 mm)
SC740EPE15T / SC740EPE15TPC
15" (375 mm)
18.4" (467 mm)
9.0" (229 mm)
---
SC740EPE15B / SC740EPE15BPC
---
1.3" (33 mm)
SC740EPE18T / SC740EPE18TPC
18" (450 mm)
19.7" (500 mm)
5.0" (127 mm)
---
SC740EPE18B / SC740EPE18BPC
---
1.6" (41 mm)
SC740EPE24B*
24" (600 mm)
18.5" (470 mm)
---
0.1" (3 mm)
SC740EPE24BR*
24" (600 mm)
18.5" (470 mm)
---
0.1" (3 mm)
ALL STUBS, EXCEPT FOR THE SC740EPE24B/SC740EPE24BR ARE PLACED AT BOTTOM OF END CAP SUCH THAT THE OUTSIDE
DIAMETER OF THE STUB IS FLUSH WITH THE BOTTOM OF THE END CAP. FOR ADDITIONAL INFORMATION CONTACT
STORMTECH AT 1-888-892-2694.
* FOR THE SC740EPE24B/SC740EPE24BR THE 24" (600 mm) STUB LIES BELOW THE BOTTOM OF THE END CAP APPROXIMATELY
1.75" (44 mm). BACKFILL MATERIAL SHOULD BE REMOVED FROM BELOW THE N-12 STUB SO THAT THE FITTING SITS LEVEL.
NOTE: ALL DIMENSIONS ARE NOMINAL
PRE-FAB STUB AT BOTTOM OF END CAP WITH FLAMP END WITH "BR"
PRE-FAB STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B"
PRE-FAB STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T"
PRE-CORED END CAPS END WITH "PC"
4" PVC INSPECTION PORT DETAIL
(SC SERIES CHAMBER)
STORMTECH SC-740 ISOLATOR ROW DETAIL
SWM-1
SWM-2
NOT TO SCALE
SC-740 TECHNICAL SPECIFICATION
SWM-3
NOT TO SCALE
NYLOPLAST DRAIN BASIN
SWM-4
REV
7004-110-007
DWG NO.
1 OF 1
SHEET
1:16
SCALE
DWG SIZE
A
3130 VERONA AVE
BUFORD, GA 30518
PHN (770) 932-2443
FAX (770) 932-2490
www.nyloplast-us.com
TYPICAL DRAIN BASIN WITH OUTLET WEIR
FOR STORMTECH
TITLE
PROJECT NO./NAME
MATERIAL
DATE
REVISED BY
10-28-03
DATE
EBC
DRAWN BY
THIS PRINT DISCLOSES SUBJECT MATTER IN WHICH
NYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPT
OR POSSESSION OF THIS PRINT DOES NOT CONFER,
TRANSFER, OR LICENSE THE USE OF THE DESIGN OR
TECHNICAL INFORMATION SHOWN HEREIN
REPRODUCTION OF THIS PRINT OR ANY INFORMATION
CONTAINED HEREIN, OR MANUFACTURE OF ANY
ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERS
IS FORBIDDEN, EXCEPT BY SPECIFIC WRITTEN
PERMISSION FROM NYLOPLAST.
01-17-12
CCA
(3) OUTLET WEIR
24" - 30"
DRAIN BASIN BODY
24" - 30" FRAME & SOLID COVER
(1)
(2)
12" PIPE TO CHAMBERS
(3)
1 - INVERT ELEVATIONS & LOCATIONS TO BE DETERMINED BY
ENGINEER.
2 - HEIGHT OF WEIR TO BE DETERMINED BY ENGINEER. WEIR HEIGHT
CANNOT EXCEED 84" DUE TO MANUFACTURING AND SHIPPING
RESTRICTIONS.
3 - WEIR MANUFACTURED TO MINIMIZE LOSS OF OUTLET PIPE OPEN
AREA SEE DRAWING NO. 7004-110-058 FOR DETAILS.
4 - ORIFICE HOLES AND SLOTS AVAILABLE AS REQUIRED BY ENGINEER
DESIGN AND PERMITTED BY MANUFACTURING RESTRICTIONS.
SIDE SECTION VIEW
TOP VIEW W/ FRAME &
COVER REMOVED
®
12"
INLET PIPE
WEIR
12"
ISOLATOR ROW
SWM-5
DETENTION OUTLET STRUCTURE DETAIL
STORM PIPE BEDDING DETAIL
D-2
DIA.
VARIES
PAVEMENT FINISHED GRADE.
SEE DRIVEWAY DETAIL FOR NEW INSTALLATIONS.
SEE PAVEMENT REPLACEMENT DETAIL FOR
INSTALLATIONS UNDER EXISTING ROADWAYS.
FINISH GRADE
2'-0" MIN
COVER
1'-0"
1'-0"
42" MIN
D/2
CLEAN FILL BEDDING
MATERIAL SEE NOTES
APPROVED SUB GRADE
8" MIN - IF GROUND WATER
TABLE S ENCOUNTERED
NOTES:
1.
Pipe shall be laid and connected in the bedding which shall consist of:
A. Compacted existing subsoil when laid above ground water or;
B. 3/4" crushed stone when laid below ground water.
2.
If subsoil is determined to be unsuitable by the Engineer, all unsuitable material shall be
removed for at least 2'-6" below the pipe invert or twice the pipe diameter, whichever is
greater, and replaced with compacted bedding material.
D-3
NOT TO SCALE
TYPICAL DRAIN INLET (TYPE DI) DETAIL
6" THICK
WALLS
PLAN
6"
3'-0"
6"
6"
2'-6"
A
8" 6"
A
STEPS
6"
15"
MAX
18"
6"
12"
VERT.
SPACING
3'-0"
6"
8"
8"
SECTION A-A
APPROVED SUB GRADE
FACE OF CURB
FRAME & GRATE: CAMPBELL
FOUNDRY Co. No. 3430B OR
AMERICAN MADE APPROVED EQUAL
FINISHED GRADE
BRICK ADJUSTMENT
(12" MAX.)
6" SOLID CONC. BLOCK
OR PRE CAST CONCRETE
REINFORCEMENT AS REQUIRED
FOR PRE CAST CONCRETE
STRUCTURE
FOR INVERT, SEE
PLAN OR PROFILE
APPROVED COMPACTED
CRUSHED STONE FOUNDATION
COURSE
STEPS AT 12" O.C. CAST
IRON OR POLYPROPYLENE
COATED STEEL
d
w/2
w/2
La
3' MIN.
d/2
1.0'
VARIES
d/2
SEE RIPRAP STANDARDS
AND SPECIFICATIONS
4"
6"
d/2
DISCH.
PIPE
NOTE: APRON @ ZERO GRADE
SIDE SLOPE 2:1
DISCHARGE TO
UNCONFINED SECTION
(FLARED OUTLET)
(MINIMUM TAILWATER
CONDITION)
6" MIN.
GRADED AGGREGATE
FILTER OR FILTER CLOTH
GRADED AGGREGATE
FILTER OR FILTER CLOTH
EXISTING
STABILIZED
CHANNEL
NO OVERFALL
RISER
SYMBOL
PROFILE VIEW
CROSS SECTION A-A
PLAN VIEW
A
A
A
A
PROFILE
D-4
NOT TO SCALE
RIPRAP OUTLET DETAIL
8/30/2022 Eng. comments
21-22
PROJECT #
Town of Croton-on-Hudson
1/3/2023 WCHD comments
10/31/2023 Town comments
1/11/2024 Town comments
Machine-extracted for search and reference — the original PDF is the authoritative version.