2024-01-10 HanniganSyrek weeHouse Alchemy dwgs 1
site plan
6 pages
Meeting: portal event 924 (no meeting page on file)
Agenda item: Old Business — Hannigan, Tom - 52 Upland Lane (67.8-2-1) Minor Site Plan Application & Associated Approvals for New House
Site plan, 6 pages. Attached to agenda item: “Old Business — Hannigan, Tom - 52 Upland Lane (67.8-2-1) Minor Site Plan Application & Associated Approvals for New House”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
2023-05-05 Hannigan DDPricingSet
21-22 Site Plan 1-11-2024 FULL SET
HanniganSyrek weeHouse Cover Sheet 1
Letter from Michael Preziosi Town of Cortland
Extracted text
EXTERIOR PERSPECTIVE AND MATERIALS
1/10/2024
Hannigan-Syrek weeHouse
SIDING: THERMALLY MODIFIED WOOD
SIDING OVER VENTILATED RAINSCREEN
COLOR: A NATURAL, DARK FINISH SUCH
AS GREY OR BROWN/BLACK PINE TAR.
ROOF: LOW SLOPE 1/4" = 1'-0" MEMBRANE
ROOF - NOT VISIBLE FROM LAND. METAL
ROOF FASCIA AND TRIMS TO MATCH
SIDING
WINDOWS AND DOORS: BLACK EXTERIOR
FRAME
FOUNDATION: NATURAL CONCRETE
STONE WALL: LOW, STACKED STONE
LANDSCAPE WALL TO MATCH EXISTING
LOW ROCK WALLS ON SITE. STONE FROM
HOUSE PROPERTY.
SIDING IMAGE: PATTERN OF WOOD SIDING WITH TWO BOARD WIDTHS -
SIDING COLOR OPTIONS WILL BE SAMPLED IN A DARK, NATURAL FINISH
Note: Trees not shown for clarity of home design. See
site plan for planned grove of trees in front of house.
W
G
G
G
G 42
G 42
G
G
G 42
UP
G 42
TL3
WDFLR
RES1
WDFLR
TL6
WDFLR
TL5
D.W.
G HORZ 32
DW
G HORZ 40
G HORZ 40
MICRO
REF
CKTP
VTHD
OVEN
BIDET
DIM
DIM
DIM
DIM
DIM
G HORZ 42
W
D
DIM 3
FP
BIDET
DOOR
SINK
HEAT PUMP
WH
RES1
G 42
ERV
HP
FLR GRATE
WDFLR
SITE + ROOF PLAN
1" = 10'-0"
30'-0" SIDE YARD SETBACK LINE
GARDEN PATIO
BLEND LANDSCAPING INTO
EXISTING FORESTED
GROUND
45' REAR YARD SETBACK
WELL LOCATION
PROPERTY LINE
HOUSE ENTRANCE
EXISTING STONE
LANDSCAPE WALL,
VEGETATION AND
CONTOURS TO REMAIN AS IS
WOODED
AREA
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
PERVIOUS SURFACE
NEW, LOW ROCK
WALL OR EARTH
BERM - TBD
IMPERVIOUS
PAVING AT
DRIVEWAY
1'-0" MIN
53'-7"
52'-7"
100.93°
HOUSE TO BE BUILT
ENTIRELY ON CROTON-ON
HUDSON SIDE OF TOWN LINE
[INCLUDING FOOTINGS AND
OVERHANGS]
9'-5"
+/-
TOWN LINE
TOWN OF CORTLANDT
VILLAGE OF CROTON-ON-HUDSON
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SITE PLAN NOTES:
1.
SEE CIVIL ENGINEERING DRAWINGS FOR ALL SITE AND
UTILITY INFORMATION
2.
HOUSE CONSTRUCTION IS ENTIRELY WITHIN THE
VILLAGE OF CROTON-ON-HUDSON
SITE PLAN LEGEND
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
NEW GROVE OF TREES
ENTRANCE COURTYARD WITH TREES AND LANDSCAPING
SITE LANDSCAPING: DRY STACKED STONE SALVAGED FROM
PROPERTY
DECK
ROOF DECK AT SECOND LEVEL
FIREPLACE CHIMNEY
ROOF MEMBRANE, TAPERED INSULATION OVER ROOF
STRUCTURE
GUTTERS AT PERIMETER OF HOUSE, TYP
ALL ROOF CRICKETS AT 1/2" = 1'-0" SLOPE
MEASUREMENTS FROM CORNER OF CONCRETE FOUNDATION
WALL
SURVEYED TREES
SEE OWNER SUBMITTED TREE SURVEY INFORMATION
PRESERVE OPEN AREA TO SOUTH FOR HOME'S SOLAR
EXPOSURE
MAINTAIN NATURAL CONTOUR AND LANDSCAPING AS MUCH AS
POSSIBLE. MINIMIZE LAND DISTURBANCE, TYP
SCALE:
DATE:
1" = 10'-0"
52 Upland Lane
Croton-on-Hudson, NY 10520
0.1
SITE + ROOF PLAN
ISSUE
ALCHEMY LLC
856 RAYMOND
ST PAUL, MN 55114
651.647.6650
DESCRIPTION
DATE
IF PRINTED ON 24X36
1" MARGIN LEFT BLANK
IF PRINTED ON 24X36
REVISION
#
DATE
GENERAL CONTRACTOR
STRUCTURAL ENGINEER
Hannigan-Syrek
weeHouse
Customworks Building and
Remodeling, Inc
300 Mt Airy Road West
Croton, NY 10520
914.382.7792
ERA Structural Engineering
2550 University Ave W
Suite 423-S
St Paul, MN 55114
651.251.7570
DESIGNER
PLANNING
BD MEETING
1/10/24
E-06
W-20
W-21
W-19
GARAGE
26'-5" x 28'-5"
E-05
I-04
UP
I-06
2'-6"
8'-7"
6'-8 1/2"
2'-5 1/2"
11'-2 5/8"
13'-0"
3'-0"
15'-10"
2'-6"
2'-3"
5'-0"
51'-0"
6'-8"
27'-4"
I-03
I-02
11'-0"
11'-8"
25'-11 1/2"
I-01
W-07
W-05
W-06
W-08
W-08
OFFICE / BED 2
13'-0" x 13'-8"
BATH
4'-11" x 11'-1"
I-07a
I-07b
I-07c
I-07d
I-07e
I-05
ENTRY
6'-8" x 10'-8"
PRIMARY BEDROOM
11'-9" x 15'-1"
LAUNDRY
6'-4" x 9'-3"
4'-0"
3'-0"
21'-7"
26'-4"
16'-0"
5 1/2"
11'-9 1/2"
3 1/2"
7'-2"
3 1/2" 5 1/2"
W-13
5 1/2"
5 1/2"
5 1/2"
5 1/2"
LIVING / DINING KITCHEN
17'-9" x 31'-1"
W-15
W-14
W-02
PRIMARY BATH
7'-1" x 15'-1"
TL3
WDFLR
RES1
WDFLR
TL6
WDFLR
TL5
W-04
W-09
W-11
W-10
W-12
17'-10"
E-04
I-10
W-03
E-03
E-02
3"
+/- 6'-4 5/8"
37'-1"
13'-11"
6'-8"
7'-4"
20'-0"
5'-4"
2'-4"
27'-5 1/2"
1 1/2"
1'-8"
E-01
W-01
FIRST FLOOR PLAN
1/4" = 1'-0"
D
C
C
B.9
G
A
B
E.2
5.9
5.9
5.1
2.4
0.9
DASHED LINES INDICATE
LOCATION OF 2ND LEVEL
EXTERIOR WALLS ABOVE
FRAMED DECK
REVIEWING SINK SIZE
LOW CABINET
20"
2.0
2.0
2.1
2.1
3.0
3.0
3.0
3.0
4.1
4.1
2.1
2.1
RAMP
SLOPE 1:20
RAMP
SLOPE 1:20
ADJ
SHELVES
COATS
FULL
HEIGHT
PANTRY
LESS USED
KITCHEN STRG
MURPHY BED
ADJUSTABLE
SHELVING
ADJUSTABLE
SHELVING
DW
ESPRESSO
INDUCTION
COOKTOP/
WALL OVEN
IN BASE CAB
MICRO
UNDER
COUNTER
GUEST
CABINET
REFRIG
FULL
HEIGHT
PANTRY
D
W
LINEN
36 X 42
SHOWER
SINK
36 X 72 TUB
E
E
F
F
UP
DN
DN
SCALE:
DATE:
1/4" = 1'-0"
52 Upland Lane
Croton-on-Hudson, NY 10520
1.0
GROUND LEVEL PLAN
ISSUE
ALCHEMY LLC
856 RAYMOND
ST PAUL, MN 55114
651.647.6650
DESCRIPTION
DATE
IF PRINTED ON 24X36
1" MARGIN LEFT BLANK
IF PRINTED ON 24X36
REVISION
#
DATE
GENERAL CONTRACTOR
STRUCTURAL ENGINEER
Hannigan-Syrek
weeHouse
Customworks Building and
Remodeling, Inc
300 Mt Airy Road West
Croton, NY 10520
914.382.7792
ERA Structural Engineering
2550 University Ave W
Suite 423-S
St Paul, MN 55114
651.251.7570
DESIGNER
PLANNING
BD MEETING
1/10/24
27'-11"
W-16
MECH
6'-0" x 9'-11"
STUDIO
13'-1" x 19'-1"
SINK
I-09
W-18
HEAT PUMP
WH
STUDIO STORAGE
6'-0" x 8'-8"
RES1
W-17
BRIDGE
6'-7" x 6'-8"
FLR GRATE
WDFLR
SECOND FLOOR PLAN
1/4" = 1'-0"
D
C
C
F
B.9
A
B
E
E
E.2
5.9
5.9
G
5.1
2.4
0.9
13'-1"
3.0
3.0
3.0
3.0
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
5'-4"
11'-0"
7'-4"
4'-4"
26'-0"
3'-0"
15'-10"
2'-6"
2'-3"
20'-7"
4.1
4.1
2.1
2.1
2.0
2.0
2.1
2.1
UTILITY
SINK
SHELVING
SYSTEM BY
OWNERS
VERTICAL SUPPLY RUN
DOWN TO CRAWLSPACE
VERTICAL RETURN RUN UP
FROM CRAWLSPACE
ALCH TO COORDINATE DUCTED
HEAT PUMP AND ERV SIZE AND
LOCATION WITH GC + MECH
CONTRACTOR
ERV
HP
AIR INTAKE HOOD [EXACT
LOCATION TBD]
AIR EXHAUST HOOD [EXACT
LOCATION TBD]
6'-8"
CLEAR
10'-11"
6'-6"
8'-8 1/2"
6'-4 1/2"
7'-4"
6'-8"
13'-11"
20'-0"
37'-1"
33'-5"
DN
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SLOPE
1/4" = 1'-0"
SCALE:
DATE:
1/4" = 1'-0"
52 Upland Lane
Croton-on-Hudson, NY 10520
1.1
SECOND LEVEL PLAN
ISSUE
ALCHEMY LLC
856 RAYMOND
ST PAUL, MN 55114
651.647.6650
DESCRIPTION
DATE
IF PRINTED ON 24X36
1" MARGIN LEFT BLANK
IF PRINTED ON 24X36
REVISION
#
DATE
GENERAL CONTRACTOR
STRUCTURAL ENGINEER
Hannigan-Syrek
weeHouse
Customworks Building and
Remodeling, Inc
300 Mt Airy Road West
Croton, NY 10520
914.382.7792
ERA Structural Engineering
2550 University Ave W
Suite 423-S
St Paul, MN 55114
651.251.7570
DESIGNER
PLANNING
BD MEETING
1/10/24
W-09
W-18
W-05
W-08
W-06
W-07
W-10
W-11
W-12
FOUNDATION
SIDING
GROUND LEVEL: T/O SUBFLOOR
0"
ROOF EAVE
9'-10"
ROOF EAVE
20'-10"
5.9
5.1
0.9
NORTH ELEVATION
Scale: 1/4" = 1'-0"
SIDING
SIDING
GUARD RAIL
MECHANICAL CONDENSER
DECK
FIREPLACE CHIMNEY
INSULATED METAL PIPE
AIR INTAKE HOOD
SECOND LEVEL: T/O SUBFLOOR
10'-10"
2.4
E-03
W-03
E-02
W-02
W-16
E-06
GROUND LEVEL: T/O SUBFLOOR
0"
ROOF EAVE
9'-10"
ROOF EAVE
20'-10"
5.9
2.4
0.9
SIDING
SIDING
SIDING
PNL 2
DECK
STONE WALL
PNL 1
PNL 1
SIDE +
SILL
SOFFIT +
SIDE
SOUTH ELEVATION
Scale: 1/4" = 1'-0"
SECOND LEVEL: T/O SUBFLOOR
10'-10"
5.1
FASCIA
EDGE
1.5"
5.5"
B
DRIP EDGE
HEAD / SIDING
BREAK
JAMB (FOR BOX
CHANNEL)
SILL (J-TRIM) JAMB (FOR
MISC. PROFILES)
4"
4"
3"
2" + 3/4"
3"
1.75"
3"
1.75"
1"
3"
A
C
F
E
D
I
OPEN HEM
DOOR + LEDGER
FLASHING (UTILITY)
1.5"
PVDF: RUST
MATCH SIDING
SHROUD
FLASHING @ WOOD: TOP
5.625"
1.5"
1.5"
H
FOUNDATION FLASHING
3"
1.5"
2.5"
UTILITY FINISH
PVDF: BLACK
3"
3"
G
SHROUD FLASHING
@ WOOD: BOTTOM
3"
WARNING! ROOFING TAPES & SEALANTS DO NOT ADHERE TO WEATHERING STEEL FOR DRIP EDGES & CRITICAL TRIM, USE KYNAR-FINISHED TRIM W/ A "RUST" - COLORED PAINT.
EXTERIOR MATERIALS
SIDING OVER RAINSCREEN [FURRING] WITH EXPOSED FASTENERS
PRICING OPTIONS:
A: GREY WOOD SIDING, THERMALLY MODIFIED WITH SIOOX SEALER [GREY FINISH]. MIX 1X6 AND 1X4 BOARDS.
B: BROWN-BLACK PINE TAR SIDING
SIDING
PNL 1
FLAT PANEL MATERIAL TBD.
FOUNDATION
EXPOSED CAST IN PLACE CONCRETE WALL, SEALED
GUARDRAIL
STEEL FRAME WITH INFILL PANEL TBD
DECK
COMPOSITE DECKING OVER TREATED DECK
FRAME
PNL 2
BLACK FLAT PANEL: RICHLITE OR SIMILAR
LOW DRY STACKED LANDSCAPE WALL FROM STONE FOUND ON PROPERTY
MATCH CONSTRUCTION AND CHARACTER OF OTHER STONE WALLS ON SITE
STONE WALL
SCALE:
DATE:
52 Upland Lane
Croton-on-Hudson, NY 10520
2.0
EXTERIOR ELEVATIONS
ISSUE
ALCHEMY LLC
856 RAYMOND
ST PAUL, MN 55114
651.647.6650
DESCRIPTION
DATE
IF PRINTED ON 24X36
1" MARGIN LEFT BLANK
IF PRINTED ON 24X36
REVISION
#
DATE
GENERAL CONTRACTOR
STRUCTURAL ENGINEER
Hannigan-Syrek
weeHouse
Customworks Building and
Remodeling, Inc
300 Mt Airy Road West
Croton, NY 10520
914.382.7792
ERA Structural Engineering
2550 University Ave W
Suite 423-S
St Paul, MN 55114
651.251.7570
DESIGNER
PLANNING
BD MEETING
1/10/24
W-20
W-21
W-17
W-04
G
D
C
F
B.9
A
B
E
SIDING
SIDING
FOUNDATION
SIDING
WEST ELEVATION
Scale: 1/4" = 1'-0"
STONE WALL
E-01
W-01
W-19
W-13
EAST ELEVATION
Scale: 1/4" = 1'-0"
GROUND LEVEL: T/O SUBFLR
0"
ROOF EAVE
9'-10"
ROOF EAVE
20'-10"
BARN TYPE GARAGE
DOOR WITH SIDING
SIDING
SIDING
AIR EXHAUST
HOOD BEYOND
.
.
EXTENT OF OPEN GARAGE DOOR
(SHOWN DASHED)
END OF SLIDING DOOR TRACK BEFORE
RAMP - WALKWAY NEVER OBSTRUCTED
GARAGE DOOR OPENING
(SHOWN DASHED)
G
C
F
B.9
A
B
E
SECOND FLOOR: T/O SUBFLR
10'-10"
W-19
SIDING
ROOF EAVE
9'-10"
SOUTH ELEVATION RAMP COURTYARD
1/4" = 1'-0"
0.9
2.4
RAMP SHOWN
DASHED
TREES AT
ENTRANCE
COURTYARD
GARAGE: T/O SLAB ON GRADE
-1'-6"
GROUND LEVEL: T/O SUBFLOOR
0"
W-14
W-15
SIDING
GROUND LEVEL: T/O SUBFLR
0"
ROOF EAVE
9'-10"
NORTH ELEVATION RAMP COURTYARD
1/4" = 1'-0"
RAMP SHOWN
DASHED
2.4
E-01
W-01
WEST ELEVATION RAMP COURTYARD
1/4" = 1'-0"
0"
SIDING
E
B.9
SCALE:
DATE:
52 Upland Lane
Croton-on-Hudson, NY 10520
2.1
EXTERIOR ELEVATIONS
ISSUE
ALCHEMY LLC
856 RAYMOND
ST PAUL, MN 55114
651.647.6650
DESCRIPTION
DATE
IF PRINTED ON 24X36
1" MARGIN LEFT BLANK
IF PRINTED ON 24X36
REVISION
#
DATE
GENERAL CONTRACTOR
STRUCTURAL ENGINEER
Hannigan-Syrek
weeHouse
Customworks Building and
Remodeling, Inc
300 Mt Airy Road West
Croton, NY 10520
914.382.7792
ERA Structural Engineering
2550 University Ave W
Suite 423-S
St Paul, MN 55114
651.251.7570
DESIGNER
PLANNING
BD MEETING
1/10/24
Machine-extracted for search and reference — the original PDF is the authoritative version.