croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Sunday, August 16, 2026· Aug 16, 2026
Source-linkedCorrections welcomed
Documents

21-22 Site Plan 1-11-2024 FULL SET

site plan 12 pages
Meeting: portal event 924 (no meeting page on file)
Agenda item: Old Business — Hannigan, Tom - 52 Upland Lane (67.8-2-1) Minor Site Plan Application & Associated Approvals for New House
Site plan, 12 pages. Attached to agenda item: “Old Business — Hannigan, Tom - 52 Upland Lane (67.8-2-1) Minor Site Plan Application & Associated Approvals for New House”
Retrieved 2026-04-15 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: 2023-05-05 Hannigan DDPricingSet 2024-01-10 HanniganSyrek weeHouse Alchemy dwgs 1 HanniganSyrek weeHouse Cover Sheet 1 Letter from Michael Preziosi Town of Cortland
S 51° 40 S 88° 55' 45" E 67.06' N 34° 39' 55" E 14.58' N 78° 37' 55" E 6.25' N 42° 31' 55" E 102.19' N 46° 25' 45" E 98.48' .00' N 27° 39' 35" E 32.77' N 38° 19' 15" E 77.45' S 88° 55' 45" E 67.06' S 70° 39' 25" E 28.82' S 74° 23' 05" E 22.00' S 70° 56' 05" E 23.25' S 72° 06' 05" E 98.98' S 68° 27' 05" E 38.07' S 27° 34' 55" W 38.39' S 29° 05' 05" W 50.11' S 30° 18' 35" W 152.32' S 27° 58' 35" W 74.29' S 30° 39' 55" W 66.86' S 31° 50' 55" W 90.27' S 32° 00' 35" W 96.58' N 60° 07' 25" W 189.42' N 63° 09' 25" W 31.15' N 47° 03' 05" W 576.36' S 50° 11' 25" W 50.00' S 51° 40' 25" W 123.28' S 46° 55' 05" W 100.35' S 71° 24' 15" E 33.89' S 70° 39' 25" E 28.82' S 22° 34' 05" W 225.18' 30' 6.5' S 51° 40 PT#6 DT#6 PT#4 DT#4 PT#5 DT#5 TP-3 IT-3 TP-4 IT-4 VILLAGE OF CROTON-ON HUDSON VILLAGE OF CROTON-ON HUDSON TOWN OF CORTLANDT TOWN OF CORTLANDT 30' T.O.C. FRONT YARD SETBACK 30' T.O.C. FRONT YARD SETBACK 30' V.C.O.H. SIDE YARD SETBACK 45' V.C.O.H. REAR YARD SETBACK PROPOSED DRIVEWAY PROPOSED 3-BEDROOM RESIDENCE 101.0' R30' W FFE: 586.25 GFE: 583.35 12' PROPOSED WELL 356.4' 676.5' 84.6' PROPOSED RETAINING WALL MAX HEIGHT: 2 FEET. PROPOSED STORMWATER MANAGEMENT PROPOSED SEPTIC SYSTEM LOCATION PROPOSED GRADING RD RD RD RD RD RD RD RD FD ROOF DRAIN FOOTING DRAIN D D C PROPOSED RESIDENCE 2 BEDROOM + 1 FUTURE BEDROOM GARDEN WITH PATIO BLEND LANDSCAPING INTO EXISTING FORESTED GROUND PROPOSED GARDEN PROPOSED CURB PROPOSED PAVER DRIVEWAY PROPOSED EMERGENCY ACCESS ROAD. PROPOSED RETAINING WALL C DATE: SCALE: Sheet of No. Date Comments: Yorktown Heights, NY 10598 www.sitedesignconsultants.com Fax: (914) 962-7386 Land Planners Engineer: NYS Lic. No. 64431 Joseph C. Riina, P.E. 251-F Underhill Avenue, Civil Engineers (914) 962-4488 - COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW. SAFE DIG Before You Dig, Drill or Blast! CALL US TOLL FREE 811 or 1-800-962-7962 NY Industrial Code Rule 753 requires no less than two working days notice, but not more than ten days notice. www.digsafelynewyork.com F:\2021\21-22 THOMAS W. HANNIGAN (BOB DUBRAY)-UPLAND DR - MATT CARROLL\ENGINEERING\CAD\C3D-21-22 THOMAS W. HANNIGAN (BOB DUBRAY)\DWG\21-22 SITE PLAN 1-10-2024.DWG 1/11/2024 9:33:07 AM 1" = 30' SITE PLAN PREPARED FOR SITE PLAN Westchester County, NY CS 6-28-2021 0 ALBANY POST ROAD PROJECT LOCATION THOMAS HANNIGAN JR SCALE: 1"=50'-0" 8/30/2022 Eng. comments 21-22 PROJECT # NOTE: 1. THIS IS NOT A SURVEY. ALL SURVEY INFORMATION SHOWN ON THIS PLAN HAS BEEN TAKEN FROM SURVEY MAP PREPARED BY JOSEPH R LINK, L.S., DATED 1/22/21. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY. Town of Croton-on-Hudson 1/3/2023 WCHD comments 10/31/2023 Town comments N/A SIDE YARD SETBACK: NONE ZONING SCHEDULE OF TOWN OF CORTLANDT: 10,000 SF 35 FEET 20 FT. - (1) 30 FT. BUILDING COVERAGE: FRONT YARD SETBACK: REAR YARD SETBACK: MAXIMUM HEIGHT: MINIMUM LOT AREA PER DWELLING: 0.8 % OF LOT AREA 35 FT MAX 306,442 S.F. PROVIDED LOCATION MAP NOT TO SCALE MINIMUM SIZE OF LOT: MINIMUM YARD DIMENSIONS: PRINCIPAL BUILDING: NONE NONE VARIANCE REQUIRED NONE R-10, SINGLE FAMILY RESIDENTIAL ZONING DISTRICT: DIMENSIONAL REGULATIONS: MAXIMUM LOT AREA TO BE OCCUPIED: PRINCIPAL BUILDING - FEET: NONE PRINCIPAL BUILDING - STORIES: NONE 2 1/2 2 STORIES SITE DATA: OWNER: THOMAS HANNIGAN JR 52 UPLAND ROAD CORTLANDT, NY 10520 PROJECT LOCATION: 52 UPLAND ROAD CORTLANDT, NY, 10520 EXISTING TOWN ZONING: CORTLANDT: R-10. CROTON-ON-HUDSON: R-60 PROPOSED USE: CORTLANDT: R-10. CROTON-ON-HUDSON: R-60 TOWN TAX MAP DATA: SECTION 68.08, BLOCK 2, LOT 67.08 & 26 SITE AREA : 7.06 ACRES (307641 SF) SEWAGE FACILITIES: SUBSURFACE SEWAGE TREATMENT SYSTEM WATER FACILITIES: DRILLED WELL WATERSHED: - 75 FT. MINIMUM LOT WIDTH: 375 FT. NONE 50% MINIMUM LANDSCAPE COVERAGE: 387 FT. NONE -- LOT COVERAGE: N/A NONE -- BUILDING SIZE: 2,885 SF NONE N/A FLOOR AREA RATIO: 0.01 NONE NONE PROPERTY LINE / RIGHT OF WAY EXISTING STONE WALL PROPOSED GRADING EXISTING GRADING EXISTING SPOT GRADE PROPOSED RIP RAP AT PIPE END EXISTING TREE TO BE REMOVED CONSTRUCTION ENTRANCE LEGEND PROPOSED RETAINING WALLS PROPOSED STABILIZED PROPOSED LIMIT OF DISTURBANCE FD RD PROPOSED FOOTING DRAIN PROPOSED ROOF DRAIN EXISTING STONE WALLS TO BE REMOVED PROPOSED HOUSE AND DRIVE PROPOSED SOIL STOCKPILES PROPOSED SILT FENCE SS SS PROPOSED PERMANENT SWALE 30/80 FT. ONE SIDE SETBACK/BOTH YARDS: 84.6/676.5 FT. NONE ZONING SCHEDULE OF VILLAGE OF CROTON-ON-HUDSON: 60,000 SF 35 FEET 45 FT. 15% OF LOT AREA 50 FT. BUILDING COVERAGE: FRONT YARD SETBACK: REAR YARD SETBACK: MAXIMUM HEIGHT: MINIMUM LOT AREA PER DWELLING: 0.8 % OF LOT AREA 35 FT MAX 306,442 S.F. PROVIDED 356.4 FT. 101 FT. MINIMUM SIZE OF LOT: MINIMUM YARD DIMENSIONS: PRINCIPAL BUILDING: NONE NONE VARIANCE REQUIRED NONE R-60, SINGLE FAMILY RESIDENTIAL ZONING DISTRICT: DIMENSIONAL REGULATIONS: MAXIMUM LOT AREA TO BE OCCUPIED: PRINCIPAL BUILDING - FEET: NONE PRINCIPAL BUILDING - STORIES: NONE 2 1/2 2 STORIES 175 FT. MINIMUM LOT WIDTH: 597 FT. NONE 225 FT. 387 FT. NONE NONE MINIMUM LOT DEPTH: 35 FEET MINIMUM DWELLING REGULATIONS: 35 FT MAX HABITABLE AREA: NONE FLOOR AREA RATIO (1): NONE 2 1/2 2 1/2 MAX REQUIRED OFF STREET PARKING: NONE 2 PER D.U. UPLAND ROAD 84.6/676.5 FT. 356.4 FT. 101 FT. 1/11/2024 Town comments CUT P.O.B. Parcel II Formerly Parcel III PARCEL III PARCEL II N 78° 32' 10" W S 80° 29' 10" E 46.41' S 79° 50' 00" E 57.91' S 62° 43' 30" E 56.74' S 58° 44' 20" E 64.46' S 59° 29' 10" E 33.89' S 62° 28' 00" E 22.00' S 60° 11' 00" E 98.98' S 56° 32' 00" E 38.07' N 70° 33' 00" E 225.18' S 39° 30' 00" W 38.39' S 41° 00' 10" W 50.11' S 42° 13' 40" W 152.32' S 39° 53' 40" W 74.29' S 42° 35' 00" W 66.86' S 43° 46' 00" W 90.27' S 43° 55' 40" W 96.58' TOWN OF CORTLANDT VILLAGE OF CROTON ON HUDSON N 48° 12' 20" W 189.42' N 51° 14' 20" W 31.15' N 35° 08' 00" W 576.36' N 39° 34' 40" E 32.77' N 50° 14' 20" E 77.45' N 77° 00' 40" W 67.06' STONE WALL STONE WALL STONE WALL STONE WALL N 45° 00' 00" W 50.00' S 70° 00' 00" W 52.92' 32.00' N 78° 32' 10" W 28.21' 230.75' 54.81' 35.64' WAS Bk 323-P76 ? 30.5' 30' GRAVEL PARKING AREA Stream Remains of Foundation Stone Ret. Wall STONE WALL Bar-Way Frame Garage Deck Steps STONE MASONRY R Gu ASPHALT Concrete Block Aprons GRAVEL Stone Mas. Ret. Wall STONE ASPHALT DRIVEWAY ASPHALT PARKING AREA EXISTING DWELLING PATH PATH PATH PATH WOOD POST AND RAIL FENCE W/ WIRE S 58° 50' 10" W 100.35' S 63 S 62° 06' 30" W 50.00' VACANT LOT 1 Sty. Frame Pin Found ? Stone Ret. Wall 6.5' Wood Plat. STONE N 54° 27' 00" E 102.19' S 89° 27' 00" E 6.25' N 46° 35' 00" E 14.58' Ent. Wood STONE P.O.B.Parcel "1A" LOT LINE TO BE REMOVED P.O.B. S 78° 32' 10" E 262.75' C DATE: SCALE: Sheet of No. Date Comments: Yorktown Heights, NY 10598 www.sitedesignconsultants.com Fax: (914) 962-7386 Land Planners Engineer: NYS Lic. No. 64431 Joseph C. Riina, P.E. 251-F Underhill Avenue, Civil Engineers (914) 962-4488 - COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW. SAFE DIG Before You Dig, Drill or Blast! CALL US TOLL FREE 811 or 1-800-962-7962 NY Industrial Code Rule 753 requires no less than two working days notice, but not more than ten days notice. www.digsafelynewyork.com F:\2021\21-22 THOMAS W. HANNIGAN (BOB DUBRAY)-UPLAND DR - MATT CARROLL\ENGINEERING\CAD\C3D-21-22 THOMAS W. HANNIGAN (BOB DUBRAY)\DWG\21-22 SITE PLAN 1-10-2024.DWG 1/11/2024 9:33:07 AM 1" = 30' EXISTING CONDITIONS PLAN PREPARED FOR SITE PLAN Westchester County, NY CS 6-28-2021 0 ALBANY POST ROAD PROJECT LOCATION THOMAS HANNIGAN JR PROPERTY LINE / RIGHT OF WAY EXISTING STONE WALL PROPOSED GRADING EXISTING GRADING EXISTING SPOT GRADE PROPOSED RIP RAP AT PIPE END EXISTING TREE TO BE REMOVED CONSTRUCTION ENTRANCE LEGEND PROPOSED RETAINING WALLS PROPOSED STABILIZED PROPOSED LIMIT OF DISTURBANCE FD RD PROPOSED FOOTING DRAIN PROPOSED ROOF DRAIN EXISTING STONE WALLS TO BE REMOVED PROPOSED HOUSE AND DRIVE PROPOSED SOIL STOCKPILES PROPOSED SILT FENCE SS SS PROPOSED PERMANENT SWALE SCALE: 1"=50'-0" 8/30/2022 Eng. comments 21-22 PROJECT # NOTE: 1. THIS IS NOT A SURVEY. ALL SURVEY INFORMATION SHOWN ON THIS PLAN HAS BEEN TAKEN FROM SURVEY MAP PREPARED BY JOSEPH R LINK, L.S., DATED 1/22/21. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY. Town of Croton-on-Hudson 1/3/2023 WCHD comments 10/31/2023 Town comments 1/11/2024 Town comments S 46° 55' 05" W 100.35' STONE WALL STONE WALL STONE WALL STONE WALL 323-P76 ? Stream STONE WALL Bar-Way Frame Garage Deck Steps EXISTING DWELLING 1 Sty. Frame Wood Plat. Ent. Wood GLASS AND M PROPANE TANK COVER VILLAGE OF CROTON-ON HUDSON VILLAGE OF CROTON-ON HUDSON TOWN OF CORTLANDT TOWN OF CORTLANDT W FFE: 586.25 GFE: 583.35 UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE RD RD RD RD RD RD RD RD RD RD RD RD RD RD FD FD ROOF DRAIN FOOTING DRAIN D D TREE (TYP.) TOTAL LIMIT OF DISTURBANCE ±2.12 ACRES C PROPOSED RESIDENCE 2 BEDROOM + 1 FUTURE BEDROOM PROPOSED 8" HDPE PIPE L= 63 FT, SLOPE= 7.7% PROPOSED DI-4 RIM: 513.32 INV IN: 512.51 INV OUT: 511.82 PROPOSED DI-6 RIM: 488.53 INV IN: 487.49 INV OUT: 487.03 PROPOSED DI-7 RIM: 470.35 INV OUT: 469.35 PROPOSED 8" HDPE PIPE L= 161 FT, SLOPE= 9.7% PROPOSED 8" HDPE PIPE L= 72 FT, SLOPE= 17.4% PROPOSED 8" HDPE PIPE L= 115 FT, SLOPE= 9.7% PROPOSED 8" HDPE PIPE L= 49 FT, SLOPE = 39.4% PROPOSED 70 SC-740 CHAMBERS BOTTOM OF STONE: 467.22 BOTTOM OF CHAMBER: 467.72 TOP OF CHAMBER: 470.22 PROPOSED 8" HDPE PIPE L= 151 FT, SLOPE= 1.1% PROPOSED 8" HDPE PIPE L= 57 FT, SLOPE= 10.9% PROPOSED DI-2 RIM: 553.62 INV IN: 552.91 INV OUT: 552.12 PROPOSED DMH-2 RIM: 560.65 INV IN: 559.77 INV OUT: 559.15 PROPOSED 8" HDPE PIPE L= 238 FT, SLOPE= 9.8% PROPOSED DI-3 RIM: 529.62 INV IN: 528.89 INV OUT: 528.12 ROCK OUTLET PROTECTION PROPOSED SWALE PROPOSED FLOW SPREADER PROPOSED DI-1 RIM: 570.97 INV OUT: 569.47 PROPOSED DMH-1 RIM: 566.14 INV IN: 564.94 INV OUT: 564.64 PROPOSED 8" HDPE PIPE L= 56 FT, SLOPE= 8.1% PROPOSED DI-5 RIM: 500.17 INV IN: 499.31 INV OUT: 498.67 C DATE: SCALE: Sheet of No. Date Comments: Yorktown Heights, NY 10598 www.sitedesignconsultants.com Fax: (914) 962-7386 Land Planners Engineer: NYS Lic. No. 64431 Joseph C. Riina, P.E. 251-F Underhill Avenue, Civil Engineers (914) 962-4488 - SCALE: 1"=30'-0" COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW. SAFE DIG Before You Dig, Drill or Blast! CALL US TOLL FREE 811 or 1-800-962-7962 NY Industrial Code Rule 753 requires no less than two working days notice, but not more than ten days notice. www.digsafelynewyork.com F:\2021\21-22 THOMAS W. HANNIGAN (BOB DUBRAY)-UPLAND DR - MATT CARROLL\ENGINEERING\CAD\C3D-21-22 THOMAS W. HANNIGAN (BOB DUBRAY)\DWG\21-22 SITE PLAN 1-10-2024.DWG 1/11/2024 9:33:07 AM 1" = 30' DRAINAGE PLAN PREPARED FOR SITE PLAN Westchester County, NY CS 6-28-2021 0 ALBANY POST ROAD PROJECT LOCATION THOMAS HANNIGAN JR PROPERTY LINE / RIGHT OF WAY EXISTING STONE WALL PROPOSED GRADING EXISTING GRADING EXISTING SPOT GRADE PROPOSED RIP RAP AT PIPE END EXISTING TREE TO BE REMOVED CONSTRUCTION ENTRANCE LEGEND PROPOSED RETAINING WALLS PROPOSED STABILIZED PROPOSED LIMIT OF DISTURBANCE FD RD PROPOSED FOOTING DRAIN PROPOSED ROOF DRAIN EXISTING STONE WALLS TO BE REMOVED PROPOSED HOUSE AND DRIVE PROPOSED SOIL STOCKPILES PROPOSED SILT FENCE SS SS PROPOSED PERMANENT SWALE 8/30/2022 Eng. comments 21-22 PROJECT # NOTE: 1. THIS IS NOT A SURVEY. ALL SURVEY INFORMATION SHOWN ON THIS PLAN HAS BEEN TAKEN FROM SURVEY MAP PREPARED BY JOSEPH R LINK, L.S., DATED 1/22/21. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY. Town of Croton-on-Hudson 1/3/2023 WCHD comments TOWN STORMWATER NOTES: 1. INFILTRATION BEST PRACTICES SHALL BE DESIGNED IN ACCORDANCE WITH NYSDEC'S STORM WATER DESIGN MANUAL. DEEP TEST PITS AND PERCOLATION TESTS SHALL BE PERFORMED BY THE DESIGN PROFESSIONAL AND WITNESSED BY THE TOWN. FOR INFILTRATION PRACTICES, TEST PITS SHALL BE DUG 3-FT BELOW THE PROPOSE INFILTRATION LEVEL. 2. PRIOR TO BACKFILLING ANY STORM WATER BEST PRACTICE, CONTACT DOTS - ENGINEERING TO SCHEDULE AN INSPECTION. 3. PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY, A CERTIFICATION FROM THE LICENSED DESIGN PROFESSIONAL THAT ALL STORM WATER BEST MANAGEMENT PRACTICES WERE INSTALLED IN SUBSTANTIAL CONFORMANCE TO THE APPROVED PLANS ON FILE AND THAT THERE ARE NO ADVERSE IMPACTS TO ADJACENT AND ADJOINING PROPERTIES PERTAINING TO STORM WATER RUNOFF. 10/31/2023 Town comments 1/11/2024 Town comments P.O.B. Parcel II Formerly Parcel III PARCE PARCEL II TOWN OF CORTLANDT VILLAGE OF CROTON ON HUDSON S 46° 55' 05" W 100.35' STONE WALL STONE WALL STONE WALL STONE WALL WAS Bk 323-P76 ? Stream STONE WALL Bar-Way Frame Garage Deck Steps EXISTING DWELLING WO AND W VACANT LOT 1 Sty. Frame Wood Plat. Ent. Wood GLASS AND METAL FENCE Gate P.O.B.Parcel "1A" Pool PROPANE TANK COVER P.O.B. PT#6 DT#6 PT#4 DT#4 PT#5 DT#5 TP-3 IT-3 TP-4 IT-4 SS SS SS SS W FFE: 586.25 GFE: 583.35 PROPOSED SOIL STOCKPILE (TYP.) TOTAL LIMIT OF DISTURBANCE ±1.88 ACRES PROPOSED SILT FENCE (TYP.) PROPOSED STABILIZED CONSTRUCTION ENTRANCE PROPOSED EROSION BLANKETS (TYP.) D D C PROPOSED RESIDENCE 2 BEDROOM + 1 FUTURE BEDROOM SS SS C DATE: SCALE: Sheet of No. Date Comments: Yorktown Heights, NY 10598 www.sitedesignconsultants.com Fax: (914) 962-7386 Land Planners Engineer: NYS Lic. No. 64431 Joseph C. Riina, P.E. 251-F Underhill Avenue, Civil Engineers (914) 962-4488 - SCALE: 1"=30'-0" COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW. SAFE DIG Before You Dig, Drill or Blast! CALL US TOLL FREE 811 or 1-800-962-7962 NY Industrial Code Rule 753 requires no less than two working days notice, but not more than ten days notice. www.digsafelynewyork.com F:\2021\21-22 THOMAS W. HANNIGAN (BOB DUBRAY)-UPLAND DR - MATT CARROLL\ENGINEERING\CAD\C3D-21-22 THOMAS W. HANNIGAN (BOB DUBRAY)\DWG\21-22 SITE PLAN 1-10-2024.DWG 1/11/2024 9:33:07 AM 1" = 30' EROSION AND SEDIMENT CONTROL PLAN PREPARED FOR SITE PLAN Westchester County, NY CS 6-28-2021 0 ALBANY POST ROAD PROJECT LOCATION THOMAS HANNIGAN JR PROPERTY LINE / RIGHT OF WAY EXISTING STONE WALL PROPOSED GRADING EXISTING GRADING EXISTING SPOT GRADE PROPOSED RIP RAP AT PIPE END EXISTING TREE TO BE REMOVED CONSTRUCTION ENTRANCE LEGEND PROPOSED RETAINING WALLS PROPOSED STABILIZED PROPOSED LIMIT OF DISTURBANCE FD RD PROPOSED FOOTING DRAIN PROPOSED ROOF DRAIN EXISTING STONE WALLS TO BE REMOVED PROPOSED HOUSE AND DRIVE PROPOSED SOIL STOCKPILES PROPOSED SILT FENCE SS SS PROPOSED PERMANENT SWALE 8/30/2022 Eng. comments 21-22 PROJECT # NOTE: 1. THIS IS NOT A SURVEY. ALL SURVEY INFORMATION SHOWN ON THIS PLAN HAS BEEN TAKEN FROM SURVEY MAP PREPARED BY JOSEPH R LINK, L.S., DATED 1/22/21. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY. Town of Croton-on-Hudson 1/3/2023 WCHD comments 10/31/2023 Town comments 1/11/2024 Town comments S 46° 55' 05" W 100.35' STONE WALL STONE WALL STONE WALL STONE WALL WAS Bk 323-P76 ? Stream STONE WALL Bar-Way Frame Garage Deck Steps EXISTING DWELLING WO AND W 1 Sty. Frame Wood Plat. Ent. Wood GLASS AND METAL FENCE Gate Pool PROPANE TANK COVER W FFE: 586.25 GFE: 583.35 C PROPOSED RESIDENCE 2 BEDROOM + 1 FUTURE BEDROOM C DATE: SCALE: Sheet of No. Date Comments: Yorktown Heights, NY 10598 www.sitedesignconsultants.com Fax: (914) 962-7386 Land Planners Engineer: NYS Lic. No. 64431 Joseph C. Riina, P.E. 251-F Underhill Avenue, Civil Engineers (914) 962-4488 - SCALE: 1"=30'-0" NOTE: 1. THIS IS NOT A SURVEY. ALL SURVEY INFORMATION SHOWN ON THIS PLAN HAS BEEN TAKEN FROM SURVEY MAP PREPARED BY JOSEPH R LINK, L.S., DATED 1/22/21. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY. COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW. SAFE DIG Before You Dig, Drill or Blast! CALL US TOLL FREE 811 or 1-800-962-7962 NY Industrial Code Rule 753 requires no less than two working days notice, but not more than ten days notice. www.digsafelynewyork.com F:\2021\21-22 THOMAS W. HANNIGAN (BOB DUBRAY)-UPLAND DR - MATT CARROLL\ENGINEERING\CAD\C3D-21-22 THOMAS W. HANNIGAN (BOB DUBRAY)\DWG\21-22 SITE PLAN 1-10-2024.DWG 1/11/2024 9:33:07 AM 1" = 30' SLOPE DISTURBANCE PLAN PREPARED FOR SITE PLAN Westchester County, NY CS 6-28-2021 0 ALBANY POST ROAD PROJECT LOCATION THOMAS HANNIGAN JR 8/30/2022 Eng. comments 21-22 PROJECT # SLOPE DISTURBANCE SLOPE 15% - 25% 25% - 35% > 35% Town of Croton-on-Hudson 1/3/2023 WCHD comments 10/31/2023 Town comments VILLAGE OF CROTON ON HUDSON TOWN OF CORTLANDT 13,376 SF = 0.31 AC 13,994 SF = 0.32 AC 9,910 SF = 0.23 AC 3,228 SF = 0.07 AC 11,620 SF = 0.27 AC 2,786 SF = 0.06 AC COMPLIES EXCEEDS BY 2,908 SF COMPLIES 1/11/2024 Town comments S 80° 29' 10" E 46.41' S 79° 50' 00" E 57.91' S 62° 43' 30" E 56.74' S 58° 44' 20" E 64.46' S 59° 29' 10" E 33.89' S 62° 28' 00" E 22.00' S 60° 11' 00" E 98.98' S 56° 32' 00" E 38.07' 225.18' S 39 S 41° 00' 10" W 50.11' S 42° 13' 40" W 152.32' S 39° 53' 40" W 74.29' S 42° 35' 00" W 66.86' S 43° 46' 00" W 90.27' S 43° 55' 40" W 96.58' S 46° 55' 05 100.35' N 48° 12' 20" W 189.42' N 51° 14' 20" W 31.15' WALL STONE WALL STONE WALL STONE WALL S 70° 00' 00" W 52.92' N 78° 32' 10" W 28.21' 54.81' 35.64' ? 30.5' G PARKING AREA Remains of Foundation Stone Ret. Wall rame Garage k Stone Mas. Ret. Wall STONE ASPHALT DRIVEWAY ASPHALT PARKING AREA EXISTING DWELLING PATH PATH S 58° 50 100.3 Pin Found ? Stone Ret. Wall DI-#1 S 60° 11' 00" E PT#6 DT#6 PT#4 DT#4 PT#5 DT#5 TP-3 IT-3 W PROPOSED WELL FFE: 586.25 GFE: 583.35 6' O.C. 100' SEPARATION TO OWTS UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE 47' 47' 47' 47' 10' SEPTIC TANK SETBACK 20' SEPTIC SYSTEM SETABCK 10' SEPTIC SYSTEM SETBACK 47' 47' 47' 47' RD RD RD RD RD RD RD RD RD RD RD RD RD RD FD FD ROOF DRAIN FOOTING DRAIN 10' SEPTIC SYSTEM SETBACK D D C 72.9' 59.7' 4" SOLID PVC PIPE L = 124 FT; S = 14.9% MIN 24" WIDE SEPTIC TRENCH 6' O.C. WITH A 4" PERFORATED PIPE (TYP.) TOTAL LENGTH = 188 FT. 100% SSDS FUTURE EXPANSION P/C CONC. JUNCTION BOX (TYP.) PROPOSED CLEANOUT (TYP.) O' TO 3' R.O.B. GRAVEL FILL FOR GRADING PURPOSES 1,000 GAL. P/C CONC. SEPTIC TANK 4" DIA. SDR 35 PVC PIPE L = 10 FT; S = 2% MIN 4" SOLID PVC PIPE L = 79 FT; S = 2.5% ELECTRIC LINE LOCATION 50' MIN TO OWTS PROPOSED RESIDENCE 2 BEDROOM + 1 FUTURE BEDROOM 25.0' MIN. TO OWTS C DATE: SCALE: Sheet of No. Date Comments: Yorktown Heights, NY 10598 www.sitedesignconsultants.com Fax: (914) 962-7386 Land Planners Engineer: NYS Lic. No. 64431 Joseph C. Riina, P.E. 251-F Underhill Avenue, Civil Engineers (914) 962-4488 - SCALE: 1"=30'-0" COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW. SAFE DIG Before You Dig, Drill or Blast! CALL US TOLL FREE 811 or 1-800-962-7962 NY Industrial Code Rule 753 requires no less than two working days notice, but not more than ten days notice. www.digsafelynewyork.com F:\2021\21-22 THOMAS W. HANNIGAN (BOB DUBRAY)-UPLAND DR - MATT CARROLL\ENGINEERING\CAD\C3D-21-22 THOMAS W. HANNIGAN (BOB DUBRAY)\DWG\21-22 SITE PLAN 1-10-2024.DWG 1/11/2024 9:33:07 AM 1" = 30' SEPTIC PLAN PREPARED FOR SITE PLAN Westchester County, NY CS 6-28-2021 Town of Croton-on-Hudson 0 ALBANY POST ROAD PROJECT LOCATION THOMAS HANNIGAN JR PRIVATE DRILLED WELL CONSTRUCTION REQUIREMENTS: 1. All water supply drilled wells may not be constructed without a valid permit issued by the WCHD. Wells shall constructed in accordance with NYSDOH and WCHD standards. 2. Wells must be sited to meet all minimum restrictive distances. Wells must be sited as per plan. Any deviation must be approved by the Engineer and, if required, by the WCHD. 3. There are no sources of contamination within 200' of the proposed well (where new wells are proposed). 4. The top of the well must be 18" above finished grade which shall slope away in all directions to provide positive drainage. 5. Minimum well yield shall be 5 gpm based on a 6 hour pump test and have a minimum 42 gallon pressure tank. Yield tests below 5 gpm will require a special design(see WCHD standards). Well yields below 2 gpm are not acceptable.If a well yield of less than 5 gpm is encountered, contact the WCHD immediately. 6. Well locations shown on plan are based on setback requirments and does not guarantee adequate water supply. A hydrogeologist should be consulted for conformation of water supply, if desired. 7. Well shall be installed by a New York State Department of Environmental Conservation Registered well driller. 8. Drilled well to be sampled and tested in accordance with WCDOH Private well testing Law. MINIMUM RESTRICTIVE DISTANCES TO WELL: 1. Property Line 10 feet 2. Sewage System Tankage 50 feet 3. Foundation 10 feet 4. Swimming Pools 10 feet 5. Watercourse or Waterbody 50 feet 6. Absorption Trench 100 feet; 200 feet general path of drainage 7. Seepage Pit 150 feet; 200 feet general path of drainage 8. Tri-gallery, 4x4 150 feet; 200 feet general path of drainage 9. Flow Diffusor 100 feet; 200 feet general path of drainage HEALTH DEPARTMENT SEPTIC SCHEDULE REMARKS APPLICATION RATE (GPD/SF) MIN. DESIGN RATE NO. OF BEDROOMS DESIGN FLOW RATE REQD. TRENCH LENGTH 1,296 S.F. TP-#4 TP-#6 TP-#5 8" T.SOIL, 8"-48" BR. MED. COMP. SANDY LOAM, 48"-84 MD FINE SANDS MIXED W/ GRAVEL OR COBBLES, @84" NO ROCK, NO GW 306,485 S.F. 5.2 % 7'-0" 7'-0" 7'-0" PT-5 PT-4 6 - 7 MIN. 8 - 10 MIN. DEEP TEST PIT DESCRIPTION PERCENT SLOPE AREA PERC TEST NO. PERC. RATE (MIN/IN) TOTAL DEPTH DEPTH TO WATER DEPTH TO ROCK S.S.T.A. AREA (S.F.) LOT AREA (S.F.) TEST HOLE NO. 0.9 8 -10 MIN. DESIGN DATA 2 BRM 330 GPD 184 LF DEPTH VOLUME DEPTH LENGTH BANK RUN FILL CURTAIN DRAIN TANK SIZE 1,000 GAL 0-3 FT ±3,888 FT³ PT-6 6 - 7 MIN. B CsD ChB CHARLTON B SOILS CLASSIFICATIONS TYPE NAME DESCRIPTION HYDROLOGICAL GROUP CrC VERY ROCKY CHARLTON-CHATFIELD B 8" T.SOIL, 8"-48" BR. MED. COMP. SANDY LOAM, 48"-84 MD FINE SANDS MIXED W/ GRAVEL OR COBBLES, @84" NO ROCK, NO GW 8" T.SOIL, 8"-48" BR. MED. COMP. SANDY LOAM, 48"-84 MD FINE SANDS MIXED W/ GRAVEL OR COBBLES, @84" NO ROCK, NO GW CHATFIELD-CHARLTON FINE SANDY LOAM VERY ROCKY SITE DATA: OWNER: THOMAS HANNIGAN JR 0 ALBANY POST ROAD CROTON-ON-HUDSON, NY 10520 PROJECT LOCATION: 0 ALBANY POST ROAD CROTON- ON -HUDSON, NY, 10520 EXISTING TOWN ZONING: CORTLANDT: R-10. CROTON-ON-HUDSON: R-60 PROPOSED USE: CORTLANDT: R-10. CROTON-ON-HUDSON: R-60 TOWN TAX MAP DATA: SECTION 67.8, BLOCK 2, LOT 1 SITE AREA : 7.06 ACRES (307,641 SF) SEWAGE FACILITIES: SUBSURFACE SEWAGE TREATMENT SYSTEM WATER FACILITIES: DRILLED WELL WATERSHED: PEEKSKILL / HAVERSTRAW BAY LOCATION MAP NOT TO SCALE SEPTIC DESIGN AREA: SLOPE EXISTING EXPANSION SYSTEM AREA 10.0% PROPOSED EXPANSION SYSTEM AREA 5.8% 8/30/2022 Eng. comments 21-22 PROJECT # UPLAND ROAD HOLLIS LANE MT. AIRY RD W NOTE: 1. THIS IS NOT A SURVEY. ALL SURVEY INFORMATION SHOWN ON THIS PLAN HAS BEEN TAKEN FROM SURVEY MAP PREPARED BY JOSEPH R LINK, L.S., DATED 1/22/21. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY. SEPARATION DISTANCES FROM WASTEWATER SOURCES WASTEWATER SOURCES HOUSE SEWER SEPTIC TANK EFFLUENT LINE / FORCE MAIN DISTRIBUTION BOX / JUNCTION BOX ABSORPTION FIELD (F) SEEPAGE PIT DRY WELL (D) ROOF & FOOTINGS ROADS & DRIVEWAY DRILLED WELL OR SECTION LINE (G) (FT) TO STREAM LAKE WATERCOURSE (B) OR WETLAND (FT) PROPERTY LINES (FT) 25' CIP 50' 50' 100' 100' (A) 150' (A) 50' 25' 100' 50' 50' 25' 10' 100' 100' 10' 10' 10' 10' 10' 10' NOTES: A. Wells located in the general path of drainage of a SSTS must be located 200 feet or more away. All public water supply wells must be 200 feet from absorption fields or seepage pits. B. Mean high water mark of defined stream or lake. C. Drywells are not allowed above OWTS (drywells, Stormwater infiltrator or other subsurface stormwater infiltrator units) D. For slab on grade foundations with no drains, distance can be reduced in half. E. For all systems involving placement of fill, separation disctances are measured from the toe of slope of the fill. F. Closest part of OWTS shall be located at least ten (10) feet from any water service line (1.e. - PWS main, water service connection, well). G. Recommended H. Septic tanks are not permitted beneath raised decks and require a minimum of five (5) feet separation from deck piers (sonotubes) ADDITIONAL SEPERATION DISTANCES FROM SSTA TO: 1. Piped Drainage 25 feet 2. Open Channel Drainage 50 feet 3. Curtain Drain (upgrade from SSTS) 15 feet 4. Curtain Drain (downgrade from SSTS) 50 feet 5. Catch Basin 50 feet 6. Driveway 5 feet 7. Stormwater Basin 100 feet (high water elevation) 8. Above Ground Well 10 feet 9. Deck with Pilings / sonotube 10 feet 10. Slab on Grade Foundation 10 feet 11. Roof & Fotting Drain Discharge Pipe 10 feet DRAINAGE DITCH/RAIN GARDEN (H) (FT) 10' 10' 10' 20' 20' 20' 10' INGROUND POOL (FT) 10' 20' 10' 20' 35' 50' 20' DWELLING (FT) 3' 10' (H) 10' 20' (D) 20' (D) 20' (D) 20' 50' OTHER 100' 25' 20' 10' 20' WCHD NOTES: 1. The design professional shall supervise the construction of the SSTS and make an open works inspection. 2. Within 24-hours of the completion of the SSTS, the design professional must notify the Westchester County Department of Health that the SSTS is ready for inspection by submitting a completed request for an open works inspection on the appropriate form to the Department. 3. There are no sources of contamination within 200 feet of the proposed well. 4. There shall be no trees within 10 feet of the OWTS. 5. That no backfilling of a completed OWTS can occur until after it has been inspected and accepted by the Westchester County Department of Health. 6. After backfilling the OWTS, the area shall be covered with a minimum of 4 inches of clean top soil seeded and mulched. 7. There are no DEC wetlands, streams, ponds etc. with in 200' of SSTS. There are no reservior/reservior stems or controlled lake with in 500' of SSTS. 8. There is 1.88 AC of proposed disturbance. 9. There are no existing or proposed wells within 200 feet of the proposed OWTS. 10.There are no existing SSTS within 200 ft of well unless otherwise shown on this plan. 11.Estimated construction and completion date: December 2022 to December 2023. SEPTIC CONSTRUCTION REQUIREMENTS: General 1. The installation of the OWTS shall be in accordance with the most recently enacted Rules and Regulations for the Design and Construction of Residential Subsurface Sewage Treatment Systems and Drilled Wells in Westchester County, NY. 2. The Westchester County Health Department approval expires one year from the date on the approval stamp and is required to be renewed on or before the expiration date. The approval is revocable for cause or may be amended or modified when considered necessary by the department. 3. All work performed including new installations, repairs, relocations, etc. shall have all current required permits or approvals. 4. No regrading in SSTS area except as shown on this plan. 5. Boulders, if any on surface of ground shall be cleared away prior to construction of the SSTS. 6. Prior to any excavation all underground utilities must be located. Call 1-800-962-7962. House Connection & Tanks 7. The house sewer to tank connection shall be a minimum 4" diameter at a minimum slope of 2.0%. The pipe shall be cast iron, ductile iron, or sewer grade PVC. All materials shall comply to the NYS Uniform Fire Prevention and Building Code(9NYCRR). The house trap shall have a cleanout and fresh air intake having a minimum diameter of one-half. 8. If cover exceeds 2 ft over any installed tank or chamber, a manhole and collar to grade is required for access. Minimum requirement of 6-12" of cover over all tanks and chambers. Absorption Fields 9. Absorption Fields to be constructed of 4" perforated PVC pipe or equal, encased in crushed stone over pipe with standard precast junction boxes at influent connection and 4" solid PVC pipe running from septic tank outlet to and between junction boxes. 10.Minimum Trench Depth = 18", Trench Width = 24". 11.Total depth of stone in trench = 12" (washed gravel 3/4" to 1 1/2"). 12.Maximum backfill over trench - 14". 13.All septic field laterals shall be of equal length (60' max. w/o dosing and 100' max. if dosed) and parallel to contours at a slope rate of 1/16" per foot. 14.All pipes connecting to tank and boxes shall be cut flush with the inside wall of box. 15.PVC pipe to meet minimum standards of ASTM D-2729. 16.Absorption trenches shall not be installed or backfilled in wet, frozen, frost or snow covered soils. 17.Backfill material for the trenches shall contain no particles with any dimension greater than 4". Backfill septic material must be inspected and approved by the WCHD before installation. 18.No laterals shall be placed beneath a driveway or paved areas. 19.There shall be no trees within 10 feet of the absrption fields. 20.End caps to be placed at end of all 4" perforated P.V.C. pipe in absorption fields. Fill Section 21.R.O.B. gravel and impervious material to be inspected and approved by the Design Engineer prior to installation of the proposed system. Fill shall contain no particles greater than 4" in diameter. Fill shall be placed over expansion area where shown as required by WCHD. 22.Fill stabilization may not be achieved by mechanical compaction Only by a natural settling, for a period required by W.C.H.D. which may include a freeze-thaw cycle. Percolation tests must be done in stabilized fill and must meet the design rate. 23.Prior to submission of Certificate of Compliance to WCHD, fill section must be stabilized with grass seed and hay cover. GENERAL NOTES: 1. A written permit and/or approval issued by the WCHD to construct an individual sewerage system shall terminate and therefore be null and void unless construction is undertaken within one (1) year of the date of issuance. 2. If for any reason the approved construction plan cannot be followed, a revised plan must be prepared, submitted and approved by the WCHD. 3. All construction to be in accordance with these plans and last revised set of WCHD Rules and Regulations 4. All SSTS and wells shall be located in the exact location as shown on this plan unless otherwise authorized by the WCHD. 5. Existing wells and SDS shown on this map were installed prior to approval date and are not part of this approval. 6. All laundry and kitchen wastes shall be discharged into the SSTS. 7. No cellar, roof or footing drains shall be discharged into the SSTS or within 25' of any well. 8. Within 24-hours of the completion of the OWTS, the design professional must notify the Westchester County Department of Health (WCDH) that the OWTS is ready for inspection by submitting a completed request for an open works inspection on the appropriate form to WCDH. 9. Prior to commencement of operation, a Certificate of Compliance must be applied for and received from WCHD. 10.The proposed SSDS shall be isolated and protected against damage by erosion, storage of earth or materials, displacement,compaction or other adverse physical change in the characteristics of the soil or in the drainage of area 11.Proposed septic area to be kept free of traffic and debris during house construction and install adequate drainage to prevent erosion after septic is installed. 12.Any modifications or deviations from this plan must be approved by the Design Engineer and WCHD prior to construction. 13.The Engineer shall not be held responsible or held accountable for the integrity of any structures constructed or under construction prior to the approval of the plans. 14.All conditions, locations, and dimensions shall be field verified and the Engineer shall be immediately notified of any discrepancies. 15.All written dimensions on the drawings shall take precedence over any scaled dimensions. 16.The Design Engineer shall supervise the construction of the SSTS and make an open works inspection. 17.The Design Engineer disclaims any liability for damage or loss incurred during or after construction. 18.The proposed OWTS shall be installed by a Westchester County licensed septic contractor. Well shall be installed by a New York State Department of Environmental Conservation Registered well driller. 19.Contractor to verify all substructures encountered during construction. 20.The Contractor shall supervise and direct the work using his best skill and attention. He shall be solely responsible for all construction means, methods, techniques, sequences, and procedures and for coordinating all portions of the work under the contract. 21.The Contractor shall be responsible to the owner for the acts and omissions of his employees, subcontractors, and their agents and employees, and any other persons performing any of the work under a contract with the Contractor. 22.Unauthorized alterations or additions to this drawing is a violation of Section 7209 (2) of the New York State Education Law. 23.Survey and topographical information shown hereon prepared by surveyor:Joseph R. Link, L.S. + 1 FUTURE BRM 1/3/2023 WCHD comments 10/31/2023 Town comments 1/11/2024 Town comments S 88° 55' 45" E 67.06' N 34° 39' 55" E 14.58' N 42° 31' 55" E 102.19' N 27° 39' 35" E 32.77' N 38° 19' 15" E 77.45' S 88° 55' 45" E 67.06' S 70° 39' 25" E 28.82' S 74° 23' 05" E 22.00' S 70° 56' 05" E 23.25' S 72° 06' 05" E 98.98' S 68° 27' 05 38.07' S 27° 34' 55" W 38.39' S 29° 05' 05" W 50.11' S 30° 18' 35" W 152.32' S 27° 58' 35" W 74.29' S 30° 39' 55" W 66.86' S 31° 50' 55" W 90.27' S 32° 00' 35" W 96.58' N 60° 07' 25" W 189.42' N 63° 09' 25" W 31.15' N 47° 03' 05" W 576.36' N 78° 32' 10" W S 80° 29' 10" E 46.41' S 79° 50' 00" E 57.91' S 62° 43' 30" E 56.74' S 58° 44' 20" E 64.46' S 59° 29' 10" E 33.89' S 62° 28' 00" E 22.00' S 60° 11' 00" E 98.98' S 56° 32' 00" E 38.07' N 70 225.18' S 39° 30' 00" W 38.39' S 41° 00' 10" W 50.11' S 42° 13' 40" W 152.32' S 39° 53' 40" W 74.29' S 42° 35' 00" W 66.86' S 43° 46' 00" W 90.27' S 43° 55' 40" W 96.58' S 46° 55' 05" W 100.35' N 48° 12' 20" W 189.42' N 51° 14' 20" W 31.15' N 35° 08' 00" W 576.36' 34' 40" E 32.77' N 50° 14' 20" E 77.45' N 77° 00' 40" W 67.06' STONE WALL STONE WALL STONE WALL STONE WALL S 71° 24' 15" E 33.89' S 70° 39' 25" E 28.82' N 45° 00' 00" W 50.00' S 70° 00' 00" W 52.92' 32.00' N 78° 32' 10" W 28.21' 230.75' 54.81' 35.64' WAS Bk 323-P76 ? 30.5' 30' GRAVEL PARKING AREA Stream Remains of Foundation Stone Ret. Wall STONE WALL Bar-Way Frame Garage Deck Steps ASPHALT Stone Mas. Ret. Wall STONE ASPHALT DRIVEWAY ASPHALT PARKING AREA EXISTING DWELLING PATH PATH PATH PATH WO AND W S 58° 50' 10" W 100.35' S 62° 0 50.0 1 Sty. Frame Pin Found ? Stone Ret. Wall Wood Plat. N 54° 27 102.19 S 89° 27' 00" E 6.25' N 46° 35' 00" E 14.58' Ent. Wood Gate Gate Gate S Re GLASS AND METAL FENCE Gate Pool PROPANE TANK COVER RETAINING WALL S 78° 32' 10" E 262.75' PT#6 DT#6 PT#4 DT#4 PT#5 DT#5 TP-3 IT-3 TP-4 IT-4 VILLAGE OF CROTON-ON HUDSON VILLAGE OF CROTON-ON HUDSON TOWN OF CORTLANDT TOWN OF CORTLANDT W FFE: 586.25 GFE: 583.35 UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE UE D D TREE (TYP.) TOTAL LIMIT OF DISTURBANCE ±2.12 ACRES C 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00 12+00 12+35.28 PROPOSED RESIDENCE 2 BEDROOM + 1 FUTURE BEDROOM C 3128 3126 DATE: SCALE: Sheet of No. Date Comments: Yorktown Heights, NY 10598 www.sitedesignconsultants.com Fax: (914) 962-7386 Land Planners Engineer: NYS Lic. No. 64431 Joseph C. Riina, P.E. 251-F Underhill Avenue, Civil Engineers (914) 962-4488 - SCALE: 1"=30'-0" COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW. SAFE DIG Before You Dig, Drill or Blast! CALL US TOLL FREE 811 or 1-800-962-7962 NY Industrial Code Rule 753 requires no less than two working days notice, but not more than ten days notice. www.digsafelynewyork.com F:\2021\21-22 THOMAS W. HANNIGAN (BOB DUBRAY)-UPLAND DR - MATT CARROLL\ENGINEERING\CAD\C3D-21-22 THOMAS W. HANNIGAN (BOB DUBRAY)\DWG\21-22 SITE PLAN 1-10-2024.DWG 1/11/2024 9:33:07 AM 1" = 30' TREE DISTURBANCE PLAN PREPARED FOR SITE PLAN Westchester County, NY CS 6-28-2021 0 ALBANY POST ROAD PROJECT LOCATION THOMAS HANNIGAN JR 8/30/2022 Eng. comments 21-22 PROJECT # NOTE: 1. THIS IS NOT A SURVEY. ALL SURVEY INFORMATION SHOWN ON THIS PLAN HAS BEEN TAKEN FROM SURVEY MAP PREPARED BY JOSEPH R LINK, L.S., DATED 1/22/21. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY. Town of Croton-on-Hudson 1/3/2023 WCHD comments 10/31/2023 Town comments 1/11/2024 Town comments DATE: SCALE: Sheet of No. Date Comments: Yorktown Heights, NY 10598 www.sitedesignconsultants.com Fax: (914) 962-7386 Land Planners Engineer: NYS Lic. No. 64431 Joseph C. Riina, P.E. 251-F Underhill Avenue, Civil Engineers (914) 962-4488 - COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW. F:\2021\21-22 THOMAS W. HANNIGAN (BOB DUBRAY)-UPLAND DR - MATT CARROLL\ENGINEERING\CAD\C3D-21-22 THOMAS W. HANNIGAN (BOB DUBRAY)\DWG\21-22 SITE PLAN 1-10-2024 WITH TREES.DWG 5/20/2021 3:31:44 PM 1" = 30' TREE DISTURBANCE PLAN DETAILS PREPARED FOR SITE PLAN Westchester County, NY CS 6-28-2021 0 ALBANY POST ROAD PROJECT LOCATION THOMAS HANNIGAN JR Tag Common Name Scientific Name DBH Cond. Within LOD? Remove? Notes Black birch Betula lenta Dead Yes Yes Standing dead tree. Remove based on condition Black birch Betula lenta Dead Yes Yes Standing dead tree. Remove based on condition Black birch Betula lenta Dead No Yes Remove based on condition Black birch Betula lenta Dead No Yes Remove based on condition Black birch Betula lenta Dead Yes Yes Remove based on condition White ash Fraxinus americana Dead Yes Yes Remove based on condition Black cherry Prunus serotina Dead Yes Yes Remove based on condition Black birch Betula lenta Dead Yes Yes Remove based on condition Black cherry Prunus serotina Dead No Yes Remove based on condition Black birch Betula lenta Dead Yes Yes Remove based on condition Black birch Betula lenta Dead Yes Yes Remove based on condition Black birch Betula lenta Dead No Yes Remove based on condition Black birch Betula lenta Dead Yes Yes Remove based on condition Black birch Betula lenta Dead Yes Yes Remove based on condition Ash Fraxinus Dead No Yes Standing dead tree. Remove based on condition Red maple Acer rubrum Dead Yes Yes Remove based on condition Black birch Betula lenta Dead No Yes Dead tree leaning over proposed drive. Remove based on condition Black birch Betula lenta Dead Yes Yes Remove based on condition Black birch Betula lenta Dead No Yes Remove based on condition Black birch Betula lenta Dead Yes Yes Remove based on condition Black birch Betula lenta Dead No Yes Remove based on condition Black birch Betula lenta Dead No Yes Standing dead tree leans toward proposed drive. Remove based on condition Black birch Betula lenta Dead Yes Yes Remove based on condition Black birch Betula lenta Dead Yes Yes Remove based on condition Black birch Betula lenta Dead Yes Yes Remove based on condition Black birch Betula lenta Dead No Yes Remove based on condition Black birch Betula lenta Dead Yes Yes Remove based on condition Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair No Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Norway maple Acer platanoides Fair Yes Yes Invasive species Sugar maple Acer saccharum Fair Yes Yes None Black birch Betula lenta Fair No Yes Basal decay Black birch Betula lenta Fair Yes Yes Basal decay Black birch Betula lenta Fair Yes Yes None Japanese falsecypress Chamaecyparis pisifera Fair No Yes None Black birch Betula lenta Fair No Yes None Japanese falsecypress Chamaecyparis pisifera Fair No Yes None Japanese falsecypress Chamaecyparis pisifera Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black cherry Prunus serotina Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Norway maple Acer platanoides Fair Yes Yes None Black birch Betula lenta Fair Yes Yes Column of decay along trunk Flowering dogwood Cornus florida Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes Codominant near base. Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No Yes None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black cherry Prunus serotina Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No Codominant at base American elm Ulmus americana Fair No No None Black oak Quercus velutina Fair No Yes None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black cherry Prunus serotina Fair No No None Red oak Quercus rubra Fair No No None Black birch Betula lenta Fair No Yes None Sugar maple Acer saccharum Fair Yes Yes None Hornbeam Carpinus caroliniana Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Hornbeam Carpinus caroliniana Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Hornbeam Carpinus caroliniana Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair No No None Hornbeam Carpinus caroliniana Fair No No None Hornbeam Carpinus caroliniana Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None American elm Ulmus americana Fair No No None Sweet cherry Prunus avium Fair No No None Sweet cherry Prunus avium Fair No No None Red maple Acer rubrum Fair No No None Black birch Betula lenta Fair No No None Flowering dogwood Cornus florida Fair No No None American elm Ulmus americana Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black cherry Prunus serotina Fair No No None Flowering dogwood Cornus florida Fair No No None Flowering dogwood Cornus florida Fair No No None Black cherry Prunus serotina Fair No No None Black birch Betula lenta Fair No No None Hornbeam Carpinus caroliniana Fair No No None American elm Ulmus americana Fair No No None Norway maple Acer platanoides Fair Yes Yes Invasive species Black birch Betula lenta Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Norway maple Acer platanoides Fair Yes Yes Invasive species Hornbeam Carpinus caroliniana Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Sugar maple Acer saccharum Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Norway maple Acer platanoides Fair No No Invasive species Hornbeam Carpinus caroliniana Fair Yes Yes None Black gum Nyssa sylvatica Fair No No None Hornbeam Carpinus caroliniana Fair No No None Hornbeam Carpinus caroliniana Fair Yes Yes None Black gum Nyssa sylvatica Fair No No None Sugar maple Acer saccharum Fair No No None White oak Quercus alba Fair No No None Norway maple Acer platanoides Fair No Yes Invasive species Black gum Nyssa sylvatica Fair No No None Red oak Quercus rubra Fair No Yes None Norway maple Acer platanoides Fair No No Invasive species Red oak Quercus rubra Fair No No None Red maple Acer rubrum Fair No No None White oak Quercus alba Fair No No None Sugar maple Acer saccharum Fair No No None Black cherry Prunus serotina Fair No No None Black cherry Prunus serotina Fair No No None Red oak Quercus rubra Fair Yes Yes None Black cherry Prunus serotina Fair No No None Red maple Acer rubrum Fair No No None Red maple Acer rubrum Fair No No None Red maple Acer rubrum Fair No No None Black cherry Prunus serotina Fair No No None Black cherry Prunus serotina Fair Yes Yes None Norway maple Acer platanoides Fair Yes Yes Invasive species Red maple Acer rubrum Fair Yes Yes None Black cherry Prunus serotina Fair Yes Yes None Red oak Quercus rubra Fair Yes Yes None Black birch Betula lenta Fair Yes Yes Codominant at 3 feet; 18 and 17 inches Black birch Betula lenta Fair Yes Yes None Red oak Quercus rubra Fair No No None Red maple Acer rubrum Fair No No None Red oak Quercus rubra Fair No No None Red oak Quercus rubra Fair No No None Red maple Acer rubrum Fair Yes Yes None Red oak Quercus rubra Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Red oak Quercus rubra Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Flowering dogwood Cornus florida Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Black cherry Prunus serotina Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Red oak Quercus rubra Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Red maple Acer rubrum Fair Yes Yes None Black birch Betula lenta Fair No Yes None Black cherry Prunus serotina Fair No No None Sugar maple Acer saccharum Fair No No None Black cherry Prunus serotina Fair No No None Black cherry Prunus serotina Fair Yes Yes None Red oak Quercus rubra Fair No No None Red oak Quercus rubra Fair No No None Red oak Quercus rubra Fair Yes Yes None Red maple Acer rubrum Fair Yes Yes None Red oak Quercus rubra Fair Yes Yes None Black cherry Prunus serotina Fair Yes Yes None Red oak Quercus rubra Fair Yes Yes None White oak Quercus alba Fair Yes Yes None Sugar maple Acer saccharum Fair No No None Red oak Quercus rubra Fair No Yes None Black cherry Prunus serotina Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Flowering dogwood Cornus florida Fair Yes Yes None Black cherry Prunus serotina Fair Yes Yes None Norway maple Acer platanoides Fair No No Invasive species. Removal an option Sugar maple Acer saccharum Fair No No None Black birch Betula lenta Fair No No None Red oak Quercus rubra Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Norway maple Acer platanoides Fair Yes Yes Invasive species Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Norway maple Acer platanoides Fair No Yes Invasive species Black birch Betula lenta Fair Yes Yes None Sugar maple Acer saccharum Fair No No None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Red oak Quercus rubra Fair No No None Red oak Quercus rubra Fair No No None Red oak Quercus rubra Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Red oak Quercus rubra Fair No No None Red oak Quercus rubra Fair No No None Black birch Betula lenta Fair Yes Yes None Shagbark hickory Carya ovata Fair Yes Yes None Red oak Quercus rubra Fair Yes Yes None Red oak Quercus rubra Fair No No None Sugar maple Acer saccharum Fair No No None Sugar maple Acer saccharum Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Red oak Quercus rubra Fair Yes Yes None Mockernut hickory Carya tomentosa Fair Yes Yes None Norway maple Acer platanoides Fair Yes Yes Invasive species Red maple Acer rubrum Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Mockernut hickory Carya tomentosa Fair No No None Red oak Quercus rubra Fair No Yes None Red oak Quercus rubra Fair No Yes None Red oak Quercus rubra Fair No No None Red oak Quercus rubra Fair No No None Norway maple Acer platanoides Fair No No Invasive species Mockernut hickory Carya tomentosa Fair No No None Red oak Quercus rubra Fair No No None Red oak Quercus rubra Fair No No None American elm Ulmus americana Fair Yes Yes None Red oak Quercus rubra Fair Yes Yes None Sugar maple Acer saccharum Fair No No None Red oak Quercus rubra Fair No No None Red maple Acer rubrum Fair No No None Norway maple Acer platanoides Fair No No Invasive species Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Red oak Quercus rubra Fair Yes Yes None Norway maple Acer platanoides Fair No No Invasive species Red oak Quercus rubra Fair No No None Red maple Acer rubrum Fair No Yes None Red maple Acer rubrum Fair No No None Red maple Acer rubrum Fair No No None Mockernut hickory Carya tomentosa Fair No No None Black cherry Prunus serotina Fair No Yes None Mockernut hickory Carya tomentosa Fair Yes Yes None Red oak Quercus rubra Fair No Yes Codominant at 3 feet. 22 and 18 inches Red oak Quercus rubra Fair No No None Shagbark hickory Carya ovata Fair No No None Black cherry Prunus serotina Fair No No None Red oak Quercus rubra Fair No No None Red oak Quercus rubra Fair No No None Red oak Quercus rubra Fair No No None Red oak Quercus rubra Fair Yes Yes None Norway maple Acer platanoides Fair Yes Yes Invasive species Ailanthus Ailanthus altissima Fair Yes Yes Invasive species Ailanthus Ailanthus altissima Fair Yes Yes Invasive species Red oak Quercus rubra Fair No No None Red oak Quercus rubra Fair No No None Black cherry Prunus serotina Fair No No None Bitternut hickory Carya cordiformis Fair Yes Yes None Bitternut hickory Carya cordiformis Fair Yes Yes None Bitternut hickory Carya cordiformis Fair Yes Yes None Bitternut hickory Carya cordiformis Fair Yes Yes None Black cherry Prunus serotina Fair No No None Red oak Quercus rubra Fair No No None Black cherry Prunus serotina Fair No No None Black cherry Prunus serotina Fair No Yes None Red oak Quercus rubra Fair Yes Yes None Bitternut hickory Carya cordiformis Fair Yes Yes None Bitternut hickory Carya cordiformis Fair Yes Yes None Bitternut hickory Carya cordiformis Fair Yes Yes None Black oak Quercus velutina Fair Yes Yes None Black cherry Prunus serotina Fair No No None Red maple Acer rubrum Fair No No None Black birch Betula lenta Fair No Yes None Red oak Quercus rubra Fair Yes Yes None Black cherry Prunus serotina Fair Yes Yes None Red oak Quercus rubra Fair Yes Yes None Red oak Quercus rubra Fair Yes Yes None Black cherry Prunus serotina Fair Yes Yes None Bitternut hickory Carya cordiformis Fair Yes Yes None White oak Quercus alba Fair Yes Yes None Bitternut hickory Carya cordiformis Fair No No None Black cherry Prunus serotina Fair No No None Red oak Quercus rubra Fair No Yes None Black oak Quercus velutina Fair No No None Red maple Acer rubrum Fair No No None Red maple Acer rubrum Fair No No None Red maple Acer rubrum Fair No No None Red maple Acer rubrum Fair No No None Red oak Quercus rubra Fair No No None Red oak Quercus rubra Fair No No None Red maple Acer rubrum Fair Yes Yes None Red maple Acer rubrum Fair Yes Yes None Red maple Acer rubrum Fair No No None Red oak Quercus rubra Fair No No None Red oak Quercus rubra Fair No No None Red oak Quercus rubra Fair No No None Red oak Quercus rubra Fair No No None Red maple Acer rubrum Fair No No None Red maple Acer rubrum Fair No Yes None Red maple Acer rubrum Fair No No None Red maple Acer rubrum Fair No No None Red maple Acer rubrum Fair No No None Red maple Acer rubrum Fair No No None Red maple Acer rubrum Fair No No None Red maple Acer rubrum Fair Yes Yes None Red maple Acer rubrum Fair Yes Yes None Red maple Acer rubrum Fair Yes Yes None Black cherry Prunus serotina Fair Yes Yes None Red maple Acer rubrum Fair Yes Yes None Red oak Quercus rubra Fair Yes Yes None Red maple Acer rubrum Fair No No None Bitternut hickory Carya cordiformis Fair No Yes None Mockernut hickory Carya tomentosa Fair No No None Mockernut hickory Carya tomentosa Fair No No None Mockernut hickory Carya tomentosa Fair No No None Red maple Acer rubrum Fair Yes Yes None Sycamore maple Acer pseudoplatanus Fair Yes Yes Invasive species Black cherry Prunus serotina Fair Yes Yes Codominant at base. 18 and 12 inches Bitternut hickory Carya cordiformis Fair No No None Mockernut hickory Carya tomentosa Fair No No None Mockernut hickory Carya tomentosa Fair No No None Red oak Quercus rubra Fair No Yes None Bitternut hickory Carya cordiformis Fair No No None Ailanthus Ailanthus altissima Fair No No Invasive species Mockernut hickory Carya tomentosa Fair Yes Yes None Mockernut hickory Carya tomentosa Fair Yes Yes None Mockernut hickory Carya tomentosa Fair No No None Mockernut hickory Carya tomentosa Fair No No None Red oak Quercus rubra Fair No Yes None Mockernut hickory Carya tomentosa Fair Yes Yes None Bitternut hickory Carya cordiformis Fair No No None Red oak Quercus rubra Fair No No None Red oak Quercus rubra Fair No No None Bitternut hickory Carya cordiformis Fair Yes Yes None Bitternut hickory Carya cordiformis Fair Yes Yes None Bitternut hickory Carya cordiformis Fair Yes Yes None Bitternut hickory Carya cordiformis Fair No No None Black birch Betula lenta Fair No No None Sugar maple Acer saccharum Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Red oak Quercus rubra Fair No Yes None Norway maple Acer platanoides Fair Yes Yes Invasive species Black birch Betula lenta Fair No Yes None Black birch Betula lenta Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Mockernut hickory Carya tomentosa Fair Yes Yes None Mockernut hickory Carya tomentosa Fair No Yes None Bitternut hickory Carya cordiformis Fair Yes Yes None Red maple Acer rubrum Fair No No None Sugar maple Acer saccharum Fair No No None White oak Quercus alba Fair No No None Black birch Betula lenta Fair No No None Sugar maple Acer saccharum Fair No No None Black birch Betula lenta Fair No No None Sugar maple Acer saccharum Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Bitternut hickory Carya cordiformis Fair No No None Black birch Betula lenta Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair No No None Hophornbeam Ostrya virginiana Fair No No None Sugar maple Acer saccharum Fair No No None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Sugar maple Acer saccharum Fair No No None Black birch Betula lenta Fair No No None Sugar maple Acer saccharum Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None White oak Quercus alba Fair No No None Black birch Betula lenta Fair Yes Yes None Norway maple Acer platanoides Fair Yes Yes Invasive species Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Red oak Quercus rubra Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Red oak Quercus rubra Fair No No None Norway maple Acer platanoides Fair Yes Yes Invasive species Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Shadbush Amelanchier canadensis Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Sugar maple Acer saccharum Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Red oak Quercus rubra Fair Yes Yes None Red oak Quercus rubra Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Black birch Betula lenta Fair No No None Red oak Quercus rubra Fair Yes Yes None Red oak Quercus rubra Fair No No None Red oak Quercus rubra Fair Yes Yes None Red oak Quercus rubra Fair No No None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No Yes None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair No No None Norway maple Acer platanoides Fair No No Invasive species Norway maple Acer platanoides Fair No No Invasive species Hornbeam Carpinus caroliniana Fair No No None Hornbeam Carpinus caroliniana Fair Yes Yes None Hornbeam Carpinus caroliniana Fair Yes Yes None Hornbeam Carpinus caroliniana Fair No No None Red oak Quercus rubra Fair Yes Yes None Sugar maple Acer saccharum Fair Yes Yes None Hornbeam Carpinus caroliniana Fair Yes Yes None Black cherry Prunus serotina Fair No No None Black birch Betula lenta Fair No No None Black cherry Prunus serotina Fair No No None Black birch Betula lenta Fair Yes Yes None Black cherry Prunus serotina Fair No Yes None Red oak Quercus rubra Fair Yes Yes None Red oak Quercus rubra Fair Yes Yes None Hornbeam Carpinus caroliniana Fair No No None Black birch Betula lenta Fair No No None Norway maple Acer platanoides Fair No No Invasive species Black birch Betula lenta Fair Yes Yes None Red maple Acer rubrum Fair Yes Yes None Buckthorn Rhamnus spp Fair No No Invasive species Black birch Betula lenta Fair Yes Yes None Flowering dogwood Cornus florida Fair No No None Japanese falsecypress Chamaecyparis pisifera Fair Yes Yes None Japanese falsecypress Chamaecyparis pisifera Fair Yes Yes None Black cherry Prunus serotina Fair No No None Red maple Acer rubrum Fair No No None Black gum Nyssa sylvatica Fair No No None Red maple Acer rubrum Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Red maple Acer rubrum Fair No No None Red maple Acer rubrum Fair No No None Flowering dogwood Cornus florida Fair Yes Yes None Black birch Betula lenta Fair Yes Yes None Sugar maple Acer saccharum Fair No No None Black birch Betula lenta Fair Yes Yes None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Hophornbeam Ostrya virginiana Fair No No None Red oak Quercus rubra Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Black birch Betula lenta Fair No No None Norway maple Acer platanoides Fair Yes Yes Invasive species Red oak Quercus rubra Fair No No None Japanese falsecypress Chamaecyparis pisifera Good Yes Yes None Hornbeam Carpinus caroliniana Good Yes Yes None Shagbark hickory Carya ovata Good No No None Bitternut hickory Carya cordiformis Good Yes Yes None Black birch Betula lenta Poor Yes Yes Codominant at 4 feet. Basal decay. Should be removed based on condition Black birch Betula lenta Poor No Yes Significant basal decay. Should be removed based on condition Black birch Betula lenta Poor Yes Yes Leans. Significant basal decay. Tree should be removed based on condition White ash Fraxinus americana Poor No Yes Emerald ash borer infested. Remove due to condition Black birch Betula lenta Poor Yes Yes Basal decay. One lead failed with decay. Remove based on condition Black birch Betula lenta Poor Yes Yes Significant basal decay. Little canopy remains. Remove based on condition Black cherry Prunus serotina Poor Yes Yes Remove based on condition Red oak Quercus rubra Poor Yes Yes Very little canopy remains. Remove based on condition White ash Fraxinus americana Poor Yes Yes Emerald ash borer infested. Remove based on condition Flowering dogwood Cornus florida Poor Yes Yes None Black cherry Prunus serotina Poor Yes Yes None Black cherry Prunus serotina Poor No Yes Significant basal decay. Remove based on condition Red maple Acer rubrum Poor Yes Yes Little foliage remains. Remove based on condition Black birch Betula lenta Poor Yes Yes Significant basal decay. Remove based on condition Black birch Betula lenta Poor Yes Yes Codominant at base. One lead dead. Remove based on condition Black birch Betula lenta Poor Yes Yes Significant basal decay from prior lead failure. Remove based on condition Black birch Betula lenta Poor Yes Yes Basal and trunk decay. Remove based on condition Black birch Betula lenta Poor Yes Yes Significant decay. Remove based on condition Black birch Betula lenta Poor Yes Yes Decay. Thin canopy. Remove based on condition Black birch Betula lenta Poor Yes Yes Significant basal decay. Almost dead. Remove based on condition 8/30/2022 Eng. comments 21-22 PROJECT # Town of Croton-on-Hudson 1/3/2023 WCHD comments 10/31/2023 Town comments 1/11/2024 Town comments DATE: SCALE: Sheet of No. Date Comments: Yorktown Heights, NY 10598 www.sitedesignconsultants.com Fax: (914) 962-7386 Land Planners Engineer: NYS Lic. No. 64431 Joseph C. Riina, P.E. 251-F Underhill Avenue, Civil Engineers (914) 962-4488 - EROSION AND SEDIMENT CONTROL DETAILS 06/28/21 AS NOTED CS NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED SILT FENCE DETAIL NOT TO SCALE E-1 WOOD OR METAL DRIVE POSTS AT 8'-0" O.C. MAX. ATTACH SILT FABRIC ON UPHILL SIDE OF POSTS AND BACKFILL OVER FABRIC PROPEX SILT STOP FABRIC OR APPROVED EQUAL SOIL TO BE RETAINED DIG 6"X6" TRENCH INSTALL FABRIC AND BACKFILL NATIVE SOIL EXISTING AREA TO BE PROTECTED FLOW FLOW 10' O.C. MAX. 36" MIN. FENCE POSTS, DRIVEN MIN. 16" INTO GROUND 16" MIN. HEIGHT OF FILTER ABOVE GROUND 6" MIN. EMBEDMENT PERSPECTIVE VIEW SECTION FLOW WOODEN FENCE POST 4 FT. LENGTH SUPPORT NET FILTER FABRIC ANCHOR FABRIC 6" BELOW EXISTING CHANNEL WHEN CROSSING STREAM CHANNEL 3'-0" MIN. 1'-0" MIN. PLAN VIEW: JOINING SECTIONS SECTION POSTS FASTENED TOGETHER EMBED FILTER CLOTH MIN. 6" INTO GROUND FLOW UNDISTURBED GROUND NOTES: 1. Filter cloth to be fastened securely to post: steel either t or u type or 2" hardwood posts at top and mid section. 2. When two sections of filter cloth adjoin each other they shall be overlapped by 6 inches and folded. Filter cloth shall be mirafi 100x, stabilinka t140n or approved equal 3. Maintenance shall be performed as needed and material removed when "bulges" develop in the silt fence. 4. Excavate 4 inch trench along the lower perimeter of the site. 5. Unroll a section at a time and position the post against the back (downstream) wall of the trench (net side away from direction of flow). 6. Drive the post into the ground until the netting is approximately 2 inches from the trench bottom. 7. Lay the toe-in flap of fabric onto the undisturbed bottom of the trench, backfill the trench and tamp the soil. Steeper slopes require an intercept trench. 8. Join sections as shown above. 20" MIN. 16" MIN. SYMBOL SOIL STOCKPILE DETAIL NOT TO SCALE E-3 NOTES: 1. Area chosen for stockpiling operations shall be dry and stable. 2. Maximum slope of stockpile shall be 1:2. 3. Upon completion of soil stockpiling, each pile shall be surrounded with either silt fencing or strawbales, then stabilized with vegetation or covered. 4. See detail for installation of silt fence. STRAWBALES OR SILT FENCE MIN. SLOPE MIN. SLOPE SLOPE OR LESS STABILIZE ENTIRE PILE WITH VEGETATION OR COVER SYMBOL SS STABILIZED CONSTRUCTION ENTRANCE DETAIL NOT TO SCALE E-2 EXISTING GRADE COMPACTED SUBGRADE FILTER CLOTH SECTION A-A 3" CLEAN STONE MOUNTABLE BERM (OPTIONAL SEE NOTE 5) 10'-0" MINIMUM WIDTH 6" MIN. EXISTING PAVEMENT 10'-0" 30'-0" MINIMUM EXISTING PAVEMENT 10'-0" 12'-0" MINIMUM 10'-0" MINIMUM START AT EXIST. PLAN INSTALLATION NOTES: 1. Stone size - use 3" min. Stone, or reclaimed or recycled concrete equivalent. 2. Length - as required, but not less than 50 feet (except on a single residence lot where a 30 foot minimum length would apply. 3. Thickness - not less than six (6) inches. 4. Width - 10 foot minimum, but not less than the full width at points where ingress or egress occur. 24 ft if single entrance to site. 5. Surface water - all surface water flowing or diverted toward construction entrances shall be piped across the entrance. If piping is impractical, a mountable berm with 5:1 slopes will be permitted. 6. Maintenance - the entrance shall be maintained in a condition which will prevent tracking or flowing of sediment onto public right of way this may require periodic top dressing with additional stone as conditions demand and repair and/or cleanouts of any measures used to trap sediment. All sediment spilled, dropped, washed or tracked onto public right of way must be removed immediately. 7. Washing - wheels shall be cleaned to remove sediment prior to entrance onto public right of way. When washing is required, it shall be done on an area stabilized with stone and which drains into an approved sediment trapping device. 8. Periodic inspection and needed maintenance shall be provided after each rain A A INLET PROTECTION DETAIL E-4 INLET 3" WASHED GRAVEL OVER INLET 3:1 SLOPE 2:1 SLOPE PLAN CONSTRUCTION ENTRANCE GRAVEL TEMPORARY SEDIMENT POOL 1 FT MIN 2 FT MAX SUBGRADE SYMBOL SECTION FILTER FABRIC OVER INELT INLET NOT TO SCALE INSP. INSP. INLET PROTECTION SILT FENCE CLEAN/ REPLACE REMOVE INSP. INSP. REMOVE REPLACE CLEAN DAILY WEEKLY MONTHLY AFTER RAINFALL NECESSARY TO MAINTAIN FUNCTION AFTER APPROVAL OF INSPECTOR MAINTENANCE SCHEDULE: GENERAL EROSION CONTROL NOTES: 1. Contractor shall be responsible for compliance with all sediment and erosion control practices. The sediment and erosion control practices are to be installed prior to any major soil disturbances, and maintained until permanent protection is established. Road surface flows from the site should be dissipated with tracking pad or appropriate measures during adjacent road shoulder regrading. Contractor is responsible for the installation and maintenance of all soil erosion and sedimentation control devices throughout the course of construction. 2. Catch basin inlet protection must be installed and operating at all times until tributary areas have been stabilized. When possible flows should be stabilized before reaching inlet protection structure. Timely maintenance of sediment control structures is the responsibility of the Contractor. 3. All structures shall be maintained in good working order at all times. The sediment level in all sediment traps shall be closely monitored and sediment removed promptly when maximum levels are reached or as ordered by the engineer. All sediment control structures shall be inspected on a regular basis, and after each heavy rain to insure proper operation as designed. An inspection schedule shall be set forth prior to the start of construction. 4. The locations and the installation times of the sediment capturing standards shall be as specified in these plans, as ordered by the Engineer, and in accordance with the latest edition of the "New York Standards and Specifications for Erosion and Sediment Control" (NYSSESC). 5. All topsoil shall be placed in a stabilized stockpile for reuse on the site. All stockpile material required for final grading and stored on site shall be temporarily seeded and mulched within 7 days. Refer to soil stockpile details. 6. Any disturbed areas that will be left exposed more than 7 days and not subject to construction traffic, shall immediately receive temporary seeding. Mulch shall be used if the season prevents the establishment of a temporary cover. Disturbed areas shall not be limed and fertilized prior to temporary seeding. 7. All disturbed areas within 500 feet of an inhabited dwelling shall be wetted as necessary to provide dust control. 8. The contractor shall keep the roadways within the project clear of soil and debris and is responsible for any street cleaning necessary during the course of the project. 9. Sediment and erosion control structures shall be removed and the area stabilized when the drainage area has been properly stabilized by permanent measures. 10. All sediment and erosion control measures shall be installed in accordance with current edition of NYSSESC. 11. All regraded areas must be stabilized appropriately prior to any rock blasting, cutting, and/or filling of soils. Special care should be taken during construction to insure stability during maintenance and integrity of control structures. 12. Any slopes graded at 3:1 or greater shall be stabilized with erosion blankets to be staked into place in accordance with the manufactures requirements. Erosion blankets may also be required at the discretion of Town officials or Project Engineer. When stabilized blanket is utilized for channel stabilization, place all of the volume of seed mix prior to laying net, or as recommended by the manufacturer. 13. To prevent heavy construction equipment and trucks from tracking soil off-site, construct a pervious crushed stone pad. Locate and construct pads as detailed in these plans. 14. Contractor is responsible for controlling dust by sprinkling exposed soil areas periodically with water as required. Contractor to supply all equipment and water. 15. Contractor shall be responsible for construction inspections as per NYSDEC GP-0-15-002 and Town of Cortlandt Code & Village of Croton on Hudson. MAINTENANCE OF TEMPORARY EROSION AND SEDIMENT CONTROL STRUCTURES: N.Y.S.D.E.C. GP-0-15-002 EXPOSURE RESTRICTIONS - States that any exposed earthwork shall be stabilized in accordance with the guidelines of this plan. 1. Trees and vegetation shall be protected at all times as shown on the detail drawing and as directed by the Engineer. 2. Care should be taken so as not to channel concentrated runoff through the areas of construction activity on the site. 3. Fill and site disturbances should not be created which causes water to pond off site or on adjacent properties. 4. Runoff from land disturbances shall not be discharged or have the potential to discharge off site without first being intercepted by a control structure, such as a sediment trap or silt fence. Sediment shall be removed before exceeding 50% of the retention structure's capacity. 5. For finished grading, adequate grade shall be provided so that water will not pond on lawns for more than 24 hours after rainfall, except in swale flow areas which may drain for as long as 48 hours after rainfall. 6. All swales and other areas of concentrated flow shall be properly stabilized with temporary control measures to prevent erosion and sediment travel. Surface flows over cut and fill areas shall be stabilized at all times. 7. All sites shall be stabilized with erosion control materials within 7 days of final grading. 8. Temporary sediment trapping devices shall be removed from the site within 30 days of final stabilization. MAINTENANCE OF PERMANENT CONTROL STRUCTURES DURING CONSTRUCTION: The stormwater management system and outlet structure shall be inspected on a regular basis and after every rainfall event. Sediment build up shall be removed from the inlet protection regularly to insure detention capacity and proper drainage. Outlet structure shall be free of obstructions. All piping and drain inlets shall be free of obstruction. Any sediment build up shall be removed. MAINTENANCE OF CONTROLS AFTER CONSTRUCTION: Controls (including respective outlet structures) should be inspected periodically for the first few months after construction and on an annual basis thereafter. They should also be inspected after major storm events. DEBRIS AND LITTER REMOVAL: Twice a year, inspect outlet structure and drain inlets for accumulated debris. Also, remove any accumulations during each mowing operation. STRUCTURAL REPAIR/REPLACEMENT: Outlet structure must be inspected twice a year for evidence of structural damage and repaired immediately. EROSION CONTROL: Unstable areas tributary to the basin shall immediately be stabilized with vegetation or other appropriate erosion control measures. SEDIMENT REMOVAL: Sediment should be removed after it has reached a maximum depth of five inches above the stormwater management system floor. TOPSOIL: Existing topsoil will be removed and stored in piles sufficiently as to avoid mixing with other excavation. Stockpiles shall be surrounded by erosion control as outlined on these plans. The furnishing of new topsoil shall be of a better or equal to the following criteria (SS713.01 NYSDOT): 1. The pH of the material shall be 5.5 to 7.6. 2. The organic content shall not be less than 2% or more than 70%. 3. Gradation: SIEVE SIZE % PASSING BY WGT. 2 INCH 1 INCH 85 TO 100 1/4 INCH 65 TO 100 NO. 200 MESH 20 TO 80 PERMANENT VEGETATIVE COVER: 1. Site preparation: 1.1. Install erosion control measures. 1.2. Scarify compacted soil areas. 1.3. Lime as required to ph 6.5. 1.4. Fertilize with 10-6-4 4 lbs/1,000 S.F. 1.5. Incorporate amendments into soil with disc harrow. 2. Seed mixtures for use on swales and cut and fill areas. MIXTURE LBS./ACRE ALT. A KENTUCKY BLUE GRASS CREEPING RED FESCUE RYE GRASS OR REDTOP ALT. B CREEPING RED FESCUE REDTOP TALL FESCUE/SMOOTH BLOOMGRASS 3. SEEDING 3.1. Prepare seed bed by raking to remove stones, twigs, roots and other foreign material. 3.2. Apply soil amendments and integrate into soil. 3.3. Apply seed uniformly by cyclone seeder culti-packer or hydro-seeder at rate indicated. 3.4. Stabilize seeded areas in drainage swales. 3.5. Irrigate to fully saturate soil layer, but not to dislodge planting soil. 3.6. Seed between April 1st and May 15th or August 15th and October 15th. 3.7. Seeding may occur May 15th and August 15th if adequate irrigation is provided. TEMPORARY VEGETATIVE COVER: SITE PREPARATION: 1. Install erosion control measures. 2. Scarify areas of compacted soil. 3. Fertilize with 10-10-10 at 400/acre. 4. Lime as required to ph 6.5. SEED SPECIES: MIXTURE LBS./ACRE Rapidly germinating annual ryegrass (or approved equal) Perennial ryegrass Cereal oats SEEDING: Same as permanent vegetative cover CONTRACTOR CERTIFICATION STATEMENT Certification Statement - All contractors and subcontractors as identified in a SWPPP, by the Owner or Operator, in accordance with Part III.A.5 of the SPDES General Permit for Stormwater Runoff from Construction Activity, GP-0-15-002, dated January 29, 2015, Page 10 of 40, shall sign a copy of the following Certification Statement before undertaking any construction activity at the Site identified in the SWPPP: "I hereby certify that I understand and agree to comply with the terms and conditions of the SWPPP and agree to implement any corrective actions identified by the Qualified Inspector during a site inspection. I also understand that the Owner or Operator must comply with the terms and conditions of the New York State Pollutant Discharge Elimination System ("SPDES") General Permit for Stormwater Discharge from Construction Activities and that it is unlawful for any person to cause or contribute to a violation of water quality standards. Furthermore, I understand that certifying false, incorrect or inaccurate information is a violation of the referenced permit and the laws of the State of New York and could subject me to criminal, civil and/or administrative proceedings." Individual Contractor: Name and Title (please print): Signature of Contractor: Company / Contracting Firm: Name of Company: Address of Company: Telephone Number / Cell Number: Site Information: Address of Site: Today's Date: OWNER / OPERATOR CERTIFICATION Name (please print): Title: Date: Phone: E-mail: "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. Further, I hereby certify that the SWPPP meets all Federal, State, and local erosion and sediment control requirements. I am aware that false statements made herein are punishable as a Class A misdemeanor pursuant to Section 210.45 of the Penal Law." INSP. CONSTRUCTION SEQUENCE: Refer to the Plan Set for all plans and details which relate to Construction Sequence. 1. Prior to the beginning of any site work the major features of the construction must be field staked by a licensed surveyor. These include the building, limits of disturbance, utility lines, and stormwater practices. 2. Prior to the start of the project, an on-site pre-construction meeting will be held. this will be attended by the project owner, the operator responsible for complying with the approved construction drawings including the erosion and sediment control (E&SC) plan and details, the design engineer, the engineer responsible for E&SC monitoring during construction, and town representatives from the engineering department and code enforcement. 3. A licensed surveyor must define infrastructure locations, limits of disturbance, stormwater basin limits, and grades in the field prior to start of any construction. Limits of disturbance shall be marked with the installation of construction fence or approved equal. The extents of the stormwater management system shall be cordoned off to minimize the disturbance on this area. 4. Install all perimeter erosion control measures, construction entrance as shown on the Erosion and Sediment Control Plan and the associated Details. Install silt fencing at the bottom of slopes. The standards established in Part 1.B 1.b of the GP-015-002 included in appendix B of this SWPPP must be adhered to. 5. Strip site, clear vegetation, and place topsoil in stockpile locations shown on the plan. 6. Begin rough grading the site. Contractor to limit exposure of denuded soils by providing temporary stabilization for work areas that will remain undisturbed for over seven (7) days. Chipped rock that is not suitable to remain on site shall be hauled away and properly disposed of. An area has been provided for the stockpiling of removed soil and rock which is to be removed from the site. 7. Begin grading of driveway. The sections of driveway started at the beginning of the work day must be paved and completed by the end of the day. 8. Rough grade building. 9. Begin construction of building. 10. Begin the excavation and installation of the drainage and stormwater management system. Protect trenches and open excavations from erosion. Entry into the system shall be blocked off until site has reached final stabilization. Once system has been installed, backfill, seed where necessary, and reinstall measures to cordon off the system from disturbance. 11. During site construction maintain and re-establish as required erosion control and stabilization measures as required by the site plan and details. 12. Excavate to the sub-grade level. Scarify the existing soil to a depth of 12-inches by rototilling or other means acceptable to the Engineer. Install all courses of stone as per the specifications given on the Plan. 13. Install base course of Item 4 in all pavement areas. Stabilize all open areas with seed and mulch. 14. Construct remainder of building, driveway and parking areas. First install curbs, asphalt binder, and concrete sidewalk. Once binder course is installed, drainage outlet may be unblocked. 15. Backfill curbs, grade, place final soil topping and put in place permanent vegetative cover over all disturbed areas, landscape beds, slopes, etc. 16. Once site stabilization has taken place (An area shall be considered to have achieved final stabilization when it has a minimum uniform 80% perennial vegetative cover or other permanent non-vegetative cover with a density sufficient to resist accelerated surface erosion and subsurface characteristics sufficient to resist sliding and other movements), remove all temporary erosion and sediment controls, unplug the drainage system to allow runoff to enter the stormwater management system. Winter Stabilization Notes: If construction activities are expected to extend into or occur during the winter season the contractor shall anticipate proper stabilization and sequencing. Construction shall be sequenced such that wherever possible areas of disturbance that can be completed and permanently stabilized shall be done by applying and establishing permanent vegetative cover before the first frost. Areas subject to temporary disturbance that will not be worked for an extended period of time shall be treated with temporary seed, mulch, and/or erosion blankets. PREPARED FOR SITE PLAN Westchester County, NY 0 ALBANY POST ROAD PROJECT LOCATION THOMAS HANNIGAN JR CHECK DAM DETAIL NOT TO SCALE E-5 CONSTRUCTION SPECIFICATIONS: 1. Stones will be placed on a filter fabric foundation to the lines, grades and locations shown in the plan. 2. Set spacing of check dams to ensure that the elevations of the crest of the downstream dam is the same elevation of the toe of the upstream dam. 3. Extend the stone a minimum of 1.5 ft. Beyond the ditch banks to prevent cutting around the dam. 4. Protect the channel downstream of the lowest check dam from scour and erosion with stone or liner as appropriate. 5. Ensure that channel appurtenances such as culvert entrances below check dams are not subject to damage or blockage from displaced stones. TOP BANK OF SWALE TOE SAME ELEVATION A A CREST B PROFILE FILTER FABRIC 9" MIN. 1.5' MIN. B SECTION A-A SECTION B-B FILTER FABRIC 24" MAX @ CENTER SYMBOL SPACING VARIES DEPENDING ON CHANNEL SLOPE 8/30/2022 Eng. comments 21-22 PROJECT # Town of Croton-on-Hudson 1/3/2023 WCHD comments 10/31/2023 Town comments 1/11/2024 Town comments ELEVATION (FT) DISTANCE ALONG BASELINE (FT) PROP. DRIVEWAY VERT. SCALE: 1" = 6 HORIZ. SCALE: 1" = 30 0+00 470.4 470.44 0+50 474.5 474.55 1+00 479.1 479.13 1+50 481.4 481.39 2+00 487.7 487.71 2+50 491.3 491.32 3+00 494.8 494.81 3+50 498.7 498.72 4+00 511.0 510.97 4+50 524.7 524.68 5+00 526.6 526.56 5+50 527.3 527.35 6+00 526.8 526.84 6+50 530.7 530.68 7+00 536.8 536.83 7+50 542.7 542.72 8+00 547.9 547.88 8+50 551.4 551.44 9+00 555.1 555.08 9+50 559.2 559.22 10+00 564.0 564.01 10+50 570.0 570.00 11+00 579.1 579.11 11+50 584.2 584.19 12+00 586.3 586.30 12+35.28 586.4 586.44 2.8% 10.0% 1.8% GRADE BREAK STA = 0+00.00 ELEV = 470.44 GRADE BREAK STA = 11+33.32 ELEV = 581.56 GRADE BREAK STA = 12+35.28 ELEV = 583.35 DATE: SCALE: Sheet of No. Date Comments: Yorktown Heights, NY 10598 www.sitedesignconsultants.com Fax: (914) 962-7386 Land Planners Engineer: NYS Lic. No. 64431 Joseph C. Riina, P.E. 251-F Underhill Avenue, Civil Engineers (914) 962-4488 - EROSION & SEDIMENT CONTROL AND SITE PLAN DETAILS 06/28/21 AS NOTED CS COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED PREPARED FOR SITE PLAN Westchester County, NY 0 ALBANY POST ROAD PROJECT LOCATION THOMAS HANNIGAN JR Drawing Not To Scale Disclaimer: The information presented herein is general design information only. For specific applications, consult an independent professional for further design guidance. A B C A B C CRITICAL POINTS A. Overlaps and Seams B. Projected Water Line C. Channel Bottom/Side Slope Vertices Load Bearing Plate Tendon Anchor Head (Load-Locked Position) Embedment (As Designed) NOTES: * The performance of ground anchoring devices is highly dependent on numerous site/project specific variables. It is the sole responsibility of the project engineer and/or contractor to select the appropriate anchor type and length. Anchoring shall be selected to hold the mat in intimate contact with the soil subgrade and resist pullout in accordance with the project's design intent. * Anchor Pattern Guide can vary based on earth anchor and blanket selection. * If desired, the system can be soil-filled and sodded after TRM installation. Sod should be staples/staked according to plan specifications. Earth Anchor Detail 2"-5" (5-12.5cm) 3.3' (1m) 6' (1.8m) 3' (0.9m) 4' (1.2m) 1.6' (0.5m) 2' (0.6m) 0.7 Anchors per SQ.YD. (0.8 Anchors per SQ. M.) A B C D 2"-5" (5-12.5cm) 2"-5" (5-12.5cm) 2"-5" (5-12.5cm) 2"-5" (5-12.5cm) 6' (1.8m) 3.3' (1m) 3.3' (1m) 3' (0.9m) 3.3' (1m) 3.3' (1m) 1.6' (0.5m) 3' (0.9m) 1.5'(0.45m) 2"-5" (5-12.5cm) 2"-5" (5-12.5cm) 2"-5" (5-12.5cm) 1.15 Anchors per SQ.YD. (1.35 Anchors per SQ. M.) 1.7 Anchors per SQ.YD. (2.0 Anchors per SQ. M.) 2.3 Anchors per SQ.YD. (2.7 Anchors per SQ. M.) Steep Slopes Shallow Slopes Channel & Shoreline Slopes 2:1 3:1 1.6' (0.5m) 0.7 Anchors/SQ.YD.(0.8 Anchors/SQ. M.) 1.15 Anchors/SQ.YD.(1.35 Anchors/SQ. M.) 1.7 Anchors/SQ.YD.(2.0 Anchors/SQ. M.) 2.3 Anchors/SQ.YD.(2.7 Anchors/SQ. M.) 1:1 Drawn on: 01-28-13 5401 St. Wendel - Cynthiana Rd. Poseyville, IN 47633 PH: 800-772-2040 www.tensarnagreen.com SLOPE INSTALLATION EARTH ANCHOR (EA) DETAIL *NOTE: In loose soil conditions, the use of staple or stake lengths greater than 6"(15cm) may be necessary to properly secure the HP-TRMs. 1. Prepare soil before installing high-performance turf reinforcement mats (HP-TRMs), including any necessary application of lime, fertilizer, and seed. 2. Begin at the top of the slope by anchoring the HP-TRMs in a 6” (15 cm) deep x 6” (15cm) wide trench with approximately 12” (30 cm) of HP-TRMs extended beyond the up-slope portion of the trench. Anchor the HP-TRMs with a row of staples and anchors approximately 12” (30 cm) apart in the bottom of the trench. Backfill and compact the trench after stapling. Apply seed to compacted soil and fold remaining 12” (30 cm) portion of HP-TRMs back over seed and compacted soil. Secure HP-TRMs over compacted soil with a row of staples/stakes spaced approximately 12" (30 cm) apart across the width of the HP-TRMs. 3. Roll the HP-TRMs (A) down or (B) horizontally across the slope. HP-TRMs will unroll with appropriate side against the soil surface. All HP-TRMs must be securely fastened to soil surface by placing staples/stakes in appropriate locations as shown in the staple pattern guide. 4. The edges of parallel HP-TRMs must be stapled with approximately 2" - 5" (5-12.5cm) overlap depending on the HP-TRM type. 5. Consecutive HP-TRMs spliced down the slope must be end over end (Shingle style) with an approximate 3"(7.5cm) overlap. Staple through overlapped area, approximately 12"(30cm) apart across entire HP-TRM width. SLOPE INSTALLATION EARTH ANCHOR (EA) DETAIL Drawing Not To Scale 3B 3A *NOTE: In loose soil conditions, the use of staple or stake lengths greater than 6"(15cm) may be necessary to properly secure the HP-TRMs. 30"(76.2cm) 12" (30cm) 12" (30cm) 4" (10 cm) Earth Anchor Earth Anchor Staples/Stakes Drawn on: 01-28-13 5401 St. Wendel - Cynthiana Rd. Poseyville, IN 47633 PH: 800-772-2040 www.tensarnagreen.com 1. Prepare soil before installing high-performance turf reinforcement mats (HP-TRMs), including any necessary application of lime, fertilizer, and seed. 2. Begin at the top of the slope by anchoring the HP-TRMs in a 12” (30 cm) deep x 12” (30cm) wide trench with approximately 30” (76.2 cm) of HP-TRMs extended beyond the up-slope portion of the trench. Anchor the HP-TRMs with an alternating row of staples and anchors approximately 30” (76.2 cm) apart in the bottom of the trench. Backfill and compact the trench after stapling. Fold remaining 30” (76.2 cm) portion of HP-TRMs back over compacted soil. Secure HP-TRMs over compacted soil with an alternating row of staples/anchors spaced approximately 18" (45 cm) apart across the width of the HP-TRMs. 3. Roll the HP-TRMs (A) down or (B) horizontally across the slope. HP-TRMs will unroll with appropriate side against the soil surface. All HP-TRMs must be securely fastened to soil surface by placing staples/anchors in appropriate locations as shown in the staple pattern guide. 4. The edges of parallel HP-TRMs must be stapled between earth anchors with approximately 4" (10 cm) overlap depending on the HP-TRM type. For curved sections, adjust the overlap edges of parallel HP-TRMs accordingly with a minimum of 4" (10 cm) overlap to accommodate transitional segments. E-6 EROSION BLANKET DETAIL NOT TO SCALE R-1 HOUSE DRIVEWAY DETAIL NOT TO SCALE 2-1/2" ASPHALT CONCRETE TOP COURSE N.Y.S. ITEM NO. 403.16 6" COMPACTED N.Y.S. D.O.T. ITEM NO. 304.05 2' SHOULDER 4" ASPHALT CURB 2% SLOPE 12' MIN. 8/30/2022 Eng. comments 21-22 PROJECT # STORM DRAIN MANHOLE DETAIL NOT TO SCALE D-1 DRAIN PLAN 24" Ø 2'-0" 4'-0" MIN. (SEE NOTE 3) SECTION 3/4" CRUSHED STONE 3'-0" NOTES: 1. All pipes must be cut flush with inside walls. 2. Drain manhole shall be precast as manufactured by Fort Miller, or approved equal. 3. Where depth of manhole exceeds 10 ft, inside diameter shall be 60". 4. Manhole covers and structures shall meet or exceed A.S.T.M. and O.S.H.A. requirements. 5. Pre-cast sections shall be in accordance with "Pre-cast Reinforced Manhole Sections", A.S.T.M. designation C-478, latest revision. Minimum compressive strength shall be 4000 psi. Structures shall be rated for h-20 vehicle loading. CAST IRON FRAME AND COVER MANUFACTURED BY CAMPBELL FOUNDRY MODEL NO.1203 OR APPROVED EQUAL CAST IRON OR POLYPROPYLENE COATED STEEL STEPS AT 12" O.C. MANHOLES SHALL BE SET WITH NO SUMP 8" CONCRETE WALLS ECCENTRIC CONE 4000 P.S.I. CONCRETE MORTAR SETTING W/ ONE BRICK LEVELING COURSE SET FLUSH WITH PAVEMENT FINISHED GRADE OUT IN Town of Croton-on-Hudson 1/3/2023 WCHD comments 10/31/2023 Town comments R-2 4" 6" REVEAL 8" 6" 10" 8" 4" BELGIUM CURB DETAIL MIN. 4" TOP SOIL AND SEED BELGIUM BLOCK CURBING (10" DEEP x 7" LONG x 4" WIDE) FINISHED PAVEMENT 2" TOP COURSE 4" BINDER COURSE 8" ITEM 4 SUBBASE APPROVED COMPACTED SUBGRADE CLASS A CONCRETE FOUNDATION (3,500 PSI) NOTE: 1. Joints shall be 3/4" or less and fully mortared with 1:2 cement mortar, and cleaned of excess mortar 4" COMPACT N.Y.S.D.O.T. ITEM 304.05 BASE APPROXIMATE 1" TO 1-1/2" BEDDING SAND OR STONE DUST BRICK PAVER 6" MIN. EMERGENCY ACCESS ROAD DETAIL R-4 NOT TO SCALE COMPACTED SOIL AT PERIMETER APPROXIMATE 1" TO 1-1/2" BEDDING SAND GEOTEXTILE AS REQUIRED TURN UP AT SIDES COMPACT N.Y.S.D.O.T. ITEM 304.05 8" MIN. THICKNESS COMPACT SOIL SUBGRADE CONCRETE GRID PAVER 3-1/8" MIN. THICKNESS AS MANUFACTURED BY ANCHOR CONCRETE PRODUCTS OR APPROVED EQUAL SOD PLUGS OR GRASS SEED TOPSOIL IN OPENINGS FILL 1/2" BELOW SURFACE SECTION 1/11/2024 Town comments EMERGENCY ACCESS ROAD DETAIL R-3 NOT TO SCALE ELEVATION (FT) DISTANCE ALONG BASELINE (FT) Septic Profile VERT. SCALE: 1" = 6 HORIZ. SCALE: 1" = 30 HOUSE SEWER INV. OUT = 584.05' SEPTIC TANK INV. IN = 583.84' INV. OUT = 583.59' TRENCH 1 INV. IN = 562.70' TRENCH 2 INV. IN = 562.50' EXP. TRENCH 1 INV. IN = 561.76' EXP. TRENCH 2 INV. IN = 561.06' 0+00 586.1 0+50 584.9 1+00 581.5 1+50 573.9 2+00 564.4 2+50 561.1 560.82 2+51.16 560.9 560.73 2.7% 3.4% 11.6% 11.7% 7.7% GRADE BREAK STA = 2+18.47 ELEV = 564.43 GRADE BREAK STA = 2+49.85 ELEV = 561.97 4" DIA. SDR 35 PVC PIPE L = 10 FT; S = 2% MIN PROPOSED GRADE 1,000 GAL. P/C CONC. SEPTIC TANK 4" PVC PIPE L = 124 FT; S = 14.9% MIN 24" WIDE SEPTIC TRENCH 6" O.C. WITH 4" PERFORATED PIPE. TOTAL LENGTH = 188 FT EXISTING GRADE FUTURE 24" WIDE EXPANSION SEPTIC TRENCH 6" O.C. W/ 4" PERFORATED PIPE (TYP.) PROPOSED CLEANOUT 4" PVC PIPE L = 79 FT; S = 2.5% N 78° 32' 10" W S 80° 29' 10" E 46.41' S 79° 50' 00" E 57.91' S 62° 43' 30" E 56.74' S 58° 44' 20" E 64.46' S 59° 29' 10" E 33.89' S 62° 28' 00" E 22.00' S 60° 11' 00" E 98.98' S 56° 32' 00" E 38.07' N 70° 33' 00" E 341.27 225.18' S 39° 30' 00" W 38.39' S 41° 00' 10" W 50.11' S 42° 13' 40" W 152.32' S 39° 53' 40" W 74.29' S 42° 35' 00" W 66.86' S 43° 46' 00" W 90.27' S 43° 55' 40" W 96.58' N 48° 12' 20" W 189.42' N 51° 14' 20" W 31.15' N 35° 08' 00" W 576.36' N 39° 34' 40" E 32.77' N 50° 14' 20" E 77.45' N 77° 00' 40" W 67.06' N 45° 00' 00" W 50.00' S 70° 00' 00" W 52.92' 32.00' N 78° 32' 10" W 28.21' 230.75' 54.81' 35.64' 30' S 58° 50' 10" W 100.35' S 63° 3 123.28' S 62° 06' 30" W 50.00' N 54° 27' 00" E 102.19' N 58° 20' 50" E 98.48' S 89° 27' 00" E 6.25' N 46° 35' 00" E 14.58' N 57° 11' 50" E 298.62' S 78° 32' 10" E 262.75' S 60° 11' 00" E S 77° 00' 40" E TOWN OF CORTLANDT VILLAGE OF CROTON-ON-HUDSON PT#6 DT#6 PT#4 DT#4 PT#5 DT#5 TP-3 IT-3 TP-4 IT-4 VILLAGE OF CROTON-ON HUDSON VILLAGE OF CROTON-ON HUDSON TOWN OF CORTLANDT TOWN OF CORTLANDT W 47' 47' 47' 47' 47' 47' 47' 47' C C 3128 3126 DATE: SCALE: Sheet of No. Date Comments: Yorktown Heights, NY 10598 www.sitedesignconsultants.com Fax: (914) 962-7386 Land Planners Engineer: NYS Lic. No. 64431 Joseph C. Riina, P.E. 251-F Underhill Avenue, Civil Engineers (914) 962-4488 - SEPTIC SYSTEM SITE PLAN AND DETAILS 06/28/21 AS NOTED CS NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED PERFORATED PIPE TRENCH DETAIL NOT TO SCALE S-5 FOR SLOPING GROUND TYPICAL FILL SECTION NOT TO SCALE LP IMPERVIOUS MATERIAL (CLAY) 12" MIN. THICKNESS IMPERVIOUS LAYER OF CLAY 3:1 MAX. 6" SOIL COVER ROCK OR WATER 10' MIN. 12"MIN B.O.H. APPROVED RUN-OF-BANK FILL (SEE SCHEDULE FOR DEPTH OF FILL). ALL PIPES TO BE LAID IN A 6" BED OF 3/4" TO 1-1/2" WASHED STONE OR GRAVEL ORIGINAL GROUND 10'MIN. 6' 6' 10' NOTE: 1. Restrictive measurements are to be taken from the toe of slope. 5' MIN. S-6 12" MIN 12" MIN S-1 NOT TO SCALE JUNCTION BOX DETAIL REMOVABLE COVER NOTES: 1. Bottom of junction box must be level and firmly supported below frost line. 2. Junction box footing shall extend to 36" below ground level. 3. Junction boxes shall be placed on single branch distributors. 4. Junction boxes shall be constructed of waterproofed masonry construction. 5. Tight joint pipe shall be used between the septic tank and junction box and between all junction boxes and laterals. 4. All pipes connecting to the junction box shall be cut flush with the inside wall. 5. Maximum cover above junction boxes shall be 12 inches. 6. The clear inside dimension of junction boxes shall be a minimum of 12" x 12". 7. All pipes shall be cut flush with inside of junction box. PLAN OUTLET PER PLAN INLET OUTLET PER PLAN 5" REMOVABLE COVER FINISHED GRADE ELEVATION 12" SAND/PEA GRAVEL BASE 2"-4" MIN. OUTLET PER PLAN 3" 2" 2" MIN S-3 12" 3" 48" 56" 67" 120" 60" 1,250 Gal. 12" 1" TAPER 3" A A A 7" B 55" 67" 1,000 Gal. 58" 102" D A B 10" C 48" 3" D 18" MIN E F C F 67" 3" 12" 1,500 Gal. 65" 126" 56" 48" E G H G H 5" 5" 5" 4" LIQUID CAPACITY INLET BAFFLE OUTLET BAFFLE DUAL COMPARTMENT BAFFLE NOTES: 1. The minimum required fill cover above the septic tank shall be 6 to 12 inches with a maximum cover depth of 24 inches. When required fill cover exceeds 24 inches, manhole extensions with steel frames and covers shall be installed and extended to finished grade. If the septic tank is rated for H-20 vehicle loading, the manholes, frames and covers shall be H-20 rated also. 2. The dual compartment baffle is required on all septic tanks with a length "B" equal to or greater than 10 feet. 3. For installations that require an overflow tank, a tank the same size as the septic tank shall be used. Dual compartment baffles are not required on overflow tanks regardless of the size. 4. All pipes connecting to the tank shall be cut flush with the inside wall. 5. Tank shall be manufactured by Mid Hudson Concrete Products, Inc. CLEANOUT COVER REINFORCING RIBS LIQUID LEVEL 48" MIN; 60" MAX INSPECTION COVER PLAN 3" VENT 5"x5" OUTLET SECTION A-A 3" SAND/PEA GRAVEL BED NOTE: Add 4" to H for H-20 Loading SEPTIC TANK SPECIFICATIONS & CAPACITIES I J K L OUTLET INTLET 60% TO 70% TANK VOLUME I J K L 4" 6"x9" 20"Ø 10"x14" 4" 4" 2,000 Gal. 4" 5" 3" 12" 48" 56" 67" 6"x9" 10"x14" 6"x9" 10"x14" 6"x9" 10"x14" 144" 78" PRECAST CONCRETE SEPTIC TANK DETAIL AND OVERFLOW TANK DETAIL 16" MIN 20"Ø 20"Ø 20"Ø PREPARED FOR SITE PLAN Westchester County, NY 0 ALBANY POST ROAD PROJECT LOCATION THOMAS HANNIGAN JR SEPTIC SYSTEM DETAIL NOT TO SCALE S-4 UNCONSOLIDATED DRILLED WELL DETAIL WATER BEARING ROCK NOT TO SCALE 18" 18" W-1 VERMIN-PROOF SANITARY WELL CAP CONDUIT FOR ELECTRIC CABLE CONCRETE SEAL TEMPORARY CASING MAY BE WITHDRAWN AS GROUT IS PLACED 2" DISCHARGE LINE CHECK VALVE DRIVE SHOE ALLOW SUFFICIENT CLEARANCE FOR GROUT PLACEMENT SUBMERSIBLE PUMP WELL CASING 50' MIN. 10' MIN. INTO ROCK DROP PIPE BASIC PITLESS UNIT LIFT OUT PIPE EXISTING GRADE FINISHED GRADE (MOUNDED TOPSOIL @ WELL HEAD) NOTES: 1. The top of the well casing shall be set a minimum of 2 ft above the 100 yr high-water level or 18 " above finished ground surface, whichever is greater. 2. A minimum of 4 feet of cover shall be provided over the water service line. 8/30/2022 Eng. comments 21-22 PROJECT # PROJECT SITE VIEW NOT TO SCALE S-7 6"-12" 4" 2" 24" 18" MIN. - 30" MAX. OVERFILL TO ALLOW FOR SETTLEMENT 4" TOPSOIL & SEED UNTREATED BUILDING PAPER OR PERMEABLE GEOTEXTILE OR STRAW HAY 4"PERFORATED PIPE MAX SLOPE 1/16" PER FT. PERFORATIONS DOWN 3/4" TO 1-1/2" GRADED WASHED GRAVEL OR WASHED CRUSHED STONE FREE OF FINES AND SILTS - 12" MIN. DEPTH NOTES: 1. Ends of all trenches are to be capped. 2. A separation distance of 5' minimum is required between the bottom of absorption trench and presence of ledgerock and/or groundwater table. 3. 4 inch perforated pvc gravity distribution lines shall be set at a pitch of 1/16" to 1/32" per ft. for gravity systems and set level for dosed systems. 4. DO NOT install absorption trenches in wet or frozen soils. 5. Absorption trenches are to be installed parallel to the contours. BACKFILL (EARTH) 6" - 12" DEPTH BACKFILL (EARTH) 6"-12" DEPTH 6" MIN. ENDCAP 6" MIN. 5' MIN. TO LEDGE ROCK OR GROUNDWATER LEDGEROCK OR GROUNDWATER 1/3/2023 WCHD comments Town of Croton-on-Hudson 1/3/2023 WCHD comments 10/31/2023 Town comments 1/11/2024 Town comments DATE: SCALE: Sheet of No. Date Comments: Yorktown Heights, NY 10598 www.sitedesignconsultants.com Fax: (914) 962-7386 Land Planners Engineer: NYS Lic. No. 64431 Joseph C. Riina, P.E. 251-F Underhill Avenue, Civil Engineers (914) 962-4488 - DRAINAGE DETAILS 06/28/21 AS NOTED CS NOTE: UNAUTHORIZED ALTERATIONS OR ADDITIONS TO THIS DRAWING IS A VIOLATION OF SECTION 7209 (2) OF THE NEW YORK STATE EDUCATION LAW COPYRIGHT © 2022 BY SITE DESIGN CONSULTANTS, ALL RIGHTS RESERVED PREPARED FOR SITE PLAN Westchester County, NY 0 ALBANY POST ROAD PROJECT LOCATION THOMAS HANNIGAN JR IMPORTANT - NOTES FOR THE BIDDING AND INSTALLATION OF THE SC-740 SYSTEM 1. STORMTECH SC-740 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S REPRESENTATIVE HAS COMPLETED A PRE-CONSTRUCTION MEETING WITH THE INSTALLERS. 2. STORMTECH SC-740 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". 3. CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR AN EXCAVATOR SITUATED OVER THE CHAMBERS. STORMTECH RECOMMENDS 3 BACKFILL METHODS: · STONESHOOTER LOCATED OFF THE CHAMBER BED. · BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR SUBGRADE. · BACKFILL FROM OUTSIDE THE EXCAVATION USING A LONG BOOM HOE OR EXCAVATOR. 4. THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS. 5. JOINTS BETWEEN CHAMBERS SHALL BE PROPERLY SEATED PRIOR TO PLACING STONE. 6. MAINTAIN MINIMUM - 6" (150 mm) SPACING BETWEEN THE CHAMBER ROWS. 7. EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE 3/4-2" (20-50 mm). 8. THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIALS BEARING CAPACITIES TO THE SITE DESIGN ENGINEER. 9. ADS RECOMMENDS THE USE OF "FLEXSTORM CATCH IT" INSERTS DURING CONSTRUCTION FOR ALL INLETS TO PROTECT THE SUBSURFACE STORMWATER MANAGEMENT SYSTEM FROM CONSTRUCTION SITE RUNOFF. NOTES FOR CONSTRUCTION EQUIPMENT 1. STORMTECH SC-740 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". 2. THE USE OF CONSTRUCTION EQUIPMENT OVER SC-740 CHAMBERS IS LIMITED: · NO EQUIPMENT IS ALLOWED ON BARE CHAMBERS. · NO RUBBER TIRED LOADERS, DUMP TRUCKS, OR EXCAVATORS ARE ALLOWED UNTIL PROPER FILL DEPTHS ARE REACHED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". · WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT CAN BE FOUND IN THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". 3. FULL 36" (900 mm) OF STABILIZED COVER MATERIALS OVER THE CHAMBERS IS REQUIRED FOR DUMP TRUCK TRAVEL OR DUMPING. USE OF A DOZER TO PUSH EMBEDMENT STONE BETWEEN THE ROWS OF CHAMBERS MAY CAUSE DAMAGE TO THE CHAMBERS AND IS NOT AN ACCEPTABLE BACKFILL METHOD. ANY CHAMBERS DAMAGED BY THE "DUMP AND PUSH" METHOD ARE NOT COVERED UNDER THE STORMTECH STANDARD WARRANTY. CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON INSTALLATION REQUIREMENTS OR WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT. SC-740 STORMTECH CHAMBER SPECIFICATIONS 1. CHAMBERS SHALL BE STORMTECH SC-740. 2. CHAMBERS SHALL BE ARCH-SHAPED AND SHALL BE MANUFACTURED FROM VIRGIN, IMPACT-MODIFIED POLYPROPYLENE COPOLYMERS. 3. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418-16a, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 4. CHAMBER ROWS SHALL PROVIDE CONTINUOUS, UNOBSTRUCTED INTERNAL SPACE WITH NO INTERNAL SUPPORTS THAT WOULD IMPEDE FLOW OR LIMIT ACCESS FOR INSPECTION. 5. THE STRUCTURAL DESIGN OF THE CHAMBERS, THE STRUCTURAL BACKFILL, AND THE INSTALLATION REQUIREMENTS SHALL ENSURE THAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET FOR: 1) LONG-DURATION DEAD LOADS AND 2) SHORT-DURATION LIVE LOADS, BASED ON THE AASHTO DESIGN TRUCK WITH CONSIDERATION FOR IMPACT AND MULTIPLE VEHICLE PRESENCES. 6. CHAMBERS SHALL BE DESIGNED, TESTED AND ALLOWABLE LOAD CONFIGURATIONS DETERMINED IN ACCORDANCE WITH ASTM F2787, "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". LOAD CONFIGURATIONS SHALL INCLUDE: 1) INSTANTANEOUS (<1 MIN) AASHTO DESIGN TRUCK LIVE LOAD ON MINIMUM COVER 2) MAXIMUM PERMANENT (75-YR) COVER LOAD AND 3) ALLOWABLE COVER WITH PARKED (1-WEEK) AASHTO DESIGN TRUCK. 7. REQUIREMENTS FOR HANDLING AND INSTALLATION: · TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. · TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 2”. · TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 550 LBS/IN/IN. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23° C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS. 8. ONLY CHAMBERS THAT ARE APPROVED BY THE SITE DESIGN ENGINEER WILL BE ALLOWED. UPON REQUEST BY THE SITE DESIGN ENGINEER OR OWNER, THE CHAMBER MANUFACTURER SHALL SUBMIT A STRUCTURAL EVALUATION FOR APPROVAL BEFORE DELIVERING CHAMBERS TO THE PROJECT SITE AS FOLLOWS: · THE STRUCTURAL EVALUATION SHALL BE SEALED BY A REGISTERED PROFESSIONAL ENGINEER. · THE STRUCTURAL EVALUATION SHALL DEMONSTRATE THAT THE SAFETY FACTORS ARE GREATER THAN OR EQUAL TO 1.95 FOR DEAD LOAD AND 1.75 FOR LIVE LOAD, THE MINIMUM REQUIRED BY ASTM F2787 AND BY SECTIONS 3 AND 12.12 OF THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS FOR THERMOPLASTIC PIPE. · THE TEST DERIVED CREEP MODULUS AS SPECIFIED IN ASTM F2418 SHALL BE USED FOR PERMANENT DEAD LOAD DESIGN EXCEPT THAT IT SHALL BE THE 75-YEAR MODULUS USED FOR DESIGN. 9. CHAMBERS AND END CAPS SHALL BE PRODUCED AT AN ISO 9001 CERTIFIED MANUFACTURING FACILITY. NOTES 1. 8-30" (200-750 mm) GRATES/SOLID COVERS SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05 2. 12-30" (300-750 mm) FRAMES SHALL BE DUCTILE IRON PER ASTM A536 GRADE 70-50-05 3. DRAIN BASIN TO BE CUSTOM MANUFACTURED ACCORDING TO PLAN DETAILS 4. DRAINAGE CONNECTION STUB JOINT TIGHTNESS SHALL CONFORM TO ASTM D3212 FOR CORRUGATED HDPE (ADS & HANCOR DUAL WALL) & SDR 35 PVC 5. FOR COMPLETE DESIGN AND PRODUCT INFORMATION: WWW.NYLOPLAST-US.COM 6. TO ORDER CALL: 800-821-6710 A PART # GRATE/SOLID COVER OPTIONS 8" (200 mm) 2808AG PEDESTRIAN LIGHT DUTY STANDARD LIGHT DUTY SOLID LIGHT DUTY 10" (250 mm) 2810AG PEDESTRIAN LIGHT DUTY STANDARD LIGHT DUTY SOLID LIGHT DUTY 12" (300 mm) 2812AG PEDESTRIAN AASHTO H-10 STANDARD AASHTO H-20 SOLID AASHTO H-20 15" (375 mm) 2815AG PEDESTRIAN AASHTO H-10 STANDARD AASHTO H-20 SOLID AASHTO H-20 18" (450 mm) 2818AG PEDESTRIAN AASHTO H-10 STANDARD AASHTO H-20 SOLID AASHTO H-20 24" (600 mm) 2824AG PEDESTRIAN AASHTO H-10 STANDARD AASHTO H-20 SOLID AASHTO H-20 30" (750 mm) 2830AG PEDESTRIAN AASHTO H-20 STANDARD AASHTO H-20 SOLID AASHTO H-20 INTEGRATED DUCTILE IRON FRAME & GRATE/SOLID TO MATCH BASIN O.D. VARIOUS TYPES OF INLET AND OUTLET ADAPTERS AVAILABLE: 4-30" (100-750 mm) FOR CORRUGATED HDPE WATERTIGHT JOINT (CORRUGATED HDPE SHOWN) BACKFILL MATERIAL BELOW AND TO SIDES OF STRUCTURE SHALL BE ASTM D2321 CLASS I OR II CRUSHED STONE OR GRAVEL AND BE PLACED UNIFORMLY IN 12" (305 mm) LIFTS AND COMPACTED TO MIN OF 90% TRAFFIC LOADS: CONCRETE DIMENSIONS ARE FOR GUIDELINE PUPOSES ONLY. ACTUAL CONCRETE SLAB MUST BE DESIGNED GIVING CONSIDERATION FOR LOCAL SOIL CONDITIONS, TRAFFIC LOADING & OTHER APPLICABLE DESIGN FACTORS ADAPTER ANGLES VARIABLE 0°- 360° ACCORDING TO PLANS 18" (457 mm) MIN WIDTH A AASHTO H-20 CONCRETE SLAB 8" (203 mm) MIN THICKNESS VARIABLE SUMP DEPTH ACCORDING TO PLANS [6" (152 mm) MIN ON 8-24" (200-600 mm), 10" (254 mm) MIN ON 30" (750 mm)] 4" (102 mm) MIN ON 8-24" (200-600 mm) 6" (152 mm) MIN ON 30" (750 mm) 12" (610 mm) MIN (FOR AASHTO H-20) INVERT ACCORDING TO PLANS/TAKE OFF INSPECTION & MAINTENANCE STEP 1) INSPECT ISOLATOR ROW PLUS FOR SEDIMENT A. INSPECTION PORTS (IF PRESENT) A.1. REMOVE/OPEN LID ON NYLOPLAST INLINE DRAIN A.2. REMOVE AND CLEAN FLEXSTORM FILTER IF INSTALLED A.3. USING A FLASHLIGHT AND STADIA ROD, MEASURE DEPTH OF SEDIMENT AND RECORD ON MAINTENANCE LOG A.4. LOWER A CAMERA INTO ISOLATOR ROW PLUS FOR VISUAL INSPECTION OF SEDIMENT LEVELS (OPTIONAL) A.5. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. B. ALL ISOLATOR PLUS ROWS B.1. REMOVE COVER FROM STRUCTURE AT UPSTREAM END OF ISOLATOR ROW PLUS B.2. USING A FLASHLIGHT, INSPECT DOWN THE ISOLATOR ROW PLUS THROUGH OUTLET PIPE i) MIRRORS ON POLES OR CAMERAS MAY BE USED TO AVOID A CONFINED SPACE ENTRY ii) FOLLOW OSHA REGULATIONS FOR CONFINED SPACE ENTRY IF ENTERING MANHOLE B.3. IF SEDIMENT IS AT, OR ABOVE, 3" (80 mm) PROCEED TO STEP 2. IF NOT, PROCEED TO STEP 3. STEP 2) CLEAN OUT ISOLATOR ROW PLUS USING THE JETVAC PROCESS A. A FIXED CULVERT CLEANING NOZZLE WITH REAR FACING SPREAD OF 45" (1.1 m) OR MORE IS PREFERRED B. APPLY MULTIPLE PASSES OF JETVAC UNTIL BACKFLUSH WATER IS CLEAN C. VACUUM STRUCTURE SUMP AS REQUIRED STEP 3) REPLACE ALL COVERS, GRATES, FILTERS, AND LIDS; RECORD OBSERVATIONS AND ACTIONS. STEP 4) INSPECT AND CLEAN BASINS AND MANHOLES UPSTREAM OF THE STORMTECH SYSTEM. NOTES 1. INSPECT EVERY 6 MONTHS DURING THE FIRST YEAR OF OPERATION. ADJUST THE INSPECTION INTERVAL BASED ON PREVIOUS OBSERVATIONS OF SEDIMENT ACCUMULATION AND HIGH WATER ELEVATIONS. 2. CONDUCT JETTING AND VACTORING ANNUALLY OR WHEN INSPECTION SHOWS THAT MAINTENANCE IS NECESSARY. OR MANHOLE STORMTECH HIGHLY RECOMMENDS FLEXSTORM INSERTS IN ANY UPSTREAM STRUCTURES WITH OPEN GRATES COVER ENTIRE ISOLATOR ROW PLUS WITH ADS GEOSYNTHETICS 601T NON-WOVEN GEOTEXTILE 8' (2.4 m) MIN WIDE SC-740 CHAMBER OPTIONAL INSPECTION PORT SC-740 END CAP 24" (600 mm) HDPE ACCESS PIPE REQUIRED USE FACTORY PRE-FABRICATED END CAP WITH FLAMP PART #: SC740EPE24BR ONE LAYER OF ADSPLUS125 WOVEN GEOTEXTILE BETWEEN FOUNDATION STONE AND CHAMBERS 5' (1.5 m) MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS SUMP DEPTH TBD BY SITE DESIGN ENGINEER (24" [600 mm] MIN RECOMMENDED) NOTE: INSPECTION PORTS MAY BE CONNECTED THROUGH ANY CHAMBER CORRUGATION CREST. STORMTECH CHAMBER 8" NYLOPLAST INSPECTION PORT BODY (PART# 2708AG4IPKIT) OR TRAFFIC RATED BOX W/SOLID LOCKING COVER CONCRETE COLLAR PAVEMENT 12" (300 mm) MIN WIDTH CONCRETE SLAB 6" (150 mm) MIN THICKNESS CONCRETE COLLAR NOT REQUIRED FOR UNPAVED APPLICATIONS 4" (100 mm) SDR 35 PIPE 4" (100 mm) INSERTA TEE TO BE CENTERED ON CORRUGATION CREST NOMINAL CHAMBER SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH) 51.0" X 30.0" X 85.4" (1295 mm X 762 mm X 2169 mm) CHAMBER STORAGE 45.9 CUBIC FEET (1.30 m³) MINIMUM INSTALLED STORAGE* 74.9 CUBIC FEET (2.12 m³) WEIGHT 75.0 lbs. (33.6 kg) *ASSUMES 6" (152 mm) STONE ABOVE, BELOW, AND BETWEEN CHAMBERS BUILD ROW IN THIS DIRECTION OVERLAP NEXT CHAMBER HERE (OVER SMALL CORRUGATION) START END 90.7" (2304 mm) ACTUAL LENGTH 85.4" (2169 mm) INSTALLED LENGTH A A C B 51.0" (1295 mm) 30.0" (762 mm) 45.9" (1166 mm) 12.2" (310 mm) 29.3" (744 mm) PART # STUB A B C SC740EPE06T / SC740EPE06TPC 6" (150 mm) 10.9" (277 mm) 18.5" (470 mm) --- SC740EPE06B / SC740EPE06BPC --- 0.5" (13 mm) SC740EPE08T /SC740EPE08TPC 8" (200 mm) 12.2" (310 mm) 16.5" (419 mm) --- SC740EPE08B / SC740EPE08BPC --- 0.6" (15 mm) SC740EPE10T / SC740EPE10TPC 10" (250 mm) 13.4" (340 mm) 14.5" (368 mm) --- SC740EPE10B / SC740EPE10BPC --- 0.7" (18 mm) SC740EPE12T / SC740EPE12TPC 12" (300 mm) 14.7" (373 mm) 12.5" (318 mm) --- SC740EPE12B / SC740EPE12BPC --- 1.2" (30 mm) SC740EPE15T / SC740EPE15TPC 15" (375 mm) 18.4" (467 mm) 9.0" (229 mm) --- SC740EPE15B / SC740EPE15BPC --- 1.3" (33 mm) SC740EPE18T / SC740EPE18TPC 18" (450 mm) 19.7" (500 mm) 5.0" (127 mm) --- SC740EPE18B / SC740EPE18BPC --- 1.6" (41 mm) SC740EPE24B* 24" (600 mm) 18.5" (470 mm) --- 0.1" (3 mm) SC740EPE24BR* 24" (600 mm) 18.5" (470 mm) --- 0.1" (3 mm) ALL STUBS, EXCEPT FOR THE SC740EPE24B/SC740EPE24BR ARE PLACED AT BOTTOM OF END CAP SUCH THAT THE OUTSIDE DIAMETER OF THE STUB IS FLUSH WITH THE BOTTOM OF THE END CAP. FOR ADDITIONAL INFORMATION CONTACT STORMTECH AT 1-888-892-2694. * FOR THE SC740EPE24B/SC740EPE24BR THE 24" (600 mm) STUB LIES BELOW THE BOTTOM OF THE END CAP APPROXIMATELY 1.75" (44 mm). BACKFILL MATERIAL SHOULD BE REMOVED FROM BELOW THE N-12 STUB SO THAT THE FITTING SITS LEVEL. NOTE: ALL DIMENSIONS ARE NOMINAL PRE-FAB STUB AT BOTTOM OF END CAP WITH FLAMP END WITH "BR" PRE-FAB STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" PRE-FAB STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH "T" PRE-CORED END CAPS END WITH "PC" 4" PVC INSPECTION PORT DETAIL (SC SERIES CHAMBER) STORMTECH SC-740 ISOLATOR ROW DETAIL SWM-1 SWM-2 NOT TO SCALE SC-740 TECHNICAL SPECIFICATION SWM-3 NOT TO SCALE NYLOPLAST DRAIN BASIN SWM-4 REV 7004-110-007 DWG NO. 1 OF 1 SHEET 1:16 SCALE DWG SIZE A 3130 VERONA AVE BUFORD, GA 30518 PHN (770) 932-2443 FAX (770) 932-2490 www.nyloplast-us.com TYPICAL DRAIN BASIN WITH OUTLET WEIR FOR STORMTECH TITLE PROJECT NO./NAME MATERIAL DATE REVISED BY 10-28-03 DATE EBC DRAWN BY THIS PRINT DISCLOSES SUBJECT MATTER IN WHICH NYLOPLAST HAS PROPRIETARY RIGHTS. THE RECEIPT OR POSSESSION OF THIS PRINT DOES NOT CONFER, TRANSFER, OR LICENSE THE USE OF THE DESIGN OR TECHNICAL INFORMATION SHOWN HEREIN REPRODUCTION OF THIS PRINT OR ANY INFORMATION CONTAINED HEREIN, OR MANUFACTURE OF ANY ARTICLE HEREFROM, FOR THE DISCLOSURE TO OTHERS IS FORBIDDEN, EXCEPT BY SPECIFIC WRITTEN PERMISSION FROM NYLOPLAST. 01-17-12 CCA (3) OUTLET WEIR 24" - 30" DRAIN BASIN BODY 24" - 30" FRAME & SOLID COVER (1) (2) 12" PIPE TO CHAMBERS (3) 1 - INVERT ELEVATIONS & LOCATIONS TO BE DETERMINED BY ENGINEER. 2 - HEIGHT OF WEIR TO BE DETERMINED BY ENGINEER. WEIR HEIGHT CANNOT EXCEED 84" DUE TO MANUFACTURING AND SHIPPING RESTRICTIONS. 3 - WEIR MANUFACTURED TO MINIMIZE LOSS OF OUTLET PIPE OPEN AREA SEE DRAWING NO. 7004-110-058 FOR DETAILS. 4 - ORIFICE HOLES AND SLOTS AVAILABLE AS REQUIRED BY ENGINEER DESIGN AND PERMITTED BY MANUFACTURING RESTRICTIONS. SIDE SECTION VIEW TOP VIEW W/ FRAME & COVER REMOVED ® 12" INLET PIPE WEIR 12" ISOLATOR ROW SWM-5 DETENTION OUTLET STRUCTURE DETAIL STORM PIPE BEDDING DETAIL D-2 DIA. VARIES PAVEMENT FINISHED GRADE. SEE DRIVEWAY DETAIL FOR NEW INSTALLATIONS. SEE PAVEMENT REPLACEMENT DETAIL FOR INSTALLATIONS UNDER EXISTING ROADWAYS. FINISH GRADE 2'-0" MIN COVER 1'-0" 1'-0" 42" MIN D/2 CLEAN FILL BEDDING MATERIAL SEE NOTES APPROVED SUB GRADE 8" MIN - IF GROUND WATER TABLE S ENCOUNTERED NOTES: 1. Pipe shall be laid and connected in the bedding which shall consist of: A. Compacted existing subsoil when laid above ground water or; B. 3/4" crushed stone when laid below ground water. 2. If subsoil is determined to be unsuitable by the Engineer, all unsuitable material shall be removed for at least 2'-6" below the pipe invert or twice the pipe diameter, whichever is greater, and replaced with compacted bedding material. D-3 NOT TO SCALE TYPICAL DRAIN INLET (TYPE DI) DETAIL 6" THICK WALLS PLAN 6" 3'-0" 6" 6" 2'-6" A 8" 6" A STEPS 6" 15" MAX 18" 6" 12" VERT. SPACING 3'-0" 6" 8" 8" SECTION A-A APPROVED SUB GRADE FACE OF CURB FRAME & GRATE: CAMPBELL FOUNDRY Co. No. 3430B OR AMERICAN MADE APPROVED EQUAL FINISHED GRADE BRICK ADJUSTMENT (12" MAX.) 6" SOLID CONC. BLOCK OR PRE CAST CONCRETE REINFORCEMENT AS REQUIRED FOR PRE CAST CONCRETE STRUCTURE FOR INVERT, SEE PLAN OR PROFILE APPROVED COMPACTED CRUSHED STONE FOUNDATION COURSE STEPS AT 12" O.C. CAST IRON OR POLYPROPYLENE COATED STEEL d w/2 w/2 La 3' MIN. d/2 1.0' VARIES d/2 SEE RIPRAP STANDARDS AND SPECIFICATIONS 4" 6" d/2 DISCH. PIPE NOTE: APRON @ ZERO GRADE SIDE SLOPE 2:1 DISCHARGE TO UNCONFINED SECTION (FLARED OUTLET) (MINIMUM TAILWATER CONDITION) 6" MIN. GRADED AGGREGATE FILTER OR FILTER CLOTH GRADED AGGREGATE FILTER OR FILTER CLOTH EXISTING STABILIZED CHANNEL NO OVERFALL RISER SYMBOL PROFILE VIEW CROSS SECTION A-A PLAN VIEW A A A A PROFILE D-4 NOT TO SCALE RIPRAP OUTLET DETAIL 8/30/2022 Eng. comments 21-22 PROJECT # Town of Croton-on-Hudson 1/3/2023 WCHD comments 10/31/2023 Town comments 1/11/2024 Town comments

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.