croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Monday, August 17, 2026· Aug 17, 2026
Source-linkedCorrections welcomed
Documents

Change Order 1

resolution 2 pages
Meeting: portal event 927 (no meeting page on file)
Agenda item: Proposed Resolutions — Consider authorizing the Village Manager to execute Change Order 1 for the Marine 12 fire boat with Inventech Marine Solutions LLC, of Bremerton, WA, in the change amount of $25,137.50.
Resolution, 2 pages. Attached to agenda item: “Proposed Resolutions — Consider authorizing the Village Manager to execute Change Order 1 for the Marine 12 fire boat with Inventech Marine Solutions LLC, of Bremerton, WA, in the change amount of $25,137.50.”
Retrieved 2026-04-15 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: Resolution 24-2024 Change Order Marine 12
CHANGE ORDER 01 Date: Project HIN#: 290 / CROTON FIRE DEPT. CUSTOMER: VILLAGE OF CROTON-On-HUDSON ITEM # DESCRIPTION UNIT $ QTY TOTAL $200.00 -6 ($1,200.00) $1,800.00 $1,800.00 $950.00 $950.00 $21,250.00 $21,250.00 $1,187.50 $1,187.50 $250.00 $250.00 $900.00 $900.00 $450.00 $0.00 $0.00 Original Contract Amount: $657,234.20 Change Order Amount: $25,137.50 Revised Contract Amount: $682,371.70 1/16/2024 Add Vinyl Markings on Cuddy Cabin Sides, and Rooftop. Lettering to be Defined and Approved. Mesh Spotter Windows Covers w/ Velcro NOTE: Lettering on Collars to say: "CROTON FIRE" Credit Six (6) Flood Lights from Base-Boat and Options. Add One (1) 1200 Watt Inverter for Outlet Power Underway Add 2nd Shore Connection (Port Side) w/ Shore Power Panel Selector Switch. This will allow for Shore Connection on both Port and Stbd. One (1) FLIR M364C Installed - NOTE: Hinged Mast, Video Splitter Included in Original Sales Sheet . Does not Include JCU One (1) FLIR JCU Controller for M364C - Note, this item is not necessary as all functionality of the camera can be controled from Either MFD - Change Aft Cockpit Water System Outlet to 2-1/2" NST Connection from 3" NPT Revised Contract Duration: We hereby agree to the above as an additional/reduced project cost(s) to be added/deleted to the original scope of work: Inventech Marine LLC Date Customer Date

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.