May 14%2C 2024 Letter to NYSDOT
correspondence
2 pages
Meeting: portal event 967 (no meeting page on file)
Agenda item: Correspondence — Letter from Lance MacMillian, Regional Director at the New York State Department of Transportation, in response to correspondence dated May 15, 2024, concerning NYSDOT matters in the Village.
Correspondence, 2 pages. Attached to agenda item: “Correspondence — Letter from Lance MacMillian, Regional Director at the New York State Department of Transportation, in response to correspondence dated May 15, 2024, concerning NYSDOT matters in the Village.”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
June 20%2C 2024 Letter from NYSDOT
Extracted text
May 15, 2024
SENT VIA EMAIL AND U.S. MAIL
Mr. Lance MacMillan, P.E.
New York State Dept. of Transportation
Eleanor Roosevelt State Office Building
4 Burnett Boulevard
Poughkeepsie, New York 12603
Dear Mr. MacMillan:
I am writing to bring to your attention a number of issues in the Village of Croton-on-Hudson. With
multiple state roadways traversing the Village, there are issues which the Village must rely on the New
York State Dept. of Transportation to address. I have outlined below the issues which remain open as
of the date of this letter:
1. Trees along Route 129 right-of-way (adjacent to Wood Road): A property owner contacted us
on April 8 to report that numerous trees in the state right-of-way are in need of being trimmed
or removed. A tree fell earlier this year which caused $8,000 in damage to the individual’s
vehicle. Email sent to NYSDOT officials on April 9 received no response.
2. Fencing along North Riverside Avenue: The right-of-way fencing along Route 9A has been a
long-standing issue. Much of the fencing has been repaired over the past few years. A small
section remains to be done immediately south of the northbound Senasqua Road exit. Emails
sent on February 20 and April 1 have received no response.
3. Walk button signage: The walk button signage at the intersection of Maple Street and Old Post
Road South has faded. Additionally, some of the crosswalk signage needs to be upgraded to the
new standard sign. NYSDOT acknowledged this request on November 15 and advised it would
be done by the end of the year. Follow up emails sent on March 15 and April 1 received no
response.
4. Paving of State Roadways: We have been told indirectly that Route 9A (Albany Post
Road/North Riverside Avenue) is being paved this year but would appreciate a schedule or other
information that would help our community accommodate and adjust to the anticipated work.
There have been no plans communicated regarding the paving of Route 129 (Maple Street),
even though it has not been paved in this century.
5. Graffiti along Route 9: Another long-standing issue is the presence of graffiti along northbound
Route 9. The latest appearance came on November 3. Subsequent follow-up emails have
advised that it is on the list to be completed, but NYSDOT has not yet finalized the graffiti
removal contract.
6. DOT Snow and Ice Agreement: The Village has not received the standard adjustment for labor-
related increases since 2022. This has led to an ongoing conversation between myself, Victoria
Mayor
Brian Pugh
Trustees
Nora Moriarty Nicholson
Ian Murtaugh
Cara Politi
Len Simon
Village Manager
Bryan T. Healy
Village Treasurer
Daniel Tucker
Village Clerk
Pauline DiSanto
Village of Croton-on-Hudson New York
Stanley H. Kellerhouse Municipal Building
One Van Wyck Street
Croton-on-Hudson, NY 10520-2501
www.crotononhudson-ny.gov
Cafarelli of Assemblymember Dana Levenberg’s office and Mark Casellini from DOT. The
last update which was received on March 6 said that staffing issues in the contract processing
office have led to these delays.
7. Wolf Road fencing: I have recently come across damaged right-of-way fencing along Route 9
adjacent to Wolf Road. I contacted NYSDOT about this issue on May 13.
While seeking a response on regular maintenance issues has been challenging at times, Village staff
continue to work closely with NYSDOT on our various projects (Half Moon Bay Bridge, paving of
Cleveland Drive) and improvements (Rapid Flashing Beacons on Maple Street, new sidewalk along
South Riverside Avenue) and appreciate their support and guidance.
Please let me know if you have any questions regarding the above. I would be happy to provide
additional detail on any or all of these issues if requested.
Cc: Hon. Brian Pugh, Mayor (via email)
Hon. Dana Levenberg, Assemblywoman (via email)
Hon. Peter Harckham, State Senator (via email)
Frank Balbi, Village Superintendent of Public Works (via email)
Daniel O’Connor, Village Engineer (via email)