croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Sunday, August 16, 2026· Aug 16, 2026
Source-linkedCorrections welcomed
Documents

DPW Q2 FY 2025

correspondence 2 pages
Meeting: portal event 1008 (no meeting page on file)
Agenda item: Consent Agenda — Correspondence to the Board — Quarterly Reports - Q2 FY 2025
Correspondence, 2 pages. Attached to agenda item: “Consent Agenda — Correspondence to the Board — Quarterly Reports - Q2 FY 2025”
Retrieved 2026-04-15 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: Clerk Q2 FY 2025 Engineering Q2 FY 2025 Finance Q2 FY 2025 Justice Court Q2 FY 2025 Managers Office Q2 FY 2025 Parking Q2 FY 2025 Police Q2 FY 2025 Recreation Q2 FY 2025
Quarterly Report PUBLIC WORKS QUARTERLY REPORT Fiscal Year 2024/2025 Second Quarter: September 1, 2024 – November 30, 2024 Highway • Continued cleaning sanitary sewer lines and assist Duke Roots for yearly preventative maintenance • Swept 140 miles of roadway • Started the leaf removal program throughout the Village • Installed holiday decor throughout the Village • Repaired 5 catch basins • Cleaned out 30 catch basins • Weekly asphalt maintenance (potholes and water patches) • Trimmed approximately 30 trees • Removed 10 trees (including grinding leftover stumps) • Planted 21 trees Sanitation: • Collected approximately 829 tons of refuse • Weekly collection of Village co-mingled, paper and metal recycling • Collected approximately 200 tons of organic waste Building Maintenance: • Street light repairs • Began Silver Lake Renovations • Replaced various signage throughout Village • HVAC duct cleaning at Municipal Building • Shampoo rugs at Municipal Building Water Department: • Meter reading for water billing • Flushed hydrants • Maintenance to pumps and motors • Plumbing work at Senasqua Bathhouse, Silver Lake and Croton Landing for winterization • Westchester County Health Department inspection • Semi-annual lead and copper samples • Responded to 150 code 53-mark outs • Submission of monthly reports to Westchester County • Assist DPW on low staff days • Completed monthly water sampling • Replaced 32 non-working water meters • Lead service line survey • 168 appointments to determine service line material Department of Public Works Quarterly Report Parks Department: • Remove leaves from Village Parks and Playgrounds • Continued mowing of lawns/field in all Village parks • Litter removal in Village parks and fields Repair Facility: • Continued preparing all necessary vehicles and equipment for the upcoming leaf season and start prep for snow • Weekly inspection and maintenance of all police vehicles • Assist Fire Department with vehicle maintenance Capital Projects: • Excavated, installed and backfilled new concrete foundation for new EMS building • Started structural steel framing for new EMS building • Started to install new granite curbing at Gotwald Circle • Resurfaced Palmer Avenue, Michaels Lane, Nordica Drive dead end, Loconto Street in addition to Olcott Avenue and Oneida Avenue • Continued the design process for the Half Mon Bay Bridge project • Working towards approval for Cleveland resurfacing grant

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.