DPW boiler memo
resolution
1 page
Meeting: portal event 1030 (no meeting page on file)
Agenda item: Proposed Resolutions — Consider declaring the inoperability of the boiler at the DPW Garage to be an emergency situation, authorizing the Village Manager to accept a proposal from HVAC Now, Inc., of Poughkeepsie, New York for the replacement of the boiler in the not-to-exceed amount of $125,500, and authorizing the Village Treasurer to make budget transfers to effectuate same.
Resolution, 1 page. Attached to agenda item: “Proposed Resolutions — Consider declaring the inoperability of the boiler at the DPW Garage to be an emergency situation, authorizing the Village Manager to accept a proposal from HVAC Now, Inc., of Poughkeepsie, New Yor”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Estimate 1317 from Oscar Acosta HVAC NOW
Resolution 66-2025 DPW Boiler
Extracted text
To:
From:
Frank Balbi, Superintendent of Public Works
Date:
March 25, 2025
Re:
Emergency Replacement of DPW Furnace
On Friday March 21, 2025 the furnace at the DPW facility stopped working. When DPW staff
entered the building that morning, it was extremely cold and strong fumes were present. We contacted
our HVAC contractor to diagnose and repair the issue. They spent all day Friday, and most of the
weekend trying to clean/repair the furnace and restore heat to the building. Ultimately, the furnace
was leaking fuel and water from too many areas and could not be repaired. The building has been
without a fully operating heating system since that date.
We need to replace the furnace in the building. One of the options I would like to explore is converting
the existing oil burning system to propane. This project will have a higher cost up front; however, it
will lead to a cleaner burning, more efficient system. This conversion will also remove the existing
underground oil tank from a NYS DEP reservoir buffer area.
The cost to perform this work is approximately $150,000. This includes the work needed to install
the new propane tank, trenching of the surrounding area, plumbing to the new system, as well as the
new boilers and equipment. All work will be performed by a combination of DPW staff as well as
Village contractors.
Currently, we have $102,795.86 remaining in account H1640.2000.18344. This money was
approved and added to this account in order to replace the oil tank. Instead of replacing the tank, I
would like to use this money to fund a majority of the furnace system replacement. Funding for the
remaining $47,204.14 will need to be provided.
Please let me know if any additional information is needed.
Mayor
Brian Pugh
Trustees
Nora Moriarty Nicholson
Cara Politi
Len Simon
Maria F. Slippen
Village Manager
Bryan T. Healy
Village Treasurer
Daniel Tucker
Village Clerk
Pauline DiSanto
Village of Croton-on-Hudson New York
Stanley H. Kellerhouse Municipal Building
One Van Wyck Street
Croton-on-Hudson, NY 10520-2501