croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Sunday, August 16, 2026· Aug 16, 2026
Source-linkedCorrections welcomed
Documents

Estimate 1317 from Oscar Acosta HVAC NOW

resolution 1 page
Meeting: portal event 1030 (no meeting page on file)
Agenda item: Proposed Resolutions — Consider declaring the inoperability of the boiler at the DPW Garage to be an emergency situation, authorizing the Village Manager to accept a proposal from HVAC Now, Inc., of Poughkeepsie, New York for the replacement of the boiler in the not-to-exceed amount of $125,500, and authorizing the Village Treasurer to make budget transfers to effectuate same.
Resolution, 1 page. Attached to agenda item: “Proposed Resolutions — Consider declaring the inoperability of the boiler at the DPW Garage to be an emergency situation, authorizing the Village Manager to accept a proposal from HVAC Now, Inc., of Poughkeepsie, New Yor”
Retrieved 2026-04-15 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: DPW boiler memo Resolution 66-2025 DPW Boiler
ESTIMATE Oscar Acosta HVAC NOW 1 Robert Rd Poughkeepsie, NY 12603 saelhy86@gmail.com +1 (845) 240-2444 Croton-on-Hudson Bill to 1 Van Wyck street Croton-on-hudson NY Ship to 1 Van Wyck street Croton-on-hudson NY Estimate details Estimate no.: 1317 Estimate date: 03/25/2025 # Date Product or service Description Qty Rate Amount 1. Installation Install 2 new Navien NFB-399C L.p gas boiler to replace the 9 section oil boiler $125,500.00 $125,500.00 Note to customer This is the estimate for the DPW main 9 section oil boiler to be replace the with 2 new Navien NFB-399C High efficiency L.P gas boiler Job to be performed: -Remove old boiler from mechanical room -Clean the area and prepare the wall to hang new units -install The new Navien units on the wall -install boiler manifolds -install all boilers pipes for supply and return -install condensation lines -Install new gas line with hangers -Do gas pressure test -install new exhaust and intake flue pipes -install all controls for the new system -Do start up and check proper operation The total cost of this work is $125,500 Total $125,500.00 Accepted date Accepted by

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.