croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Sunday, August 16, 2026· Aug 16, 2026
Source-linkedCorrections welcomed
Documents

NETS Proposal Cordination

resolution 1 page
Meeting: portal event 1036 (no meeting page on file)
Agenda item: Proposed Resolutions — Consider authorizing the Village Manager to accept the proposal from New England Traffic Solutions of Glastonbury, Connecticut, in the amount of $7,350 to enhance the timing of the traffic signals along Croton Point Avenue.
Resolution, 1 page. Attached to agenda item: “Proposed Resolutions — Consider authorizing the Village Manager to accept the proposal from New England Traffic Solutions of Glastonbury, Connecticut, in the amount of $7,350 to enhance the timing of the traffic signals ”
Retrieved 2026-04-15 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: Resolution 74-2025 CPA Lights
52 National Dr. Glastonbury, CT. 06033 860-633-1768; 860-633-1796fax Proposal Estimate: Provide a Video Detection system and the Coordination of Signals at the Route 9/9A ramps on Croton Point Avenue in the Village of Croton on Hudson, NY SCOPE OF WORK Implement coordination plans running background cycles to maintain the relationship between the intersections at the Route 9/9A ramps (NYSDOT owned signals) and the intersection controlling Croton Point Ave at Veterans Plaza. We have contacted NYSDOT Region 8 and have received their permission to make coordination changes to their signal controller at the Route 9/9A ramps. The system will be programmed to provide preferential progression from the Route 9/9A ramps into the parking facilities at Veterans Plaza during the morning peak periods. It will be programmed to provide preferential progression from Veterans Plaza to the Route 9/9A ramps during the afternoon peak periods. A third program will be implemented during off-peak periods and weekends, giving progression designed to minimize queueing between Veterans Plaza and the ramps to the extent possible. It should be noted that the design of the Veterans Plaza sequence makes it difficult to always prevent queuing between these locations. The controller at Veterans Plaza is currently running the four required movements sequentially, with the traffic on each approach being served independently of any other movements at that intersection. By the nature of that sequence, there are always three movements counterproductive to the desired progression. We will balance and mitigate this inefficiency to the extent possible. EXCLUSIONS AND ASSUMPTIONS 1. Signal coordination includes on-site signal programming and observation. 2. Timing adjustments will be made based off field observations. Traffic data collection and desktop traffic analysis is not included. 3. The cost assumes that once work has begun, there are no changes to the project scope. Timing and Coordination $7,350.00 Sincerly, New England Traffic Solutions Claudio Vecchiarino Vice President 4/1/2025 4/1/2025

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.