Westchester County Parks Department Croton Point Park Bulkhead Wall Coping Replacement Project (NYS Project 2023-0878)
document
23 pages
Meeting: portal event 918 (no meeting page on file)
Agenda item: Review of the Village's Local Waterfront Revitalization Program policies by the Village Board to determine consistency related to the Westchester County Parks Department Croton Point Park Bulkhead Wall Coping Replacement Project (NYS Project 2023-0878).
Document, 23 pages. Attached to agenda item: “Review of the Village's Local Waterfront Revitalization Program policies by the Village Board to determine consistency related to the Westchester County Parks Department Croton Point Park Bulkhead Wall Coping Replacement”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
January 10th Resolution 3-2024 Bulkhead LWRP review
LWRP NYS Project 2023-0878
Memo from WAC to VB re%3A NYS Project 2023-0878
Extracted text
O N E C O M M ER C E PL A Z A
99 W A SH I N G T O N A V E N U E
ALBANY, NY 12231-0001
HTTPS://DOS.NY.GOV
KATHY HOCHUL
GOVERNOR
R OB ER T J. R OD R I G UE Z
SECRETARY OF STATE
NYS DEPARTMENT OF STATE
Office of Planning, Development and Community Infrastructure
M E M O R A N D U M
To: Pauline DiSanto
From: NYS Department of State, Coastal Consistency Unit
Date: 12/8/2023
Re: 2023-0878 Hugh Gereechan-Remove and replace
*
*
*
Enclosed is a copy of the Federal Consistency Assessment form and permit application for the
above-referenced project for your information and preliminary review. Please contact the DOS
reviewer assigned to this project, at Barbara.Delaney @dos.ny.gov or to discuss applicable
LWRP policies and concerns, and any additional information which may be necessary to assist
you in reviewing this project.
Any comments you may have will assist the Department in reaching a decision as to the
consistency of the proposed action with the approved Croton-on -Hudson LWRP.
We would appreciate hearing from you on this proposed project within 30 days. If we do not
hear from you by that date, we will presume that you have no objections to the proposed project.
From:
Desanctis, Joseph R. [Joe]
To:
dos.sm.Cstl.CR
Cc:
(nicole.shute@wsp.com); myrosia.dragan@wsp.com; Ghabour, Susie
Subject:
RE: Croton Point Park Joint Application
Date:
Tuesday, December 5, 2023 2:34:34 PM
Attachments:
image001.png
Croton Point Park Coping Replacement Joint Application.pdf
You don't often get email from joseph.desanctis@wsp.com. Learn why this is important
ATTENTION: This email came from an external source. Do not open attachments or click on links from unknown
senders or unexpected emails.
Good Afternoon,
Please find the attached updated Joint Application for the Croton Point Park Bulkhead Wall Coping
Replacement project.
Please reach out if a hard copy is required or you have any questions or concerns.
Joe
From: Desanctis, Joseph R. [Joe]
Sent: Tuesday, December 5, 2023 2:16 PM
To: cr@dos.ny.gov
Cc: Shute, Nicole <Nicole.Shute@wsp.com>; Dragan, Myrosia K. <Myrosia.Dragan@wsp.com>;
Ghabour, Susie <shga@westchestercountyny.gov>
Subject: Croton Point Park Joint Application
Good Afternoon,
Please find attached a Joint Application for the Croton Point Park Bulkhead Wall Coping Replacement
project for Westchester County Department of Public Works & Transportation in Region 3,
Westchester County, New York. Please note that NYSDEC provided us with a Notice of No
Jurisdiction for the work proposed, which can be supplied upon request.
Please reach out if a hard copy is required or you have any questions or concerns.
Joe
Joe DeSanctis
Assistant Engineer
Office 914-801-0886
Mobile 914-582-1552
Joseph.DeSanctis@wsp.com
WSP USA Inc.
500 Summit Lake Drive
4th Floor, Suite 450
Valhalla, NY 10595
wsp.com
NOTICE: This communication and any attachments ("this message") may contain information which is privileged, confidential, proprietary
or otherwise subject to restricted disclosure under applicable law. This message is for the sole use of the intended recipient(s). Any
unauthorized use, disclosure, viewing, copying, alteration, dissemination or distribution of, or reliance on, this message is strictly
prohibited. If you have received this message in error, or you are not an authorized or intended recipient, please notify the sender
immediately by replying to this message, delete this message and all copies from your e-mail system and destroy any printed copies.
-LAEmHhHzdJzBlTWfa4Hgs7pbKl
JOINT APPLICATION FORM
For Permits for activities activities affecting streams, waterways, waterbodies, wetlands, coastal areas, sources of water,
and endangered and threatened species.
You must separately apply for and obtain Permits from each involved agency before starting work. Please read
all instructions.
1. Applications To:
>NYS Department of Environmental Conservation
Check here to confirm you sent this form to NYSDEC.
Check all permits that apply:
Tidal Wetlands
Wild, Scenic and
Recreational Rivers
Coastal Erosion
Management
Water Withdrawal
Long Island Well
Incidental Take of
Endangered /
Threatened Species
Stream Disturbance
Excavation and Fill in
Navigable Waters
Docks, Moorings or
Platforms
>US Army Corps of Engineers
Check here to confirm you sent this form to USACE.
Check all permits that apply:
Section 404 Clean Water Act
Section 10 Rivers and Harbors Act
Is the project Federally funded?
Yes
No
If yes, name of Federal Agency:
General Permit Type(s), if known:
Preconstruction Notification:
Yes
No
>NYS Office of General Services
Check here to confirm you sent this form to NYSOGS.
Check all permits that apply:
State Owned Lands Under Water
Utility Easement (pipelines, conduits, cables, etc.)
Docks, Moorings or Platforms
>NYS Department of State
Check here to confirm you sent this form to NYSDOS.
Check if this applies:
Coastal Consistency Concurrence
2. Name of Applicant
Taxpayer ID (if applicant is NOT an individual)
Mailing Address
Post Office / City
State Zip
Telephone
Email
Applicant Must be (check all that apply):
Owner
Operator
Lessee
3. Name of Property Owner (if different than Applicant)
Mailing Address
Post Office / City
State Zip
Telephone
Email
For Agency Use Only
Agency Application Number:
JOINT APPLICATION FORM 04/22
Dams and Impound-
ment Structures
401 Water Quality
Certification*
Freshwater Wetlands
*6HH,QVWUXFWLRQV
SDJH
Hugh Greechan, Commissioner of Westchester County DPW&T
148 Martine Ave
White Plains
NY
(914) 995-2546
hjg7@westchestercountyny.gov
RESET
Nationwide Permit 3 - Maintenance
JOINT APPLICATION FORM – Continued. Submit this completed page as part of your Application.
4. Name of Contact / Agent
Mailing Address
Post Office / City
State Zip
Telephone
Email
5. Project / Facility Name
Property Tax Map Section / Block / Lot Number:
Project Street Address, if applicable
Post Office / City
State Zip
NY
Provide directions and distances to roads, intersections, bridges and bodies of water
Town
Village
City
County
Stream/Waterbody Name
Project Location Coordinates: Enter Latitude and Longitude in degrees, minutes, seconds:
Latitude:
'
"
Longitude:
'
"
6. Project Description: Provide the following information about your project. Continue each response and provide
any additional information on other pages. Attach plans on separate pages.
a. Purpose of the proposed project:
b. Description of current site conditions:
c. Proposed site changes:
d. Type of structures and fill materials to be installed, and quantity of materials to be used (e.g., square feet of
coverage, cubic yards of fill material, structures below ordinary/mean high water, etc.):
e. Area of excavation or dredging, volume of material to be removed, location of dredged material placement:
f. Is tree cutting or clearing proposed?
Yes If Yes, explain below.
No
Timing of the proposed cutting or clearing (month/year):
Number of trees to be cut:
Acreage of trees to be cleared:
JOINT APPLICATION FORM 04/22
WSP USA Inc. - Joseph DeSanctis
500 Summit Lake Drive, Suite 450
Valhalla
NY
(914) 801-0886
Joseph.DeSanctis@wsp.com
Croton Point Park Bulkhead Wall Coping Replacement
89.12-1-1
1 Croton Point Park Ave.
Enter Croton Point Park via Croton Point Avenue. Keep right after the toll booth for 3,000 ft towards the western most parking lot located between
the North and South Playgrounds. Follow the asphalt path located at the south end of the parking lot towards the Hudson river bulkhead wall.
Croton
Westchester
Hudson River
52.3N
-73
01.1W
To replace the concrete coping on the Croton Point Park seawall along the Hudson River. The existing seawall coping was damaged and
pushed off the existing seawall during the remnants of Hurricane Ida, which hit the area in the fall of 2021.
Remaining structures includes the seawall along the Hudson River. Two sections of coping, measuring approximately 404 ft and 23 ft in length,
disconnected from the bulkhead resulting from broken Z-angle steel connections that fastened the coping segments to the bulkhead wall. Some
of the existing z-angles that connected the concrete coping to the seawall remain on the seawall, although most are damaged and/or broken. A
dip in the grading of approximately 3” deep by 15” wide behind the bulkhead wall in the lengths of damaged coping appear to have been
caused by settlement or washout due to the storm. This area is also bare of grass or vegetation.
The existing seawall will remain, and the existing concrete coping will be removed and disposed. The damaged/displaced existing precast
concrete coping segments will not be returned to their original position. They will instead be replaced by a new hybrid system employing both
precast and cast-in-place elements to ensure better stability, rigidity, and connection to the seawall sheeting. Improvements include providing a
larger coping “tail”, buried in the fill behind the seawall and completely encasing the new steel connections to the seawall.
30 CY of cast-in-place concrete will be placed behind the seawall for the hybrid coping system. 11 CY of topsoil, 96 SY of turf establishment,
and 20 CY of crushed gravel will be placed behind the seawall the grade between the hybrid copings system and the surrounding existing
grade. There will be no area of fill below the MHW elevation.
20 CY (475 SF along the proposed 430 ft. project area) will be excavated removing the existing back-fill to accommodate the volume of the
proposed cast-in-place concrete segment of the hybrid coping system.
N/A
RESET
JOINT APPLICATION FORM – Continued. Submit this completed page as part of your Application.
g. Work methods and type of equipment to be used:
h. Describe the planned sequence of activities:
i.
Pollution control methods and other actions proposed to mitigate environmental impacts:
j.
Erosion and silt control methods that will be used to prevent water quality impacts:
k. Alternatives considered to avoid regulated areas. If no feasible alternatives exist, explain how the project will
minimize impacts:
l.
Proposed use:
Private
Public
Commercial
m. Proposed Start Date:
Estimated Completion Date:
n. Has work begun on project?
Yes If Yes, explain below.
No
o. Will project occupy Federal, State, or Municipal Land?
Yes If Yes, explain below.
No
p. List any previous DEC, USACE, OGS or DOS Permit / Application numbers for activities at this location:
q. Will this project require additional Federal, State, or Local authorizations, including zoning changes?
Yes If Yes, list below.
No
JOINT APPLICATION FORM 04/22
Typical construction methods and equipment for material delivery, precast concrete and installation of proposed concrete are anticipated.
However, the exact means and methods of proposed equipment to be used will be determined by the contractor. Expected equipment used by
the contractor will likely include dump trucks, concrete pumps, welding tools, backhoe, bucket truck or scissor lift, crane, excavator, etc.
Install erosion and sediment control measures. Remove and dispose of existing damaged concrete coping segments. Excavate grade/back-fill
behind the seawall sheeting. install form-work for cast-in-place concrete segments. Remove existing z-angle segments. Install shear studs.
Install cast-in-place concrete rebar reinforcement. Install precast concrete segment. Pour cast-in-place concrete. Remove cast-in-place concrete
form-work. Place embankment in place, topsoil, and seeding land-side of the sheeting. Remove erosion and sediment control measures.
Turbidity curtains and silt fences will be installed in the construction site to protect the Hudson River.
Turbidity curtains and silt fences will be installed in the construction site to protect the Hudson River.
The project will minimize impacts by not employing any excavation or excavation services below the MHW level. Moreover, no work will required
within the Hudson River.
September 1, 2024
October 31, 2024
No.
Yes, the project site is owned by Westchester County.
Notice of No Jurisdiction NYSDEC ID: 3-5522-00064/00009
RESET
Environmental Resource Mapper
County of Westchester, State of New Jersey, Esri, HERE, Garmin,
INCREMENT P, USGS, METI/NASA, EPA, USDA
October 24, 2023
0.3
0.6
0.15
mi
0.5
0.25
km
1:18,056
NYS Department of Environmental Conservation
Not a legal document
CROTON POINT PARK SEAWALL BULKHEAD REPAIR
PROJECT LOCATION
LOCATION MAP
WESTCHESTER COUNTY
SCALE: N.T.S.
CONTRACT No. 02-545-REV
CROTON POINT PARK
BULKHEAD WALL COPING REPLACEMENT
CROTON POINT PARK
CROTON-ON-HUDSON, NEW YORK
WESTCHESTER COUNTY, NEW YORK
DIVISION OF ENGINEERING
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
SHEET NO.
SHEET TITLE
DPW FILE NO.
T-001
TITLE SHEET
##-##-X-###
L-001
LEGENDS, ABBREVIATIONS, AND ESTIMATE OF QUANTITIES
##-##-X-###
GN-001
GENERAL NOTES
##-##-X-###
CN-001
GENERAL, ACCESS, EROSION & SEDIMENT CONTROL, AND
CONSTRUCTION SEQUENCE PLAN
##-##-X-###
S-001
EXISTING CONCRETE COPING DETAILS
##-##-X-###
S-002
PROPOSED CONCRETE COPING DETAILS
##-##-X-###
D-001
EXCAVATION AND RESTORATION DETAILS
##-##-X-###
LONG ISLAND SOUND
NEW YORK
CITY OF
RIVER
PUTNAM COUNTY
HUDSON
STATE OF CONNECTICUT
PROJECT LOCATION
PROJECT LOCATION
NYSDOT STANDARD SHEET(S)
BY REFERENCE THE FOLLOWING NEW YORK STATE
DEPARTMENT OF TRANSPORTATION STANDARD SHEETS
ARE INCLUDED IN THE DRAWINGS FOR THIS PROJECT:
(TO BE FURNISHED TO THE ENGINEER IN THE FIELD
AND PAID FOR BY THE CONTRACTOR PRIOR TO THE
START OF CONSTRUCTION).
209-01, 209-06, 619-001, 619-002, 619-010, 619-011.
WSP USA ▪ 500 Summit Lake Drive, Suite 450 ▪ Valhalla, NY 10595 ▪ 914.747.1120
INCLUDED IN THIS
APPLICATION
X
X
X
X
22'-9.5"
227'-0"
158'-0"
20'-0"
PROPOSED CONCRETE COPING
ITEMS 555.0105, 556.0202, 556.03, & 560.07
SEE SHEET S-002 FOR DETAILS
PROPOSED CONCRETE COPING
ITEMS 555.0105, 556.0202, 556.03, & 560.07
SEE SHEET S-002 FOR DETAILS
CONTRACTOR TO ACCESS
CONSTRUCTION SITE VIA PREVIOUSLY
CONSTRUCTED ASPHALT PEDESTRIAN
PATHWAY FROM CROTON POINT PARK
WEST PARKING LOT
±35 LF TURBIDITY CURTAIN
ITEM 209.1501
±420 LF TURBIDITY CURTAIN
ITEM 209.1501
±55 LF SILT FENCE
ITEM 209.13
±455 LF SILT FENCE
ITEM 209.13
PLACE AND REMOVE EXISTING
TEMPORARY PLASTIC BARRIER FENCE
ITEMS 607.41010010 & 607.9600008
PLACE AND REMOVE EXISTING
TEMPORARY PLASTIC BARRIER FENCE
ITEMS 607.41010010 & 607.9600008
RE-GRADE WITH EMBANKMENT IN PLACE
(ITEM 203.03), TOPSOIL (ITEM 610.1402), AND
TURF ESTABLISHMENT (ITEM 610.1602).
SEE SHEET D-001
CONSTRUCTION SEQUENCE NOTES:
1.
INSTALL EROSION AND SEDIMENT CONTROL MEASURES,
INCLUDING SILT FENCES, AND TURBIDITY CURTAINS.
2.
REMOVE EXISTING DAMAGED CONCRETE COPING SEGMENTS.
THE CONTRACTOR SHALL INSURE THAT THE SEGMENTS
SHALL BE DISPOSED OF IN A PERMITTED CONSTRUCTION
AND DEMOLITION WASTE MANAGEMENT OR PROCESSING
FACILITY.
3.
EXCAVATE EXISTING GRADE BEHIND THE EXISTING SEAWALL
SHEETING FOR THE INSTALLATION OF THE CAST-IN-PLACE
CONCRETE SEGMENT.
4.
REMOVE EXISTING Z-ANGLE SEGMENTS AND INSTALL SHEAR
STUDS TO THE EXISTING SEAWALL SHEETING LANDSIDE.
5.
INSTALL FORMWORK FOR CAST-IN-PLACE CONCRETE PRIOR
TO
THE
INSTALLATION
OF
THE
PRECAST
CONCRETE
SEGMENT. CONTRACTOR SHALL ENSURE THAT FORMWORK
IS SEALED AS NECESSARY (INCLUDING THE USE OF A
PRE-MOLDED JOINT FILLER) AND DOES NOT ALLOW ANY
CONCRETE TO LEAK INTO THE RIVER. INSTALL REBAR FOR
THE CAST-IN-PLACE CONCRETE SEGMENT ACCOUNTING FOR
THE EVENTUAL LOCATION OF THE PROTRUDING DOWELS
PRESENT IN THE PRECAST CONCRETE SEGMENTS.
6.
INSTALL AND SECURE NEW PRECAST CONCRETE COPING
SEGMENTS ON THE EXISTING SEAWALL.
7.
POUR CAST-IN-PLACE CONCRETE BELOW THE PREVIOUSLY
INSTALLED PRECAST CONCRETE SEGMENTS.
8.
REMOVE APPROPRIATE AND UNNECESSARY CAST-IN-PLACE
CONCRETE
FORMWORK
AFTER
THE
CAST-IN-PLACE
CONCRETE HAS CURED.
9.
PLACE EMBANKMENT IN PLACE, TOPSOIL AND SEEDING
LANDSIDE OF THE SHEETING BEHIND THE NEWLY INSTALLED
COPING. REGRADE THE ADJACENT AREA TO MEET THE
EXISTING GRADE.
10.
REMOVE
THE
SEDIMENT
CONTROL
MEASURES
AND
TEMPORARY PLASTIC BARRIER FENCE.
11.
RESTORE UNPAVED SURFACES OF THE CONSTRUCTION
ACCESS ROUTE WHEN WORK IS COMPLETE.
WORK ZONE CONTROL NOTES:
1.
CONTRACTOR SHALL SECURE WORK ZONES AND STAGING
AREAS WITH FENCING OR CONTRUCTION BARRICADES TO
PREVENT PUBLIC ACCESS.
2.
WARNING SIGNS STATING "DANGER WORK ZONE" SHALL BE
MOUNTED ON FENCING OR CONSTRUCTION BARRICADES
AND SHALL FACE PATHS SO AS TO BE EASILY VISIBLE TO
PATH USERS.
3.
SEPARATE PAYMENT SHALL NOT BE MADE FOR THE WORK
DESCRIBED IN THIS SECTION. CONTRACTOR SHALL INCLUDE
COST OF WORK ZONE TRAFFIC CONTROL IN THE VARIOUS
CONTRACT PAY ITEMS.
NUMBER
REVISION
BY
APP'D
BY
MADE
DATE
REVISION
CONTRACTOR
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
SIGNATURE
TITLE
NAME
DATE
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CHECKED BY
IN CHARGE OF
MADE BY
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
CONTRACT
NUMBER
SHEET NO. OF
DATE:
SHEET
NUMBER
SCALE:
DPW FILE NO.
REV.
NO.
WSP USA ▪ 500 Summit Lake Drive, Suite 450 ▪ Valhalla, NY 10595 ▪ 914.747.1120
CONSTRUCTION SEQUENCE PLAN
GENERAL, ACCESS, EROSION & SEDIMENT CONTROL, AND
BULKHEAD WALL COPING REPLACEMENT
CROTON POINT PARK
##-##-X-###
DECEMBER 2023
1"=40'
CN-001
02-545-REV
J.D.
M.D.
N.S.
SCALE IN FEET
PROPOSED CONCRETE COPING SEGMENT
PLAN VIEW
1'-11"
1'-1.5"
SECTION A-A
PROPOSED CONCRETE COPING SECTION
DETAIL
EXISTING GRADE
PROPOSED PRECAST CONCRETE CAP
ITEM 560.07
± 3'-3"
PROPOSED CAST-IN-PLACE
CONCRETE FILL
ITEM 555.0105
± 1'-6"
1'-11"
1'-1.5"
SECTION B-B
PROPOSED CONCRETE COPING SECTION
DETAIL
MHW EL. +1.76
± 3'-11"
± 1'-6"
± 1'-4"
± 7"
PROPOSED GRADE
EXISTING GRADE
PROPOSED PRECAST CONCRETE CAP
ITEM 560.07
PROPOSED CAST-IN-PLACE
CONCRETE FILL
ITEM 555.0105
PROPOSED GRADE
DOWELS CAST INTO PRECAST
CONCRETE CAP
#5 @ 12"
SEE NOTES 1 AND 2
DOWELS CAST INTO PRECAST
CONCRETE CAP
#5 @ 12"
SEE NOTES 1 AND 2
NOTES:
1.
DOWELS CAST INTO PRECAST CONCRETE CAP. SUGGESTED SEQUENCE IS TO
PLACE CAST-IN-PLACE CONCRETE AFTER PRECAST CONCRETE CAP IS ALREADY
IN PLACE (TEMPORARY SUPPORT IS REQUIRED)
2.
CONTRACTOR SHALL ENSURE THAT FORMWORK IS SEALED AS NECESSARY AND
THE FRONT SIDE OF THE SHEETING SHALL BE WATER-TIGHT. CONTRACTOR SHALL
TAKE PRECAUTIONS INCLUDING THE USE OF A PRE-MOLDED JOINT FILLER TO
ENSURE THAT NO CONCRETE SEEPS OR LEAKS THROUGH THE SHEETING AND
INTO THE RIVER. COST INCLUDED UNDER ITEM 555.01015.
3.
CONTRACTOR SHALL TAKE STEPS NECESSARY TO ENSURE FULL CONTACT AND
FULL BOND BETWEEN PRECAST CONCRETE AND CAST-IN-PLACE CONCRETE.
4.
ALL ELEVATIONS SHOWN ARE WITH RESPECT TO THE NORTH AMERICAN
VERTICAL DATUM OF 1988 (NAVD 88). THE MHW ELEVATIONS WERE PROVIDED BY
THE DEC WITH RESPECT TO NAVD 88. THE ELEVATIONS OF THE SHEETING WERE
NOTED WITH RESPECT TO THE NATIONAL GEODETIC VERTICAL DATUM OF 1929
(NGVD 29) ON THE RECORD PLANS PROVIDED BY WESTCHESTER COUNTY. A
CONVERSION FACTOR OF +1.1 FEET WAS ADDED TO CONVERT THE ELEVATIONS
OF THE SHEETING FROM NGVD 29 TO NAVD 88.
5.
PROPOSED PRECAST CONCRETE COPING SHALL HAVE A TIMBER TEXTURE FINISH
TO MATCH EXISTING CONCRETE COPING SEGMENTS.
6.
COLORING OF PROPOSED PRECAST CONCRETE COPING SEGMENTS SHALL
MATCH EXISTING CONCRETE COPING SEGMENTS AS CLOSE AS POSSIBLE.
7.
CONTRACTOR SHALL PROPOSE CONCRETE INSTALLATION METHODS TO REDUCE
THE POTENTIAL OF VOIDS IN THE FORMWORK. CONTRACTOR MAY INCREASE
CONCRETE SLUMP UP TO 5" WITH APPROVAL OF CONCRETE MIX DESIGN.
#6 @ 6" (VERTICALLY SPACED)
LONGITUDINAL REBAR (TYP.)
ITEM 556.0202
#6 @ 6" (VERTICALLY SPACED)
LONGITUDINAL REBAR (TYP.)
ITEM 556.0202
11'-6" SEGMENTS (TYP.)
1'-11"
B
B
PROPOSED CONCRETE COPING
ITEM 560.07
(SEE NOTES 5 AND 6)
PROPOSED CAST-IN-PLACE
CONCRETE FILL
ITEM 555.0105
#6 @ 6" LONGITUDINAL REBAR (TYP.)
ITEM 556.0202
ROUGHENED SURFACE
SEE NOTE 3
6" LONG STEEL SHEAR STUDS (TYP.)
ITEM 556.03
6" LONG STEEL SHEAR STUDS
ITEM 556.03
MHW EL. +1.76
SHEETING EL. +7.00
SHEETING EL. +7.00
A
A
CROTON POINT PARK LANDSIDE
HUDSON RIVER
6"
6"
8"
8"
#5 @ 12 TRANSVERSE BAR (TYP.)
ITEM 556.0202
6"
6"
1"
1"
PROPOSED CONCRETE COPING BEVEL DETAIL
N.T.S
4" DIAM. PVC SLEEVE IN PRECAST CONCRETE COPING
CENTERED AT EACH SEAWALL CORRUGATION TO BE USED
FOR THE PLACEMENT OF CAST-IN-PLACE CONCRETE.
HOLE TO BE FILLED FLUSH TO THE TOP OF COPING.
CONTRACTOR TO FIELD VERIFY BEFORE FABRICATION
COST INCLUDED UNDER ITEM 560.07
45°
4" DIAM. PVC SLEEVE IN PRECAST CONCRETE COPING
CENTERED AT EACH SEAWALL CORRUGATION TO BE USED
FOR THE PLACEMENT OF CAST-IN-PLACE CONCRETE.
HOLE TO BE FILLED FLUSH TO THE TOP OF COPING.
CONTRACTOR TO FIELD VERIFY BEFORE FABRICATION
COST INCLUDED UNDER ITEM 560.07
ROUGHENED SURFACE
SEE NOTE 3
6"
1'-5"
1'-6"
6"
1'-5"
1'-6"
1'-8"
10"
NUMBER
REVISION
BY
APP'D
BY
MADE
DATE
REVISION
CONTRACTOR
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
SIGNATURE
TITLE
NAME
DATE
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CHECKED BY
IN CHARGE OF
MADE BY
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
CONTRACT
NUMBER
SHEET NO. OF
DATE:
SHEET
NUMBER
SCALE:
DPW FILE NO.
REV.
NO.
WSP USA ▪ 500 Summit Lake Drive, Suite 450 ▪ Valhalla, NY 10595 ▪ 914.747.1120
PROPOSED CONCRETE COPING DETAILS
BULKHEAD WALL COPING REPLACEMENT
CROTON POINT PARK
#
##-##-X-###
DECEMBER 2023
1:10
S-002
02-545-REV
J.D.
M.D.
N.S.
SCALE IN FEET
SECTION A-A
PROPOSED CONCRETE COPING SECTION
EXCAVATION DETAIL
EXISTING GRADE
PROPOSED PRECAST CONCRETE CAP
ITEM 560.07
± 3'-6"
PROPOSED CAST-IN-PLACE
CONCRETE FILL
ITEM 555.0105
SECTION B-B
PROPOSED CONCRETE COPING SECTION
EXCAVATION DETAIL
± 4'-2"
EXISTING GRADE
PROPOSED PRECAST CONCRETE CAP
ITEM 560.07
PROPOSED CAST-IN-PLACE
CONCRETE FILL
ITEM 555.0105
MHW EL. +1.76
SHEETING EL. +7.00
SHEETING EL. +7.00
EXCAVATE EXISTING GRADE
ITEM 203.0201
± 1'-1"
EXCAVATE EXISTING GRADE
ITEM 203.0201
± 1'-10"
± 1'-0"
± 1'-0"
SECTION A-A
PROPOSED CONCRETE COPING SECTION
FILL DETAIL
EXISTING GRADE
PROPOSED PRECAST CONCRETE CAP
ITEM 560.07
± 2'-11"
PROPOSED CAST-IN-PLACE
CONCRETE FILL
ITEM 555.0105
SECTION B-B
PROPOSED CONCRETE COPING SECTION
FILL DETAIL
± 2'-11"
EXISTING GRADE
PROPOSED PRECAST CONCRETE CAP
ITEM 560.07
PROPOSED CAST-IN-PLACE
CONCRETE FILL
ITEM 555.0105
MHW EL. +1.76
SHEETING EL. +7.00
SHEETING EL. +7.00
EMBANKMENT IN PLACE
ITEM 203.03
± 8"
± 4"
TOPSOIL
ITEM 610.1402
TURF ESTABLISHMENT
ITEM 610.1602
EMBANKMENT IN PLACE
ITEM 203.03
± 8"
± 4"
TOPSOIL
ITEM 610.1402
TURF ESTABLISHMENT
ITEM 610.1602
MHW EL. +1.76
MHW EL. +1.76
6" MIN.
6" MIN.
NUMBER
REVISION
BY
APP'D
BY
MADE
DATE
REVISION
CONTRACTOR
AS BUILT - NO CHANGES
AS BUILT - CHANGES AS NOTED
RECORD DRAWING CERTIFICATION
SIGNATURE
TITLE
NAME
DATE
PROJECT COORDINATOR
SIGNATURE
TITLE
NAME
DATE
CHECKED BY
IN CHARGE OF
MADE BY
WESTCHESTER COUNTY, NEW YORK
DEPARTMENT OF PUBLIC WORKS AND TRANSPORTATION
DIVISION OF ENGINEERING
CONTRACT
NUMBER
SHEET NO. OF
DATE:
SHEET
NUMBER
SCALE:
DPW FILE NO.
REV.
NO.
WSP USA ▪ 500 Summit Lake Drive, Suite 450 ▪ Valhalla, NY 10595 ▪ 914.747.1120
EXCAVATION AND RESTORATION DETAILS
BULKHEAD WALL COPING REPLACEMENT
CROTON POINT PARK
#
##-##-X-###
DECEMBER 2023
1:10
D-001
02-545-REV
J.D.
M.D.
N.S.
SCALE IN FEET
Attachment 1
Croton Point Park Seawall Bulkhead Repair
Site Photos
Croton Point Park, Westchester County, NY
1 | 2
Photo No. 1
Location:
22 ft. northern
portion, view
north.
Description:
General view
of damaged
concrete
coping on the
northern
portion of the
existing
seawall.
Photo No. 2
Location:
22 ft. northern
portion, view
south.
Description:
General view
of damaged
concrete
coping on the
northern
portion of the
existing
seawall.
Attachment 1
Croton Point Park Seawall Bulkhead Repair
Site Photos
Croton Point Park, Westchester County, NY
2 | 2
Photo No. 3
Location:
430 ft.
southern
portion, view
north.
Description:
General view
of damaged
concrete
coping on the
southern
portion of the
existing
seawall.
Photo No. 4
Location:
430 ft.
southern
portion, view
south.
Description:
General view
of damaged
concrete
coping on the
southern
portion of the
existing
seawall.
Attachment 1
Croton Point Park Seawall Bulkhead Repair
Site Photos
Croton Point Park, Westchester County, NY
3 | 2
Photo No. 5
Location:
430 ft.
southern
portion section
view, view
north.
Description:
Section view of
an existing
displaced and
damaged
concrete
coping
segment.
Photo No. 6
Location:
430 ft.
southern
portion,
section view,
view south.
Description:
Section view of
an existing
displaced and
damaged
concrete
coping
segment.
Attachment 1
Croton Point Park Seawall Bulkhead Repair
Site Photos
Croton Point Park, Westchester County, NY
4 | 2
Photo No. 7
Location:
South
elevation, view
south.
Description:
View of
existing
seawall just
south of the
project
location.
Photo No. 8
Location:
430 ft.
southern
portion,
section view.
Description:
Section view of
a remaining PZ-
22 seawall bay.
Attachment 1
Croton Point Park Seawall Bulkhead Repair
Site Photos
Croton Point Park, Westchester County, NY
5 | 2
Photo No. 9
Location:
430 ft.
southern
portion.
Description:
Detail view of
the broken z-
angle
connector on
existing
displaced
concrete
coping
segment.
Photo No. 10
Location:
430 ft.
southern
portion.
Description:
Detail view of
the broken z-
angle
connectors on
the existing
seawall.
Attachment 1
Croton Point Park Seawall Bulkhead Repair
Site Photos
Croton Point Park, Westchester County, NY
6 | 2
Photo No. 11
Location:
430 ft.
southern
portion.
Description:
General view
of eroded
existing grade.
NEW YORK STATE DEPARTMENT OF STATE
COASTAL MANAGEMENT PROGRAM
Federal Consistency Assessment Form
An applicant, seeking a permit, license, waiver, certification or similar type of approval from a federal agency which
is subject to the New York State Coastal Management Program (CMP), shall complete this assessment form for any
proposed activity that will occur within and/or directly affect the State's Coastal Area. This form is intended to
assist an applicant in certifying that the proposed activity is consistent with New York State's CMP as required by
U.S. Department of Commerce regulations (15 CFR 930.57). It should be completed at the time when the federal
application is prepared. The Department of State will use the completed form and accompanying information in its
review of the applicant's certification of consistency.
A. APPLICANT (please print)
1. Name: _____________________________________________________________________________________
2. Address: ___________________________________________________________________________________
3. Telephone: Area Code (
) __________________________________________________________________
B. PROPOSED ACTIVITY:
1. Brief description of activity:
2. Purpose of activity:
3. Location of activity:
______________________ __________________________ __________________________
County
City, Town, or Village
Street or Site Description
4. Type of federal permit/license required: ______________________________________________________
5. Federal application number, if known: _______________________________________________________
6. If a state permit/license was issued or is required for the proposed activity, identify the state agency and
provide the application or permit number, if known:
Joseph DeSanctis
500 Summit Lake Drive, 4th Floor, Suite 450, Valhalla, NY, 10595
(914) 801-0886
The project proposes to replace the concrete coping on the Croton Point Park
seawall along the Hudson River with a hybrid concrete system. The surrounding
grade land-side will be restored. No work will be done in the Hudson River.
The existing seawall coping was damaged and pushed off the existing seawall
during Hurricane Ida. The proposed solution mitigates this potential failure.
N/A
1 Croton Point Park Ave
N/A
N/A
C. COASTAL ASSESSMENT Check either "YES" or "NO" for each of these questions. The numbers following
each question refer to the policies described in the CMP document (see footnote on page 2) which may be affected
by the proposed activity.
1. Will the proposed activity result in any of the following:
YES/NO
a.
Large physical change to a site within the coastal area which will require the preparation of an
environmental impact statement? (11, 22, 25, 32, 37, 38, 41, 43)
__ __
b. Physical alteration of more than two acres of land along the shoreline, land under water or
coastal waters? (2, 11, 12, 20, 28, 35, 44)
__ __
c. Revitalization/redevelopment of a deteriorated or underutilized waterfront site? (1)
__ __
d. Reduction of existing or potential public access to or along coastal waters? (19, 20)
__ __
e. Adverse effect upon the commercial or recreational use of coastal fish resources? (9,10)
__ __
f. Siting of a facility essential to the exploration, development and production of energy
resources in coastal waters or on the Outer Continental Shelf? (29)
__ __
g. Siting of a facility essential to the generation or transmission of energy? (27)
__ __
h. Mining, excavation, or dredging activities, or the placement of dredged or fill material in
coastal waters? (15, 35)
__ __
i. Discharge of toxics, hazardous substances or other pollutants into coastal waters? (8, 15, 35) __ __
j. Draining of stormwater runoff or sewer overflows into coastal waters? (33)
__ __
k. Transport, storage, treatment, or disposal of solid wastes or hazardous materials? (36, 39)
__ __
l. Adverse effect upon land or water uses within the State's small harbors? (4)
__ __
2. Will the proposed activity affect or be located in, on, or adjacent to any of the following:
YES/NO
a. State designated freshwater or tidal wetland? (44)
__ __
b. Federally designated flood and/or state designated erosion hazard area? (11, 12, 17)
__ __
c. State designated significant fish and/or wildlife habitat? (7)
__ __
d. State designated significant scenic resource or area? (24)
__ __
e. State designated important agricultural lands? (26)
__ __
f. Beach, dune or Barrier Island? (12)
__ __
g. Major ports of Albany, Buffalo, Ogdensburg, Oswego or New York? (3)
__ __
h. State, county, or local park? (19, 20)
__ __
i. Historic resource listed on the National or State Register of Historic Places? (23)
__ __
3. Will the proposed activity require any of the following:
YES/NO
a. Waterfront site? (2, 21, 22)
__ __
b. Provision of new public services or infrastructure in undeveloped or sparsely populated
sections of the coastal area? (5)
__ __
c. Construction or reconstruction of a flood or erosion control structure? (13, 14, 16)
__ __
d. State water quality permit or certification? (30, 38, 40)
__ __
e. State air quality permit or certification? (41, 43)
__ __
4. Will the proposed activity occur within and/or affect an area covered by a State-approved local
waterfront revitalization program, or State-approved regional coastal management program?
__ __
(see policies in program document*)
D. ADDITIONAL STEPS
1. If all of the questions in Section C are answered "NO", then the applicant or agency shall complete Section E and
submit the documentation required by Section F.
2. If any of the questions in Section C are answered "YES", then the applicant or agent is advised to consult the
CMP, or where appropriate, the local waterfront revitalization program document*. The proposed activity must be
analyzed in more detail with respect to the applicable state or local coastal policies. On a separate page(s), the
applicant or agent shall: (a) identify, by their policy numbers, which coastal policies are affected by the activity, (b)
briefly assess the effects of the activity upon the policy; and, (c) state how the activity is consistent with each policy.
Following the completion of this written assessment, the applicant or agency shall complete Section E and submit
the documentation required by Section F.
E. CERTIFICATION
The applicant or agent must certify that the proposed activity is consistent with the State's CMP or the approved
local waterfront revitalization program, as appropriate. If this certification cannot be made, the proposed activity
shall not be undertaken. If this certification can be made, complete this Section.
"The proposed activity complies with New York State's approved Coastal Management Program, or with the
applicable approved local waterfront revitalization program, and will be conducted in a manner consistent with such
program."
Applicant/Agent's Name: _____________________________________________________________________
Address: __________________________________________________________________________________
Telephone: Area Code ( ) ________________________________________________________________
Applicant/Agent's Signature: __________________________________________ Date: ___________________
F. SUBMISSION REQUIREMENTS
1. The applicant or agent shall submit the following documents to the New York State Department of State,
Office of Planning and Development, Attn: Consistency Review Unit, One Commerce Plaza-Suite 1010,
99 Washington Avenue, Albany, New York 12231.
a. Copy of original signed form.
b. Copy of the completed federal agency application.
c. Other available information which would support the certification of consistency.
2. The applicant or agent shall also submit a copy of this completed form along with his/her application to the
federal agency.
3. If there are any questions regarding the submission of this form, contact the Department of State at
(518) 474-6000.
*These state and local documents are available for inspection at the offices of many federal agencies, Department of
environmental Conservation and Department of State regional offices, and the appropriate regional and county planning agencies.
Local program documents are also available for inspection at the offices of the appropriate local government.
Joseph DeSanctis
500 Summit Lake Drive, 4th Floor, Suite 450, Valhalla, NY, 10595
(914) 801-0886
11/08/2023
ATTACHMENT TO THE NEW YORK STATE DEPARTMENT OF STATE COASTAL MANAGEMENT PROGRAM
FEDERAL CONSISTENCY ASSESSMENT FORM
D. ADDITIONAL STEPS
QuesƟon C.2.c: State designated significant fish and/or wildlife habitat?
Policy 7 – Significant coastal fish and wildlife habitats, as idenƟfied on the coastal area map shall be
protected, preserved and, where pracƟcal, restored so as to maintain their viability as habitats.
This repair project does not require any tree cuƫng or any in-water work. ConstrucƟon will be
performed within the September 1st to October 31st window to not interfere with any potenƟal wildlife
habitat. Once completed, the repairs will once again allow the public to safely view these areas from a
distance. NYSDEC has sent a noƟce of no JurisdicƟon as it was determined that all work appears to be
above the mean high-water level. Any necessary measures requested by the State Agency regarding fish
and/or wildlife habitat in the area will be adequately incorporated into the project requirements.
QuesƟon C.2.h: State, county, or local park?
Policy 19 - protect, maintain, and increase the level and types of access to public water related recreaƟon
resources and faciliƟes so that these resources and faciliƟes may be fully uƟlized in accordance with
reasonably anƟcipated public recreaƟon needs and the protecƟon of historic and natural resources. In
providing such access, priority shall be given to public beaches, boaƟng faciliƟes, fishing areas and
waterfront parks.
This project will restore the pre-storm access to the County Park. These repairs will help to also preserve
the park for future years to come.
Policy 20 – Access to the publicly-owned foreshore and to lands immediately adjacent to the foreshore or
the water’s edge that are publicly-owned shall be provided, and it should be provided in a manner
compaƟble with adjoining uses. Such lands shall be retained in public ownership.
This project will restore the pre-storm access to the County Park. These repairs will help to also preserve
the park for future years to come.
QuesƟon C.2.i: Historic resource listed on the NaƟonal or State Register of Historic Places?
Policy 23 – Protect, enhance and restore structures, districts, areas or sites that are of significance in the
history, architecture, archaeology or culture of the State, its communiƟes, or the naƟon.
The main purpose of this project is to restore exisƟng structures that are an integral part of the
Bulkhead wall along Croton Point Park. Repair will replace damaged elements and reinstate the
structures to their original funcƟon and appearance. Access to other areas of the historic park will
once again be restored when the repairs are complete.
QuesƟon C.4: Will the proposed acƟvity occur within and/or affect an area covered by a State-approved
local waterfront revitalizaƟon program, or State approved regional coastal management program?
The main purpose of this project is to restore exisƟng structures that are an integral part of the
Bulkhead wall along Croton Point Park. Repair will replace damaged elements and reinstate the
structures to their original funcƟon and appearance.