Memo from WAC to VB re%3A NYS Project 2023-0878
memo
2 pages
Scanned/OCR — text may contain errors
Meeting: portal event 918 (no meeting page on file)
Agenda item: Review of the Village's Local Waterfront Revitalization Program policies by the Village Board to determine consistency related to the Westchester County Parks Department Croton Point Park Bulkhead Wall Coping Replacement Project (NYS Project 2023-0878).
Memo, 2 pages. Attached to agenda item: “Review of the Village's Local Waterfront Revitalization Program policies by the Village Board to determine consistency related to the Westchester County Parks Department Croton Point Park Bulkhead Wall Coping Replacement” (Text recovered by OCR — may contain errors.)
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
January 10th Resolution 3-2024 Bulkhead LWRP review
LWRP NYS Project 2023-0878
Westchester County Parks Department Croton Point Park...
Extracted text
Chairman
LEN SIMON
Members
STUART GREENBAUM
; STEVE KRISKY
Village of Croton-on-Hudson W. MURTAUGH
LEO WEIGMAN
- Attorney
Waterfront Advisory Committee LINDA WHITEHEAD
Stanley H. Kellerhouse Municipal Building Village Engineer
One Van Wyck Street DANIEL O'CONNOR, P.E.
Croton-on-Hudson, NY 10520-2501 Secretary
KAREN STAPLETON
TO: Mayor Brian Pugh and the Village Board of Trustees
FROM: Chairman Simon, Waterfront Advisory Committee: Referral from Village Board for a Local Waterfront Revitalization Program (LWRP)
Consistency review for Westchester County Parks Department Croton Point Park
Bulkhead Wall Coping Replacement Project (NYS Project 2023-0878).
DATE: January 4th, 2024
On January 3rd, 2024, the Waterfront Advisory Committee (WAC) reviewed for consistency with
the Village’s Local Waterfront Revitalization Program (LWRP) the referral listed above. Based
on the Committee’s review of the 44 LWRP policies, the Waterfront Advisory Committee made a
recommendation of consistency with the LWRP.
The committee reviewed the 44 LWRP policies and also the Federal Consistency Assessment
Form completed by Joseph DeSanctis of WSP USA, Inc. and were comfortable accepting their
assessment of the following relevant policies:
POLICY 7: Significant coastal fish and wildlife habitats will be protedted, preserved, and,
where practical, restored so as to maintain their viability as habitats.
The repair project does not require any tree cutting or any in-water work. Construction will be
performed within the September 1* to October 31° window to not interfere with any potential
wildlife habitat. Once completed, the repairs will once again allow the public to safely view
these areas from a distance. NYSDEC has sent a notice of no Jurisdiction as it was determined
that all work appears to be above the mean high-water level. Any necessary measures
requested by the State Agency regarding fish and/or wildlife habitat in the area will be
adequately incorporated into the project requirements.
POLICY 19: Protect, maintain, and increase the level and types of access to public water-
related recreation resources and facilites so that these resources and facilities may be
fully utilized in accordance with reasonably anticipated public recreation needs and the
protection of historic and natural resources. In providing such access, priority will be
given to public beaches, boating facilites, fishing areas and waterfront parks.
This project will restore the pre-storm (Hurracaine Ida) access to the County Park. These
reapirs will help to also preserve the park for future years to come.
POLICY 20: Access to the publicly-owned foreshore and to lands immediately adjacent to
the foreshore or the water’s edge that are publicly-owned shall be provided and it should
be provided in a manner compatible with adjoining uses. Such lands shall be retained in
public ownership.
Tel: 914-271-4783 www.crotononhudson-ny.gov Fax: 914-271-3790
This project will restore the pre-storm (Hurracaine Ida) access to the County Park. These
repairs will help also to preserve the park for future years to come.
POLICY 23: Protect, enhance and restore structures, districts, areas of sites that are of
significance in the history, architecture, archaeology or culture of the state, its
communities or the nation.
The main purpose of this project is to restore existing structures that are an integral part of the
Bulkhead wall along Croton Point Park. Repair will replace damaged elements and reinstate
the sturctures to their original function and appearance. Access to other areas of the historic
park will once again be restored when the repairs are complete.
It is for the reasons contained in this memorandum that the WAC issues its recommendation of
consistency.
Tel: 914-271-4783 www.crotononhudson-ny.gov Fax: 914-271-3790
Machine-extracted for search and reference — the original PDF is the authoritative version.