Resolution 90-2025 HMB Bridge Additional Scope
resolution
1 page
Meeting: portal event 1040 (no meeting page on file)
Agenda item: Proposed Resolutions — Consider authorizing the Village Manager to accept the proposal from Tectonic Engineering of Rocky Hill, Connecticut, for an additional scope of work related to the Half Moon Bay Bridge Replacement Project in the amount of $38,460.
Resolution, 1 page. Attached to agenda item: “Proposed Resolutions — Consider authorizing the Village Manager to accept the proposal from Tectonic Engineering of Rocky Hill, Connecticut, for an additional scope of work related to the Half Moon Bay Bridge Replacement”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Half Moon Bay Bridge Additional Scope
Extracted text
On motion of TRUSTEE -, seconded by TRUSTEE -, the following resolution was
adopted by the Board of Trustees of the Village of Croton-on-Hudson, New York
with the following vote:
Resolution #90-2025
WHEREAS, the Village of Croton-on-Hudson assumed the ownership of and
maintenance requirements for the Half Moon Bay Bridge over the Metro-North
Railroad tracks in 1996; and
WHEREAS, in order to address past safety issues and the proper maintenance of the
bridge, the Village is moving ahead with the rehabilitation and reconstruction of the
Half Moon Bay Bridge; and
WHEREAS, on April 23, 2023, in order to advance the Project, the Village Board
authorized the Village of Croton-on-Hudson to pay in the first instance 100% of the
federal and non-federal share of the cost of Preliminary Engineering work for the
Project or portions thereof; and
WHEREAS, on February 7, 2024, the Village Board authorized retaining Tectonic
Engineering of Rocky Hill, Connecticut, as its consulting and engineering design firm
for the project; and
WHEREAS, as Tectonic has continued to develop plans and specifications for the
project, additional requirements have been implemented by the New York State Dept.
of Transportation; and
WHEREAS, the Village has received a proposal from Tectonic Engineering related to
these additional requirements in the amount of $38,460,
NOW THEREFORE BE IT RESOLVED: that the Village Board hereby authorizes
the Village Manager to accept the proposal from Tectonic Engineering of Rocky Hill,
Connecticut, in the not-to-exceed amount of $38,460,
AND BE IT FURTHER RESOLVED: that funding for such proposal is available in
the following capital accounts: H5110.2106.15287
Dated: April 23, 2025