croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Sunday, August 16, 2026· Aug 16, 2026
Source-linkedCorrections welcomed
Documents

Resolution 90-2025 HMB Bridge Additional Scope

resolution 1 page
Meeting: portal event 1040 (no meeting page on file)
Agenda item: Proposed Resolutions — Consider authorizing the Village Manager to accept the proposal from Tectonic Engineering of Rocky Hill, Connecticut, for an additional scope of work related to the Half Moon Bay Bridge Replacement Project in the amount of $38,460.
Resolution, 1 page. Attached to agenda item: “Proposed Resolutions — Consider authorizing the Village Manager to accept the proposal from Tectonic Engineering of Rocky Hill, Connecticut, for an additional scope of work related to the Half Moon Bay Bridge Replacement”
Retrieved 2026-04-15 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: Half Moon Bay Bridge Additional Scope
On motion of TRUSTEE -, seconded by TRUSTEE -, the following resolution was adopted by the Board of Trustees of the Village of Croton-on-Hudson, New York with the following vote: Resolution #90-2025 WHEREAS, the Village of Croton-on-Hudson assumed the ownership of and maintenance requirements for the Half Moon Bay Bridge over the Metro-North Railroad tracks in 1996; and WHEREAS, in order to address past safety issues and the proper maintenance of the bridge, the Village is moving ahead with the rehabilitation and reconstruction of the Half Moon Bay Bridge; and WHEREAS, on April 23, 2023, in order to advance the Project, the Village Board authorized the Village of Croton-on-Hudson to pay in the first instance 100% of the federal and non-federal share of the cost of Preliminary Engineering work for the Project or portions thereof; and WHEREAS, on February 7, 2024, the Village Board authorized retaining Tectonic Engineering of Rocky Hill, Connecticut, as its consulting and engineering design firm for the project; and WHEREAS, as Tectonic has continued to develop plans and specifications for the project, additional requirements have been implemented by the New York State Dept. of Transportation; and WHEREAS, the Village has received a proposal from Tectonic Engineering related to these additional requirements in the amount of $38,460, NOW THEREFORE BE IT RESOLVED: that the Village Board hereby authorizes the Village Manager to accept the proposal from Tectonic Engineering of Rocky Hill, Connecticut, in the not-to-exceed amount of $38,460, AND BE IT FURTHER RESOLVED: that funding for such proposal is available in the following capital accounts: H5110.2106.15287 Dated: April 23, 2025

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.