Resolution 178-2025 Old Post Traffic Study
resolution
1 page
Meeting: portal event 1066 (no meeting page on file)
Agenda item: Proposed Resolutions — Consider authorizing the Village Manager to accept the proposal from ARKF Inc. in the not-to-exceed amount of $46,500 to conduct a traffic engineering study on Old Post Road North between Hunter Place and Michaels Lane.
Resolution, 1 page. Attached to agenda item: “Proposed Resolutions — Consider authorizing the Village Manager to accept the proposal from ARKF Inc. in the not-to-exceed amount of $46,500 to conduct a traffic engineering study on Old Post Road North between Hunter Pl”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Old Post Road Study - AKRF proposal
Extracted text
On motion of TRUSTEE ---, seconded by TRUSTEE ---, the following resolution was
adopted by the Board of Trustees of the Village of Croton- on- Hudson, New York with
a - vote.
Resolution #178-2025
WHEREAS, the Village has been seeking to identify ways to improve traffic safety along
Old Post Road North between Hunter Place and Michaels Lane; and
WHERAS, AKRF Inc. has provided a proposal to conduct a traffic engineering study in
this area; and
WHEREAS, the Village Board funded the traffic study in the 2025-2026 Capital Budget,
NOW THEREFORE BE IT RESOLVED: that the Board of Trustees of the Village of
Croton-on-Hudson hereby authorizes the Village Manager to accept the proposal from
AKRF Inc. to conduct a traffic study along Old Post Road North in the not-to-exceed
amount of $46,500.
Dated: July 9, 2025
Machine-extracted for search and reference — the original PDF is the authoritative version.