QBR Village LWRP Letter
environmental
1 page
Meeting: portal event 1077 (no meeting page on file)
Agenda item: OLD BUSINESS — Hugh Greechan, Jr.. P.E, Commissioner of Westchester County Department of Public Works & Transportation, has applied to the Water Control Commission of the Village of Croton-on-Hudson for a Wetlands Activity Permit for the proposed complete replacement of the existing Quaker Bridge over the Croton River.
Environmental review, 1 page. Attached to agenda item: “OLD BUSINESS — Hugh Greechan, Jr.. P.E, Commissioner of Westchester County Department of Public Works & Transportation, has applied to the Water Control Commission of the Village of Croton-on-Hudson for a Wetlands Activi”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
PB Quaker Bridge Tree Removal Resolution
QBR Wetlands Activity Permit App and Supporting Docs 2025
QBR-Coastal assessment 7.25.2025
QBRB Chapter 230 Finding Statement
QBRB Wetlands 227 Finding Statement
QBR CAF 7.10.2025
Quaker Bridge Replacement DRAFT Resolution
Extracted text
Civil, Environmental and Transportation Design Services
OSPA Engineering Services, PC
800 Route 146, Bldg. 200, Suite 280
Clifton Park, NY 12065
Phone:
518.636.9956
E-Mail ospa@ospaengineering.com
Web site WWW.OSPAENGINEERING.COM
July 9, 2025
Bryan Healy
Village Manager
Village of Croton-on-Hudson
1 Van Wyck Street
Croton-on-Hudson, NY 10520
RE:
QUAKER BRIDGE ROAD BRIDGE REPLACEMENT
TOWN OF CORTLANDT AND VILLAGE OF CROTON-ON-HUDSON, WESTCHESTER COUNTY,
NY
Dear Sir:
OSPA Engineering Services, PC has been contracted to complete the preliminary environmental
investigations and permitting for the proposed QUAKER BRIDGE ROAD BRIDGE REPLACEMENT. This
project is slated to require state and federal permitting.
The project is located in the Town of Cortlandt and the Village of Croton-on-Hudson, Westchester
County. The project contract administrator is Westchester County. A regional project location map is
enclosed for your reference.
Project Coordinates NAD 27:
N 41°12'43.02"
W 73°53'8.71"
The goal of the overall project is to provide a safer crossing for vehicles and pedestrians. The bridge
will be updated to current design standards. The project proposes the construction of a new bridge,
in addition to roadway approach improvements.
At this time we request that your office provide us with any permits/consistency forms that will be
required for the proposed project or a coastal consistency determination, since the project will be state
and federally permitted and occurs within the village’s LWRP. Coordination/Permitting with the New
York State Department of State, New York State Department of Environmental Conservation
(NYSDEC), New York State Historic Preservation Officer (SHPO), US Fish and Wildlife Service (USFWS),
New York Natural Heritage Program (NYNHP) and United States Army Corps of Engineers (USACE) will
occur as a part of this project.
If you have any questions or require additional information regarding this request, please do not
hesitate to call me at (518) 636-9956.
Melanie Osterhout, P.E.
President
Enclosures
c: file
---
Editorial note (croton.news): name spelling(s) in this copy were corrected against official records: ‘Bryan Healy’ corrected to ‘Bryan Healy’. The original document, as issued, is available from the Village; see croton.news/editorial-policy for our corrections policy.
Machine-extracted for search and reference — the original PDF is the authoritative version.