Quaker Bridge Replacement DRAFT Resolution
resolution
3 pages
Meeting: portal event 1077 (no meeting page on file)
Agenda item: OLD BUSINESS — Hugh Greechan, Jr.. P.E, Commissioner of Westchester County Department of Public Works & Transportation, has applied to the Water Control Commission of the Village of Croton-on-Hudson for a Wetlands Activity Permit for the proposed complete replacement of the existing Quaker Bridge over the Croton River.
Resolution, 3 pages. Attached to agenda item: “OLD BUSINESS — Hugh Greechan, Jr.. P.E, Commissioner of Westchester County Department of Public Works & Transportation, has applied to the Water Control Commission of the Village of Croton-on-Hudson for a Wetlands Activi”
Retrieved 2026-04-15 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
PB Quaker Bridge Tree Removal Resolution
QBR Wetlands Activity Permit App and Supporting Docs 2025
QBR-Coastal assessment 7.25.2025
QBRB Chapter 230 Finding Statement
QBRB Wetlands 227 Finding Statement
QBR CAF 7.10.2025
QBR Village LWRP Letter
Extracted text
WHEREAS, Hugh Geechan, Jr., P.E., Commissioner of Westchester County Department
of Public Works & Transportation has submitted an application to the Water Control
Commission (WCC) of the Village of Croton-on-Hudson, for approval of a Wetland Permit for
site activities within the 150-foot wetland buffer, from the Croton River, consisting of the
complete replacement of the existing Quaker Bridge.
WHEREAS, public meetings were held by the Water Control Commission after due notice on
07/31/25, 8/25/25, at which meetings public comments were heard, and
WHEREAS, the following documents have been submitted by or on behalf of the Applicant:
• Wetlands Permit Application #20250418 submitted by Westchester County Department
of Public Works.
• Letter from Hugh Geechan, Jr., P.E., Commissioner of Westchester County Department
of Public Works & Transportation dated July 9, 2025, Wetland Permit Application.
• Letter from Melanie Osterhout, P.E. President of OSPA Engineering Services dated July
9, 2025.
• Memorandum from Melanie Osterhout, P.E. President of OSPA Engineering Services
dated July 25, 2025 Re the Village of Croton-on-Hudson Wetlands Findings Statement
per Village Code 227.
• Memorandum from Melanie Osterhout, P.E. President of OSPA Engineering Services
dated July 25, 2025 regarding the Village of Croton-on-Hudson Indian Brook-Croton
Gorge Inter-Municipal Watershed Protection Overlay District (WPOD) Finding
Statement, per Village Code 230-20.14 and 230-20.15.
• Village of Croton-on-Hudson Coastal Assessment Form date July 25, 2025 with
attachment of Memorandum from Melanie Osterhout, P.E. President of OSPA
Engineering Services to NYSDOS regarding NYDOS Policy Regulations dated July 25,
2025.
• Letter from Melanie Osterhout, P.E. President of OSPA Engineering Services dated July
9, 2025.
• Letter from Melanie Osterhout, P.E. President of OSPA Engineering Services dated July
1, 2025 to United States Army Corps of Engineers and NYSDEC Region 3 Permits.
• Copy of Department of Environmental Conservation Joint Application Form with
Attachment A: Project Database Mapping, Wetland Delineation Report and FEAF.
• Wetland and Ordinary High Water Delineation Report dated November 2024 and
prepared for Westchester County Department of Public Works & Transportation.
• Full Environmental Assessment Form prepared by David S. Kvinge, Assistant
Commissioner, Westchester County Department of Planning and dated June 26, 2025.
• Letter from Olivia Brazee of Historic Site Restoration Coordinator to Mr. Matt Hunt of
Creighton Manning dated May 8, 2017.
• Letter from Matt Hunt, P.E. to Olivia Brazee, Historic Site Restoration Coordinator for
NYS Parks, Recreation & Historic Preservation and dated May 25, 2017.
• Draft Scope Summary Memorandum from Charles Tutunjian, P.E. Creighton Manning
Engineering, LLP to Phil Abenavoli, P.E. of Westchester County Department of Public
Works and Transportation dated November 17, 2017.
• HAER Level II Documentation prepared by Walter Richard Wheeler of Harten
Archeological Associates, INC and dated October 2017.
• Scope Summary Memorandum from Matt Hunt, P.E. of Creighton Manning Engineering,
LLP to Olivia Brazee, Historic Site Restoration Coordinator for NYS Parks, Recreation
& Historic Preservation.
• Construction Plan Sheets: ST-01, IND-01, LEG-01, LEG-02, GNN-01, GNN-002, GNP-01,
TYP-01, PRO-01, PRO-02, GRO-01, LAP-01, LAD-01, LAN-01, ST-01, ST-02, ST-12, ST-13
prepared by Creighton Manning Engineering and dated June 24, 2025.
WHEREAS, the Water Control Commission has also received correspondence from members of
the public and heard comment from the public and considered same as part of its decision
making on this matter, and
WHEREAS, Westchester County, SEQR Lead Agency, has determined the action is an Unlisted
Action under the State Environmental Quality Review Act (SEQRA) Section 617.5(c)(2), and
determined Negative Declaration therefore no further review under SEQRA, and
WHERAS, on August 19, 2025 based on Planning Board review, the Planning Board made the
determination this project is consistent with the Local Waterfront Revitalization Program.
WHERAS, the Planning Board on August 19, 2025 granted approval for the removal of 56 trees
to facilitate the Quaker Bridge Replacement Project
WHEREAS, under Section 227-7(F) of the Village Code the Water Control Commission is the
approving authority for the issuance of the Wetland Permit, and
WHEREAS, the Water Control Commission recognizes that the overall work to be completed
includes additional work not within the wetland buffer and that all the proposed work will
require a Tree Removal Permit of which is under the jurisdiction of the Village Planning Board
and will be issued by the Village Engineer, and
WHEREAS, the Water Control Commission considered items 1-9 in section 227-8A of Chapter
227, Wetlands of the Village Code in making its determination to grant this permit with
conditions, and
NOW, THEREFORE, BE IT RESOLVED, the Water Control Commission hereby issues a
Wetland Permit for the removal and replacement of the Quaker Bridge over the Croton River, in
the 150 foot wetland buffer zone, as shown on the plans submitted set forth above, and subject to
the conditions specified below which are established pursuant to Sections 227-8(F) and 227-8(G)
of the Village Code.
1. The foregoing recitals are incorporated herein as if set forth at length.
2. That, all regulated activity is limited to the 150-foot wetland buffer zone and small
section of the Croton River as shown on the plans.
3. That the proposed work in the wetland buffer area and watercourse be performed in
accordance with the above-referenced documents, this Wetland Permit and any other
permits and approvals from other agencies.
4. That the work conducted under the Wetland Permit shall be open to inspection during
daylight hours, including weekends and holidays, by the approving authority or its
designated representative or the Village Engineer.
5. That, the applicant shall notify the Village Engineer in writing of the date on which the
work is to begin at least five days in advance of such commencement date.
6. That, the Wetland Permit shall be prominently displayed at the project site during the
undertaking of the activities authorized by the permit.
7. That, all Best Management Practices (BMPs) for erosion and sediment control included
in the project documents be implemented including any additional BMPs requested by
the Village Engineer or his designee.
8. That, the Storm Water Pollution Prevention Plan be submitted to the Village Engineer
prior to the commencement of any work.
9. That, the Village Engineer be copied on any reports about the proposed project for the
duration of the project including but not limited to, storm water pollution prevention
plan inspection reports.
10. That, any damage to Quaker Bridge Road and Niles Road caused by vehicle/truck traffic
associated with the construction of the replacement bridge work and the work associated
with the replacement of the bridge be replaced to the satisfaction of the Superintendent
of DPW.
11. Within 30 days of notification of the completion of the work the Village Engineer shall
inspect the work for compliance with all conditions of the permit.
12. When work authorized under a permit is deemed not acceptable, the Village Engineer
shall so notify the applicant. The notification of noncompliance shall include a list of all
conditions in violation of the terms of the permit and shall specify a time limit for the
correction of all items so listed.
13. That, the Wetland Permit expiration date shall be 12/31/26 or upon earlier completion of
the work specified herein.
________ made a motion and _____ seconded the motion to approve the application as
submitted with the conditions specified herein:
Vote: __________
Dated: August 25, 2025