croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Monday, July 27, 2026· Jul 27, 2026
Source-linkedCorrections welcomed
DocumentsBoard Of Trustees, 2026-06-17

Resolution 151-2026 Brook Street Design proposal

resolution 1 page
From the meeting: Board Of Trustees — 2026-06-17 · our coverage →
Agenda item: Proposed Resolutions — Consider authorizing the Village Manager to accept the proposal from D&B Engineers for design services related to the Brook Street Drainage Improvements in the amount of $90,500.
Resolution, 1 page. Attached to agenda item: “Proposed Resolutions — Consider authorizing the Village Manager to accept the proposal from D&B Engineers for design services related to the Brook Street Drainage Improvements in the amount of $90,500.”
Retrieved 2026-07-26 from the village's meeting portal. View the original PDF ↗
Resolution #151-2026, dated June 17, 2026, authorizes the Village Manager to accept a $90,500 proposal from D&B Engineers for design services for the Brook Street Drainage Project. The resolution notes flooding along Brook Street has existed for many years, that a 2023 drainage study identified a preferred alternative to improve drainage along Brook Street and Terrace Place, and that the Village has received $701,000 in funding from Westchester County for the project.
AI summary — generated from the document text; check the original before relying on details
Also attached to this agenda item: RJC102822BH-Ltr-GEO-REV1
adopted by the Board of Trustees of the Village of Croton- on- Hudson, New York Resolution #151-2026 WHEREAS, flooding issues along Brook Street have existed for many years in the Village; and WHEREAS, in 2023, the Village Board of Trustees adopted Resolution 142-2023 to accept a proposal from D&B Engineers to conduct an updated drainage study along the Brook Street drainage basin; and WHEREAS, the study has been completed and a preferred alternate has been selected to improve drainage along Brook Street and Terrace Place; and WHEREAS, the Village has received funding for this project from Westchester County in the amount of $701,000; and WHEREAS, D&B Engineers has now provided a proposal to move forward with the design services for this project in the amount of $90,500; and WHEREAS, Frank Balbi, Superintendent of Public Works, has reviewed the proposal and recommended moving forward with the scope of work, NOW THEREFORE BE IT RESOLVED: that the Village Board hereby authorizes the Village Manager to accept the proposal from D&B Engineers in the amount of $90,500 for design services related to the Brook Street Drainage Project. Dated: June 17, 2026

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.