GisolfiReport-Part2
report
37 pages
Meeting: portal event 700 (no meeting page on file)
Agenda item: Work Session — Discussion of Feasibility Study of Municipal Building Renovations
Report / study, 37 pages. Attached to agenda item: “Work Session — Discussion of Feasibility Study of Municipal Building Renovations”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
GisolfiReport-Appendix
GisolfiReport-Part1
NeedsAssessmentandFacilityMasterPlan-2008
Extracted text
Conceptual Budget Estimates
Geothermal
New
Hazmat
Contingency
Soft Costs
Temp. Prov.
Total
Subtotal
& Plumbing
Elevator
Allowance
Subtotal
15%
Construction
18%
& FFE
Budget
Cost #1
Note 2
Note 5
Note 9
Cost #2
Note 6
Budget
Note 7
Note 8
Note 10
OPTION #1
(Note 4)
Basement
-
-
3,000
180,000
76,500
19,250
153,000
First Floor
1,545
61,800
57,000
-
-
-
-
6,910
1,382,000
Second Floor
7,855
314,200
30,900
-
-
-
-
58,000
Attic
-
-
-
-
-
-
-
-
-
-
Cost:
$376,000
$267,900
$76,500
$19,250
$1,593,000
$2,332,650
$1,320,000
--
$75,000 $3,727,650
$559,148
$4,286,798
$771,624
$100,000
$5,158,421
OPTION #2
Basement
-
-
3,285
197,100
1,445
144,500
19,250
153,000
First Floor
-
-
1,600
96,000
88,500
-
-
6,910
1,382,000
Second Floor
7,845
313,800
30,900
-
-
-
-
86,000
Attic
3,800
152,000
-
-
-
-
-
-
166,000
Cost:
$465,800
$324,000
$233,000
$19,250
$1,787,000
$2,829,050
$1,320,000
$135,000
$75,000 $4,359,050
$653,858
$5,012,908
$902,323
$100,000
$6,015,231
OPTION #3
Basement
-
-
3,285
197,100
1,445
144,500
19,250
153,000
First Floor
-
-
57,300
1,430
143,000
-
-
6,990
1,398,000
Second Floor
4,730
189,200
30,900
3,235
323,500
-
-
74,000
Attic
3,800
152,000
-
-
-
-
-
-
166,000
Cost:
$341,200
$285,300
$611,000
$19,250
$1,791,000
$3,047,750
$1,320,000
$180,000
$75,000 $4,622,750
$693,413
$5,316,163
$956,909
$100,000
$6,373,072
1. The areas are based on the information shown in the Conceptual Construction Budget Diagrams.
2. The Geothermal (HVAC Scheme #2) and Plumbing Budget is based on the following:
HVAC Scheme #2:
(Note 3)
Fire Sprinkler System:
Domestic Water Service
Domestic Hot Water System
(Note 3)
3. If HVAC Scheme #1 (High Efficiency Air Cooled Split Systems with a High Efficiency Gas Boiler) is selected,
deduct $300,000.00 from the Budget. See Section 5.3b for an explanation of potential cost savings based on a life cycle cost analysis.
4. The Budget for Option #1 does not include the cost for a new elevator or for creating storage in the Attic
(Add $480,000 to the Construction Budget if this is required).
5. For Option #2, the elevator cost includes extending the elevator service to the Attic within the footprint of the current elevator shaft.
For Option #3, the elevator cost includes a two sided elevator and a new elevator shaft.
6. The Total Contingency includes a 10% Design Contingency (for scope) and a 5% Construction Contingency
(for potential Discovered Conditions during construction).
7. The Soft Costs include the Architect/Engineer's Fee, Construction Manager/Owner's Representative Fee,
Independent Testing & Inspections, Fundamental Commissioning of the HVAC system, AE Reimbursable Costs and other Administrative Costs.
8. This budget is an allowance for potential temporary office provisions and relocation expenses during construction and for furniture and equipment.
9. This budget is an allowance for the potential removal of hazardous materials.
10. The Total Budget does not include the $350,000 Budget for the proposed parking lot improvements described in Section 5.7b.
L
(J+K)
O
(L+M+N)
Renovation
Cost/SF = $40
Renovation
Cost/SF = $60
Cost/SF = $200
Renovation
Cost/SF = $100
Renovation
Cost/SF = $175
K
M
N
A
B
C
D
E
F
(A+B+C+D+E)
J
(F+G+H+I)
Intense
Reconstruction
1,000,000
$
G
H
I
Area (Note1) Cost
Area (Note1) Cost
25,000
$
20,000
$
1,320,000
$
Light
Moderate
Major
275,000
$
Area (Note1) Cost
Area (Note1) Cost
Area (Note1) Cost
Machine-extracted for search and reference — the original PDF is the authoritative version.