Wolf-Cook- water replacement-engineering design
resolution
1 page
Meeting: portal event 702 (no meeting page on file)
Agenda item: PROPOSED RESOLUTIONS: — Resolution-Wolf Road-Cook Lane
Resolution, 1 page. Attached to agenda item: “PROPOSED RESOLUTIONS: — Resolution-Wolf Road-Cook Lane”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Wolf Road Proposal final-Chazen
revised budget-Chazen
Extracted text
On motion of TRUSTEE____________, seconded by TRUSTEE _______, the
following resolution was adopted by the Board of Trustees of the Village of Croton-on-
Hudson, New York:
WHEREAS, the Village has begun several steps to prepare for the replacement of water
mains and other water infrastructure improvements within the Village; and
WHEREAS the Wolf Road-Cook Lane area of the Village has been designated as one of
the priority areas for water main improvements; and
WHEREAS, the Village sent out request for proposals for engineering design services for
the Wolf Road-Cook Lane water main replacement and extension project and received 9
proposals; and
WHEREAS, Village Staff has reviewed all the proposals in detail and are in agreement
that the engineering design services should be awarded to the Chazen Companies of
Poughkeepsie, NY in the amount of $22,000 (which includes an estimate of $1,400 for
reimbursable expenses); and
WHEREAS, the original proposal was for $19,800 and the Village requested that Chazen
revise their proposal to reflect the option of performing the work in phases; and
WHEREAS, this amount includes engineering design, Westchester County Health
Department approval, New York State Department of Transportation approval,
preparation of final bid plans and specifications, and bid assistance; and
WHEREAS, this amount does not include the cost for any geotechnical work that may be
required as well as the cost for any construction assistance that may be required
NOW, THEREFORE BE IT RESOLVED: that the Village Manager is hereby authorized
to enter into a contract with the Chazen Companies of Poughkeepsie, NY in the amount
of $22,000 for the Wolf Road-Cook Lane Water Main Replacement and Extension
Project,
AND BE IT FURTHER RESOLVED: that this amount should be charged to capital
account # H8340.2106.09178.
Dated: February 21, 2012
Machine-extracted for search and reference — the original PDF is the authoritative version.