Wolf Road Proposal final-Chazen
resolution
50 pages
Meeting: portal event 702 (no meeting page on file)
Agenda item: PROPOSED RESOLUTIONS: — Resolution-Wolf Road-Cook Lane
Resolution, 50 pages. Attached to agenda item: “PROPOSED RESOLUTIONS: — Resolution-Wolf Road-Cook Lane”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Wolf-Cook- water replacement-engineering design
revised budget-Chazen
Extracted text
Mr. Bianchi has over 15 years of engineering experience with Chazen in addition to two years with an
Albany area survey firm. He has overall responsibility of the municipal engineering service line for Chazen.
His responsibilities include coordination and managing medium to large scale state/municipal projects. His
general responsibilities include project the oversight of development and oversight, planning, design,
construction documentation, construction administration and quality control.
SENIOR DIRECTOR, MUNICIPAL ENGINEERING
PROJECT EXPERIENCE
Water Supply, Distribution & Treatment
̇ Village of Canton Water Supply Master Plan , WTP, Storage and Distribution Upgrades
̇ Coxsackie Corrections Facility Water Supply Improvements
̇ Camp Gabriels Corrections Facility Water Treatment Plant Improvements
̇ Eastern Corrections Facility Water System New SCADA System
̇ Green Haven Correctional Facility Water Plant Upgrades
̇ Woodbourne Correctional Facility Water Main Replacement
̇ Wallkill Correctional Facility Well Investigation
̇ Wallkill Correctional Facility New Water Plant
̇ Gore Mountain Ski Area Water Supply Improvements
̇ Town of Stillwater Water Dist 3
̇ Town of Stillwater Water Dist 4
̇ Town of Stillwater Water Master Planning
̇ Town of East Greenbush Water Distribution EPA Compliance
̇ SMSI Regional Water Study, Stillwater & Mechanicville, NY
̇ Village of Goshen Harness Estates Well Field And Treatment System
̇ New York International Plaza Campus Wide Water Distribution System Master Planning
̇ Town of Rotterdam Water District No. 5 Extension
̇ SUNY Potsdam Fire Protection Analysis, Potsdam, NY
̇ Village of Stillwater Water Plant Evaluation
Wastewater Disposal & Conveyance
̇ Camp Cass Water/Wastewater Investigations and Improvements
̇ Willard Drug Treatment Center SSES I/I Study
̇ Butler Correctional Facility WWTP Decommissioning
̇ Woodbourne Correctional Facility SSES/I&I Study
̇ SUNY Delhi Golf Course Irrigation System & Wastewater Reclamation Project
̇ New York International Plaza Campus Wide Sanitary Sewer System Master Planning
̇ Village of Stillwater North Hudson Avenue Sanitary Sewer Improvements
̇ Town of Stillwater Riverside 2 / Gurba Pump Station Upgrades And Sanitary Sewer Improvements
̇ Village of Potsdam Route 56 Water And Sewer Improvements
̇ Town of Rotterdam, City Of Schenectady- Inter-Municipal Sewer System
̇ Village of Stillwater Sewer District Expansion
̇ Village of Menands Sewer System I/I Remediation
̇ Town of Warrensburg WWTP Evaluation
̇ Town of Warrensburg UV Disinfection System
̇ Town of Warrensburg Sewer Districts
̇ Wallkill Correctional Facility New Sanitary Pump Station & Force main
̇ Kingston Armory Pump Station Evaluation and Upgrades
̇ Tow of East Greenbush Vermont Avenue Sewer Extension
̇ Gore Mountain Ski Area, WWTP Upgrades
Joel Bianchi, PE
EDUCATION
•
Master of
Engineering, Civil
Engineer,
Clarkson
University, 1996
•
BS, Civil
Engineering,
Clarkson
University, 1995
REGISTRATION
•
Licensed
Professional
Engineer
NY 078397
AFFILIATIONS
•
New York Water
Environmental
Association
•
Water
Environmental
Federation
•
American Water
Works Association
Drainage & Stormwater Management
̇ Otisville Corrections Facility Drainage Improvements
̇ Arthur Kill Correctional Facility New Firing Range SWPPP Assessments
̇ Jones Beach State Park Culvert Investigation
̇ Town of Stillwater Gurba Drainage Improvements
̇ Town of Stillwater Riverside Drainage Improvements
̇ Town of Niskayuna Town Wide drainage Improvement projects
̇ Town of Rotterdam Sunrise Creek Drainage Improvements
̇ Town of Patterson Stormwater Management Planning
̇ Village of Lake George Drainage Improvements
̇ Town Of Queensbury Drainage Improvements
̇ Lloyd NYSDOT New Facility SWPPP Assessments
̇ Creedmore Psychiatric Center Stormwater Pollution Prevention Plan
̇ Mid Orange Corrections Facility Drainage Improvements
̇ Eastern Correctional Facility Electrical Upgrades SWPPP Preparation
̇ Bedford Hills Correctional Facility Electrical Upgrades SWPPP Preparation
̇ Bedford Hills Correctional Facility New Firing Range SWPPP Preparation & Assessments
̇ Camp Smith Readiness Center SWPPP Assessments
Transportation Projects
̇ Town of Niskayuna Banker Road Realignment
̇ City of Plattsburgh, Clinton Street Streetscape
̇ Town of Stillwater, Historic Multi-use Trail, PIN ME2267.30A
̇ Town of East Greenbush Gilligan Road Realignment
̇ Town of Malta Hempstead Place Sidewalk Extension, PIN 1MB006.00A
̇ Town of Stillwater Historic Stillwater Multi-Use Trail, PIN ME2267.30A
̇ Town of Malta Community Center Sidewalk Extension, PIN 1457.67, TIP#SA232
Municipal Planning Boards
̇ Town of Niskayuna, New York
̇ Town of Rotterdam, New York
̇ Town of Glenville, New York
̇ Town of Bethlehem, New York
̇ Town of Malta, New York
̇ Town of East Greenbush, New York
Joel Bianchi, PE
PROJECT EXPERIENCE
With 10 years experience, Mr. Fanning is responsible for civil and environmental engineering projects. His work
experience is in design and construction of wastewater collection, pumping and treatment systems, design & construction
of water treatment systems, conducting hydrologic/hydraulic studies, drainage studies and designs, bridge hydraulic
studies, scour analysis and design, potable water distributions system analysis and design. He participates in preparing
studies, reports, and designs for water and wastewater systems, and hydraulics and drainage improvements, as well as
prepares preliminary and contract plans, quantities, specifications, cost estimates, and design support during construction.
Also provides liaison and coordination of technical review of municipal planning board permit submittals. His software
experience helps to solve design-engineering problems and he is familiar in the use of USACOE HEC, USDA SCS, and
EPA software. He also has experience in design applications and permitting with regards to state and federal regulations.
SENIOR PROJECT ENGINEER
PROJECT EXPERIENCE
Water/Wastewater Project Experience
̇ Water Supply Improvements, Highland Central School District, Ulster Co., NY
̇ Corrosion Control Program, Village Of Croton-On-Hudson, Westchester County, NY
̇ Wastewater Permit Revision, Village Of Millbrook, Dutchess County, NY
̇ New Titusville Wwtp, Town Of Lagrange, Dutchess County, ny
̇ Evaluation of Water & Sewer System Demands, Suny New Paltz , Ulster Co., NY
̇ Collection System Revisions, Twin Brook Homeowners Association, Putnam County, NY
̇ Omega Institute Sewer Upgrades, Town Of Clinton, Dutchess County
̇ Anderson School WWTP Improvements, Town Of Hyde Park, Dutchess County
̇ Glenclyffe WWTP Replacement, Open Space Institute, Town Of Philipstown, Putnam County
̇ Corrosion Control Program, Village Of Millbrook, Dutchess county
̇ Southeast Connecticut Regional Water Supply Interconnection, Mohegan Tribal Utility Authority
̇ Water Distribution System Extension, Westport, CT
̇ Pier 2 Water Distribution System, Naval Station Newport, Newport, RI
̇ Regency at Bloomfield Water Distribution System, Toll Brothers, Inc., bloomfield, CT
̇ Kleen Energy Power Plant Cooling Water Supply, Middletown, CT
̇ Whitneyville Pump Station Evaluation – Town Of Hamden, CT
Road Rehabilitation Project Experience
̇ Balf Property, Tilcon Corp. Highway Improvements, Town Of Andover, CT
̇ Intersection Improvements, City Of Waterbury, CT
̇ Newington Pedestrian Study – Town Of Newington, CT
̇ Blaze Property Roadway Modificaitons And Sight Distance Improvements– Town Of Easton, CT
̇ Berry Farm Roadway Improvements – Town Of Southbury, CT
Drainage Project Experience
̇ Meriden Library Stormwater Improvements, City Of Meriden, CT
̇ Chestnut Hill Road And Booth Hill Road Culvert Replacement – Town Of Trumbull, CT
̇ Lake Whitney Water Quality Improvements, Town Of Hamden, CT
̇ Hydrologic Hydraulic Study – City Of Meriden, CT
̇ Todd Street Realignment, Town Of Hamden, CT
̇ State Route 25, Towns Of Trumbull & Monroe, CT
̇ Local Road Improvements, City Of New London, CT
̇ Reconstruction of U.S. Route 7 – town of wilton, CT
̇ King Street Rehabilitation – Town Of Stratford, CT
̇ Reconstruction Of East Road And Union Street At Route 69 – Town Of Bristol, CT
̇ Shelton Intermediate School – Town Of Shelton, CT
̇ Compo Beach Drainage Design – Town Of Westport, CT
̇ Hartford Road Improvements – Town Of Manchester, CT
̇ Local Road Improvements – Town Of Shelton, CT
Michael E. Fanning, PE
EDUCATION
•
BS, Civil and
Environmental
Engineering,
University of
Rhode Island,
•
BS, Industrial
Technology
Rhode Island
College, 1992
REGISTRATION
•
Professional
Engineer
CT 023459
AFFILIATIONS
•
Water
Environmental
Federation
•
American Water
Works Association
Mr. Doty has over 8 years of experience developing private, municipal and state projects from the schematic design phase
through construction, developing technical studies, analytical models, and regulatory applications as well as completing
code studies and field investigations. Mr. Doty’s experience includes serving as planning board engineer for municipalities,
project management, guiding clients through project process, evaluation and design of stormwater management systems,
water distribution systems, sewer conveyance systems, subsurface wastewater disposal systems, roadway networks, fire
protection systems, and overall site designs. Mr. Doty is also experienced in providing construction administration and
construction inspection.
SENIOR PROJECT ENGINEER
PROJECT EXPERIENCE
Municipal Planning Boards
̇ Town of Stillwater
̇ Town of Queensbury
Drainage & Stormwater Management
̇ Oneida County Facility Utility and Site Improvements
̇ Village of Stillwater Route 4 Sidewalk/Stormwater Improvements
Municipal Water Supply Distribution & Treatment
̇ Town of Stillwater – Elmore Robinson Road Water Transmission Main Design and Permitting
̇ Town of Stillwater – George Thompson Road, McDermott Road, County Route 75 Water
Transmission Main – Design and Permitting
̇ Town of Stillwater – Water System Audit
̇ Eastern Correctional Facility, Napanoch, NY – Water Treatment Improvements and SCADA System
Design
̇ Village of Mount Kisco – Water System Report for GIGP Funding
̇ Village of South Glens Falls – Water Treatment Plant Upgrades
Wastewater Disposal & Conveyance
̇ Lowe’s Home Improvement Center, Lloyd, NY – Subsurface Disposal System Design
̇ Wallkill Correctional Facility, Wallkill, NY – Force Main Improvements Design
̇ Baptist Health Mixed Use Development – Sewer Design
̇ Latvian Lutheran Church Camp, Hunter, NY – Sewer System Evaluation
Transportation
̇ Cold Springs Road Corridor Highway Rehabilitation Project, Stillwater, NY
̇ Ridge Street Bus Shelter Relocation Project, Glens Falls, NY
̇ U.S. Route 9 & Spring Road Intersection Improvements, Poughkeepsie, NY
Land Development Projects
̇ Woodland Pond Senior Living Community, New Paltz, NY - Design
̇ Hudson Pointe/Esopus Lake Housing Project, Esopus, NY - Design
̇ Hudson International Business Center, Montgomery, NY – Design
̇ Lochlea Subdivision, Lake George, NY
̇ Silo Ridge Resort Community, Amenia, NY
̇ Mount Pleasant Subdivision, Mount Pleasant, NY
̇ Summer Cove Subdivision, Lake George, NY
̇ Seasons At White Lake, Bethel, NY
̇ Turnberry Condominiums, Queensbury, NY
Sean M. Doty, PE, LEED AP®
EDUCATION
•
BS, Civil
Engineering with a
Professional
Concentration in
Environmental
Engineering,
Clarkson
University, 2003
ACCREDITATIONS
•
Licensed
Professional
Engineer in the
State of New York
License Number
•
U.S. Green
Building Council
LEED Accredited
Professional
AFFILIATIONS
•
Member of the
American Society
of Civil Engineers
– Mohawk Hudson
Chapter
PRESENTATIONS
•
“Sustainable
Stormwater
Design in Your
Community” -
2008 North
Country
Stormwater
Tradeshow &
Conference; and
2009 Capital
District’s
Engineer’s Week
Gary Aber
DIRECTOR OF CONSTRUCTION SERVICES & UTILITY DESIGN
Mr. Aber manages the corporate Construction Inspection group, and has been involved in the construction field for the
past 30 years. His is responsible for all telephone, gas, fiber, electrical, and CATV conduit system design and installation.
He has extensive experience providing review and coordination of these systems from preliminary design through
construction of bridge hanger/conduit installations, gas line systems, fiber-optic conduit systems, manhole routing,
Remote Terminal (RT) design and site layout, conduit rehabilitation, CEV turnkey operations, ROW survey and easement
preparation, and submarine telecommunications cable crossings.
PROJECT EXPERIENCE
INTER-OFFICE FIBER OPTIC (IOF) PROJECTS, BELL ATLANTIC, VERIZON, DUTCHESS,
ORANGE, ULSTER, AND SULLIVAN COUNTIES, NY
Project Manager/ Designer for numerous IOF projects, including aerial survey, field investigation, design
mapping, permit coordination, inspection oversight, as-builts, projects requiring multiple agency approvals,
blasting coordination, fiber optic conduit, and manhole routing. These were segmented designs throughout
the Verizon Mid-Hudson territory between Central Office locations to provide fiber connectivity system
capabilities. Bid document support services along with pay requisition certifications were provided.
VERIZON HUDSON DISTRICT INSPECTION OVERSIGHT
Project Coordinator for Contract Inspection force varying from 3 to 15 personnel for 5 ½ yrs. Duties
included inspection, oversight, staff scheduling, drafting, recon for design, minor design, pay requisition
approval, public relations with Municipalities, land owners, and NYSDOT. Mr. Aber provided oversight
during Corporate Fiber Conduit installation to three engineering consultant inspection firms. Before closing
the term, he trained company personnel to assume inspection responsibilities throughout the territory.
VASSAR COLLEGE FIBER OPTIC INFRASTRUCTURE
Project Manager/Designer, Inspection Oversight Coordinator, Joint Utilities Coordinator for NYNEX fiber
optic underground campus feed. Project involved campus mapping of all underground utilities, design
routing for conduit and manhole system, construction oversight.
STEWART INTERNATIONAL AIRPORT ACCESS IMPROVEMENTS, VERIZON, CHG&E, FRONTIER,
CATV, NEW WINDSOR, NY
Project Manager/Designer, Inspection Oversight Coordinator, Joint Utilities Coordinator for $8M joint
utility (Verizon, Frontier, CHG&E Gas, CHG&E, CATV) relocation/upgrade. Designed into
NYSDOT/NYSTA Project Construction, conduit and manhole designs, survey coordination, contract plans
and details, status meeting attendance, construction and inspection oversight, permitting. Project included
25,000’ design, two-bridge hanger attachments over Interstate 84 and the Catskill Aqueduct, and Crestview
Lake Causeway crossing. Project completed to meet inclusion dates by NYSDOT/NYSTA.
CORPORATE FIBER ROUTE, NEW YORK TELEPHONE, NEWBURGH AND MONTICELLO, NY
Project Manager/Designer, Inspection Oversight Coordinator for $3.5M fiber route project, including fiber
optic conduit and manhole design, plans, survey coordination, ROW acquisition, bid documents, pre-bid
conference, permitting, construction and inspection oversight for 20+ miles and three bridge crossings.
Project was completed below budget and on time.
ROUTE 9/ INTERSTATE 84 NYSDOT RELOCATION, NYNEX, CHG&E, AT&T, FISHKILL, NY
Project Manager/Designer, Inspection Oversight Coordinator, and Joint Utilities Coordinator for $5.1M
utility relocation. Joint utility (AT&T, CATV, NYNEX, CHG&E Gas, CHG&E) relocation merged with and
ahead of NYSDOT Project Construction, included conduit and manhole designs, survey coordination,
contract documents, bid meeting presentation, construction and inspection oversight, permitting and as-
builts. Construction oversight included survey stakeout 6 months prior to the NYSDOT project start, M&PT
plan completion, construction coordination, contract management, placement of 6 blinded storm drainage
crossing on line and grade for extension by the NYSDOT contractor subsequently. All constructed utilities
satisfied line and grade requirements when the NYSDOT contractor proceeded with the project work.
Project closeout included FIN form reimbursements for the electric company and pay requisition
certification for NYNEX. Project completed on time and budget.
TRAINING
•
Confined Space
Training,
Iroquois Gas
Oper. Co. -
Safety Seminar
•
Conduit Inspection
Operations
•
New York
Telephone
Conduit and
Manhole Design
Course (Bell Core
Curriculum)
•
OSP Locating
Seminar
(AT&T Clarksville)
•
Construction
Safety and
OSHA Seminar
(Business Council
of NYS)
•
Regional Safety
Seminar
(Region 8,
NYSDOT)
GAS MAIN RATE CASE, O&R UTILITIES, ORANGE COUNTY, NY
Project Director, Inspection Coordinator for coordination of aerial survey, field investigation, public records
research, design mapping, wetlands research and design routing for a 23.5 mile gas routing project. All
permit coordination, M&PT plans, E&SC plans and client-requested GIS mapping were performed under his
oversight. Construction bidding documents were administered, construction oversight services provided and
NYSDOT permit closeout provided. Project design included layout of an 800’ +/- directional bore under the
Wallkill River.
ELECTRIC SUBSTATION SITE PLANNING, CHG&E, NEW WINDSOR SUBSTATION, ORANGE
COUNTY, NY
Project Manager for coordinating field survey, site plan layout, grading, and retaining wall design for an
electric substation enlargement. Project scope included planning and zoning representation, public hearing
presentations, utility design, drawings, municipal permitting and specification review. Construction phase
services included coordination of poured and gabion wall inspections, review of grading, plantings, tie-in to
existing substation facilities. The client requested an elevated stairway to connect between the existing and
new substation expansion during design.
SUBMARINE CABLE CROSSINGS
Project Manager and Designer for eight submarine cable crossings of the Hudson River, New York and
Hackensack, Passaic and Raritan Rivers in New Jersey. Duties included coordination of soundings, survey,
permit application completion, oversight of drafting. Crossings were facilitated for New York Telephone,
Bell Atlantic, MCI, and Verizon.
ROUTE 9 CORRIDOR RELOCATION PROJECTS
Project Manager/Designer, Inspection Oversight Coordinator, and Joint Utilities Coordinator for for all
underground utilities relocation projects from Fishkill through Hyde Park, a total of approx. 16 miles.
Joint utility (AT&T, CATV, NYNEX, CHG&E Gas, CHG&E) relocation merged with and ahead of
NYSDOT Project Construction, included conduit and manhole designs, survey coordination, contract
documents, bid meeting presentation, construction and inspection oversight, permitting and as-builts.
Construction oversight included survey stakeout prior to the NYSDOT project start, M&PT plan
completion, construction coordination, and contract management,. All constructed utilities satisfied line and
grade requirements when the NYSDOT contractor proceeded with the project work. Project closeout
included FIN form reimbursements for the electric company and pay requisition certification for NYNEX.
Project completed on time and budget.
SITE DEVELOPMENT PROJECTS
Construction Services Manager/Coordinator for: Bank/Credit Union branches, Shopping center/Malls,
Retail , Restaurant, Office, Mixed Use parcels. Coordinating Construction Inspection, reviewing grading,
SWPPP, placement of drainage, sanitary, water, curbing, pavement, lighting, and landscaping. Reviewing
Shop Drawing submittals, RFIs, pay requisitions. Attending site progress meetings, coordinating for public
utility interface, NYSDOT Permit coordination and coverage.
Gary Aber
PROJECT EXPERIENCE
Machine-extracted for search and reference — the original PDF is the authoritative version.