croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Sunday, August 16, 2026· Aug 16, 2026
Source-linkedCorrections welcomed
Documents

Georgia Lane Storm water

resolution 1 page
Meeting: portal event 712 (no meeting page on file)
Agenda item: PROPOSED RESOLUTIONS: — Resolution- Dvirka and Bartilucci-Georigia Lane
Resolution, 1 page. Attached to agenda item: “PROPOSED RESOLUTIONS: — Resolution- Dvirka and Bartilucci-Georigia Lane”
Retrieved 2026-07-31 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: D and B Cover letter on final report D and B proposal for phase 1 repairs Georgia Lane Storm Water Management Basin Report FINAL Memo to manager on Georgia lane detention pond engineers re
On motion of TRUSTEE____________, seconded by TRUSTEE _______, the following resolution was adopted by the Board of Trustees of the Village of Croton-on- Hudson, New York: WHEREAS, the Village retained Dvirka and Bartilucci Consulting Engineers to model the storm water pond and tributary watershed and make recommendations for improvements at the Georgia Lane subdivision, and WHEREAS, the report titled “Georgia Lane/Waldwood Subdivision Storm Water Management Basin Engineering Design Report” was received on October 6, 2011, and WHEREAS, this report contains the results of the computer modeling and proposes 3 options to improve the operation of the pond; and WHEREAS, all options include repairs to the emergency spillway and damaged sections of the pond berm and installation of a trash rack; and WHEREAS, the Village Engineer has reviewed the proposal and recommends option 3 which is a complete replacement of existing outlet structure and discharge pipe at an estimated cost of 126, 350.00; and WHEREAS, a proposal from Dvirka and Bartilucci was received for the phase one design work for the project in the amount of $8500.00, NOW, THEREFORE BE IT RESOLVED: that the Village Manager is authorized to approve the proposal from Dvirka and Bartilucci in the amount of $8,500 for the phase one design work improvements at the Georgia Lane subdivision. Dated: November 7, 2011

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.