Memo to manager on Georgia lane detention pond engineers re
resolution
3 pages
Meeting: portal event 712 (no meeting page on file)
Agenda item: PROPOSED RESOLUTIONS: — Resolution- Dvirka and Bartilucci-Georigia Lane
Resolution, 3 pages. Attached to agenda item: “PROPOSED RESOLUTIONS: — Resolution- Dvirka and Bartilucci-Georigia Lane”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
D and B Cover letter on final report
D and B proposal for phase 1 repairs
Georgia Lane Storm Water Management Basin Report FINAL
Georgia Lane Storm water
Extracted text
EN GIN EERS OFFICE
Stanley H. Kellerhouse Municipal Building
One Van Wyck Street, 2nd floor
Croton-on-Hudson, NY 10520-2501
Mayor
Leo A.W. Wiegman
Trustees
Ann H. Gallelli
Ian W. Murtaugh
Gregory Schmidt
Casey Raskob
Village Manager
Abraham Zambrano
Assistant Village Manager
Janine King
Village Treasurer
Sandra Bullock
Village Engineer/Building Inspector
Daniel O’Connor, P.E.
Asst. Building Inspector/Assessor
Joseph Sperber
Fire Inspector
Peter Anfiteatro
MEMORANDUM
Date:
November 1, 2011
To:
Abe Zambrano
From:
Daniel O’Connor
Subject:
Georgia Lane Storm Water Management Pond Evaluation Report
The storm water management pond between Georgia Lane and Park Trail was built to
accommodate storm water drainage from the Waldwood Subdivision on Georgia Lane. There
have been some operational issues over the years mainly due to the undersized outlet structure
and design of the emergency spillway. These issues have resulted in frequent pond overflows in
the area of the emergency spillway with subsequent damage to the pond berm and downstream
properties. The Village retained Dvirka and Bartilucci Consulting Engineers to model the storm
water pond and tributary watershed and make recommendations for improvements to address the
above noted issues.
The report titled, “Georgia Lane/Waldwood Subdivision Storm Water Management Basin
Engineering Design Report, September 2011” was received on October 6, 2011. This report
contains the results of the computer modeling and makes recommendations for various
improvements. The tributary area to the pond is about 72 acres and includes Georgia Lane and
the associated residential subdivision, upstream woodlands and a portion of the Con Edison
transmission corridor lands. The report indicates that the emergency overflow spillway is
overtopped at the 5-year and larger storm events. Erosion of the spillway has occurred and it is
likely that some overtopping may occur during 2-year storm events due to ongoing erosion.
Overtopping of the emergency spillway occurs since the main outlet structure is not designed to
handle larger storm events. The report also notes that the culverts under Park Trail do not have
the capacity to handle flows from the 5-year storm event.
The storm water basin and tributary area are shown on the maps below. The flows from this
basin ultimately reach Batten Road and flow through the recently completed improvements and
then to the Croton River near Niles Road.
Georgia Lane Storm Water Management Pond Evaluation Report
Tel: 914-271-4783
www.crotononhudson-ny.gov
Fax: 914-271-3790
The report analyzed three possible options to improve the operation of the pond, one included a
proposed increase in the size of the pond, the second included the by-passing of the perennial
stream around the pond and the third included the complete replacement of the existing outlet
structure. All options included repairs to the emergency spillway and damaged sections of the
pond berm and installation of a trash rack.
Option #1: enlargement of the basin was deemed not feasible due to the need to obtain additional
easements on various properties as such this alternative was not recommended.
Option #2: bypass of the perennial stream was deemed possible but this option increased
downstream flows for smaller storm events and had a higher estimated cost ($143,150.00) than
option #3.
Option #3: The recommended option is option 3 which is the complete replacement of the
existing outlet structure and discharge pipe. This option has an estimated cost of $126,350.00.
Due to the existing issues with frequent overtopping of the emergency spillway option #3 will be
implemented in phases, phase 1 will include the replacement of the outlet structure and discharge
pipe and culverts under Park Trail. Phase 2 will include reconstruction of the emergency
spillway and section of the berm and removal of some sediment in the basin.
The current access easement to the storm water basin is from Georgia Lane even though access
from Park Trail is more efficient. A follow up to the drainage infrastructure improvements will
be the possible acquisition of a maintenance access easement from Park Trail to the storm water
basin.
A proposal from Dvirka and Bartilucci was received for the phase one design work; the cost of
the services is $8500.00. It is requested that this proposal be placed on the next Village Board
agenda for approval by the Village Board. The cost would be charged to the appropriate capital
account, which should be H8120-2106-09197.
Please let me know if any additional information is needed.
cc:
Janine King, Assistant Village Manager
File
Subject:
Georgia Lane Storm Water Management Pond Evaluation Report
Tel: 914-271-4783
www.crotononhudson-ny.gov
Fax: 914-271-3790
Georgia Lane storm water management pond and downstream drainage paths.
Georgia Lane storm water management pond (2 ft contours).
Machine-extracted for search and reference — the original PDF is the authoritative version.