croton.news
Croton’s #1 source for AI-generated hyperlocal news
Croton-on-Hudson, New York · Saturday, August 15, 2026· Aug 15, 2026
Source-linkedCorrections welcomed
Documents

FW Croton Upper Village

memo 1 page
Meeting: portal event 744 (no meeting page on file)
Agenda item: Correspondence — Memo from Village Manager Bryan Healy regarding Upper Village traffic study.
Memo, 1 page. Attached to agenda item: “Correspondence — Memo from Village Manager Bryan Healy regarding Upper Village traffic study.”
Retrieved 2026-07-31 from the village's meeting portal. View the original PDF ↗
Also attached to this agenda item: 19-008 Croton Upper Village Report 09.19.19 2019-09-23 Croton Upper Village Traffic Study Presentation BPC Memo On Dummy Light October 2019 Bike Ped Comments Memo Traffic Study Provident-Croton Traffic Proposal RFP - Traffic Engineering Res 19-34 Traffic Study
From: Janine King To: FW: Croton Upper Village Date: Tuesday, February 26, 2019 10:44:16 AM Attachments: image001.png From: Brian Dempsey [mailto:bdempsey@pderesults.com]  Sent: Tuesday, February 26, 2019 10:13 AM To: Janine King <jking@crotononhudson-ny.gov>; Frank Balbi <fbalbi@crotononhudson-ny.gov> Cc: Carlito Holt Subject: Croton Upper Village As per our discussion, Provident Design Engineering can perform the Capacity/Operational Analyses and the Simulation Analyses of the Old Post Road South and Grand Street intersection utilizing Synchro Analyses Software as well as SIM Traffic Software under our previous November 27, 2018 Proposal. If you have any questions, please let me know. Thanks, Brian Brian Dempsey, PE, PTOE Partner/Senior Project Manager Provident Design Engineering, PLLC 7 Skyline Drive, Suite 120, Hawthorne, NY 10532

Machine-extracted for search and reference — the original PDF is the authoritative version.

Experimental project: croton.news uses AI to generate articles from public records. Content may contain errors. Please report any inaccuracies and check our corrections log.