2019-09-23 Croton Upper Village Traffic Study Presentation
presentation
11 pages
Meeting: portal event 748 (no meeting page on file)
Agenda item: Further discussion regarding the Upper Village Traffic Study and the Dummy Light intersection.
Presentation, 11 pages. Attached to agenda item: “Further discussion regarding the Upper Village Traffic Study and the Dummy Light intersection.”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
19-008 Croton Upper Village Report 09.19.19
BPC Memo On Dummy Light October 2019
Bike Ped Comments
FW Croton Upper Village
Memo Traffic Study
Provident-Croton Traffic Proposal
RFP - Traffic Engineering
Res 19-34 Traffic Study
Extracted text
UPPER VILLAGE TRAFFIC STUDY PRESENTATION
VILLAGE OF CROTON-ON-HUDSON
SEPTEMBER 23, 2019
7 SKYLINE DRIVE, SUITE 120
HAWTHORNE, NEW YORK 10532
(914) 592 – 4040
WWW.PDERESULTS.COM
9/23/2019
PROVIDENT DESIGN ENGINEERING, PLLC
Existing Intersection
9/23/2019
PROVIDENT DESIGN ENGINEERING, PLLC
Study Methodology
Traffic Counts performed during following time periods:
◦Weekday AM Commuter Period
◦Weekday Midday Period
◦Weekday PM Commuter Period
◦Saturday Midday Period
◦Sunday Midday Period
Intersection Capacity Analysis run for three scenarios:
◦Signalized intersection control
◦Roundabout
◦All-Way Stop Control
Concept Plans prepared per analysis results and discussion with Village Officials
9/23/2019
PROVIDENT DESIGN ENGINEERING, PLLC
Level of Service Results
OVERALL LEVELS OF SERVICE - GRAND STREET & OLD POST ROAD
TIME PERIOD
EXISTING
UNSIGNALIZED
ROUNDABOUT
LOS
LOS
LOS
DELAY (sec)
DELAY (sec)
DELAY (sec)
PEAK AM HOUR (7:30 - 8:30)
B
B
A
16.2
10.3
6.4
PEAK MIDDAY HOUR (12:00 - 1:00)
B
A
A
12.7
8.5
4.9
PEAK PM HOUR (5:15 - 6:15)
B
A
A
14.1
9.4
5.7
PEAK SAT HOUR (11:45 - 12:45)
B
B
A
14.6
10.6
6.4
PEAK SUN HOUR (11:45 - 12:45)
B
A
A
14.5
9.5
5.9
9/23/2019
PROVIDENT DESIGN ENGINEERING, PLLC
Traffic Simulation Models
9/23/2019
PROVIDENT DESIGN ENGINEERING, PLLC
Concept Plan No. 1 – Striping Modifications
• Striping Improvements
• Maintain “Dummy” Signal As-Is
• Non-standard Signal Condition
Safety Concern
• Loss of up to 3 Parking Spaces
• $10,000 to $20,000
Concept Plan No. 2 – Striping with Traffic Signal Improvement
• Striping Improvements
• Upgraded Signal System
• Maintain “Dummy” Signal As-Is
• Pedestrian Signal Heads
• Loss of up to 3 Parking Spaces
• $150,000 to $250,000
Concept Plan No. 2A – Removal of “Dummy” Signal
• Striping Improvements
• Upgraded Signal System
• Remove “Dummy” Signal
• Pedestrian Signal Heads
• Loss of up to 3 Parking Spaces
• $200,000 to $300,000
Concept Plan No. 3 - Roundabout
• Install Roundabout
• Traffic Meters Itself
• Low Speed Movements
• “Dummy” Maintained But Dark
• Crosswalks Away from Intersection
• Loss of up to 13 Parking Spaces
• $500,000 to $750,000
Concept Plan No. 4 – All-Way Stop Control (Preferred Alternative)
• Striping Improvements
• All-Way Stop Control
• Maintain “Dummy” Signal Flash Red
• All Traffic Must Stop
• Loss of up to 1 Parking Space
• $10,000 to $25,000
THANK YOU
Carlito Holt – Managing Partner/Senior Project Manager
Phone: 914.367.0204
Email: cholt@pderesults.com
Danny Cuya – Engineer
Phone: 914.367.0020
Email: dcuya@pderesults.com
9/23/2019
PROVIDENT DESIGN ENGINEERING, PLLC