WAC Memo Bridge Painting 2022
memo
1 page
Meeting: portal event 756 (no meeting page on file)
Agenda item: LWRP Consistency Review for the NYSDOT Bridge Painting Project for the Warren Road Overpass.
Memo, 1 page. Attached to agenda item: “LWRP Consistency Review for the NYSDOT Bridge Painting Project for the Warren Road Overpass.”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
881357 cor ltr dos fan pckg
F-2022-0147-LWRP Memo
LWRP Bridge Painting
Extracted text
ANN GALLELLI
Members
STUART GREENBAUM
LEN SIMON
Attorney
LINDA WHITEHEAD
Village Engineer
DANIEL O’CONNOR, P.E.
TO: Mayor Brian Pugh and the Village Board of Trustees
FROM:
Chairman Gallelli, Waterfront Advisory Committee
RE: Referral from the Village Board regarding Letter from NY State Department of State
requesting a LWRP Consistency Review for a NYS DOT Bridge Painting Project
along Route 9 (Warren Road)
DATE: March 30, 2022
On March 29th, 2022, the Waterfront Advisory Committee (WAC) reviewed the above-
referenced referral for consistency with the Village’s Local Waterfront Revitalization Program
(LWRP). Based on the review of the application documents, the WAC made a recommendation
of consistency with the LWRP. The vote was 3-0.
The WAC evaluated this application for consistency in accordance with the LWRP policy
standards and conditions set forth in section 225-6(J) of the Village Code, which are further
explained and described in Section III of the LWRP. The WAC members reviewed the policies
in the LWRP and believe that the policies listed below are applicable to this application.
The policy the WAC believes is relevant is:
POLICY 39: The transport, storage, treatment and disposal of solid wastes, particularly
hazardous wastes, within coastal areas will be conducted in such a manner so as to
protect groundwater and surface water supplies, significant fish and wildlife habitats,
recreation areas, important agricultural lands and scenic resources.
The painting of the Warren Road bridge will include preparation work that will create debris such
as paint chips, etc. The WAC discussed that best management practices must be incorporated
into the work to eliminate any debris from entering the storm water drainage system which
discharges into the Hudson River. EPA and other regulatory requirements shall be included if
lead based paint needs to be removed.