Res 52-2022 Wall Budget Transfer
resolution
1 page
Meeting: portal event 761 (no meeting page on file)
Agenda item: Proposed Resolutions — Consider authorizing the Village Treasurer to make an interfund transfer in the amount of $3,000 for the revision of construction plans for the Grand Street Retaining Wall project.
Resolution, 1 page. Attached to agenda item: “Proposed Resolutions — Consider authorizing the Village Treasurer to make an interfund transfer in the amount of $3,000 for the revision of construction plans for the Grand Street Retaining Wall project.”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
19-153 Prop 8Apr22
Extracted text
On motion of TRUSTEE____________, seconded by TRUSTEE _______, the
following resolution was adopted by the Board of Trustees of the Village of Croton-
on-Hudson, New York:
Resolution #52-2022
WHEREAS, in 2020, the Village received design documents to replace the existing
retaining wall located at 25 and 33 Grand Street; and
WHEREAS, the COVID-19 pandemic placed this project on a temporary hold; and
WHEREAS, in January 2022, the Village was awarded a matching grant from
Westchester County to replace the retaining wall; and
WHEREAS, Ronald Wegner, Assistant Village Engineer, has received a proposal
from Carlin Simpson & Associates of Sayreville, New Jersey, to revise the design
documents in the amount of $3,000,
NOW, THEREFORE BE IT RESOLVED: that the Village Board hereby
authorizes the Village Treasurer to transfer $3,000 from Contingency Account
A1990.4000 to the following accounts:
A8020.4000 – Planning – Contractual:
$3,000
Dated: April 18, 2022
Machine-extracted for search and reference — the original PDF is the authoritative version.