19-153 Prop 8Apr22
resolution
3 pages
Meeting: portal event 761 (no meeting page on file)
Agenda item: Proposed Resolutions — Consider authorizing the Village Treasurer to make an interfund transfer in the amount of $3,000 for the revision of construction plans for the Grand Street Retaining Wall project.
Resolution, 3 pages. Attached to agenda item: “Proposed Resolutions — Consider authorizing the Village Treasurer to make an interfund transfer in the amount of $3,000 for the revision of construction plans for the Grand Street Retaining Wall project.”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Res 52-2022 Wall Budget Transfer
Extracted text
CARLIN SIMPSON & ASSOCIATES, LLC
Consulting Geotechnical and Environmental Engineers
61 Main Street, Sayreville, New Jersey 08872
Tel. (732) 432-5757
Fax. (732) 432-5717
8 April 2022
Principal:
Robert B. Simpson, P.E.
Associates:
Meredith R. Anke, P.E.
Stephen Rossi, P.E.
Kurt W. Anke
Eric J. Shaw
Village of Croton-on-Hudson
Engineers Office
1 Van Wyck St.
Attn:
Mr. Ronald Wegner, P.E.
Re:
Redesign Redi-Rock Retaining Wall
Existing Retaining Wall
25 and 33 Grand St.
Croton-on-Hudson, NY (CSA Job #19-153)
Dear Mr. Wegner:
In accordance with your request, we are pleased to submit this proposal to redesign the
Redi-Rock retaining wall for the above referenced site. The original design was completed in
March 2020.
We understand that the proposed retaining wall and sidewalk locations have changed. We
have also been provided comments on the original drawing that you would like us to address. One
such comment refers to using solid block units instead of hollow core, due to the limited
availability of the latter. After reviewing our original Redi-Rock design drawings and taking into
consideration your comments, we have determined that a redesign of the retaining wall will be
necessary.
The scope of work is to redesign the Redi-Rock wall plans with taking into consideration
your comments and the new wall and sidewalk location.
In order to complete this study, the following will be required.
1. Review our Redi-Rock retaining wall design drawings from March 2020.
2. Redesign the Redi-Rock retaining wall with the new wall and sidewalk
location.
3. Determine the feasibility of using solid Redi-Rock block units in-lieu of
Hollow Core units.
4. Provide three (3) printed copies and an electronic Portable Document
Format (PDF) of the signed and sealed retaining wall drawing set upon
completion.
The cost of this study will be as follows:
I.
Redesign Redi-Rock Retaining Wall
Estimate based on the unit rates below
$3,000
The estimated total cost of this study will be $3,000. You will be billed after the
completion of our final report. Payment is requested within 30 days.
II. Additional Services (if required)
Services of Robert B. Simpson, P.E.
$195/hour
Services of Staff Engineers
$125/hour
Services of Technicians and Draftsmen
$95/hour
Clerical Services
$75/hour
The signed and sealed Redi-Rock wall drawing set will be submitted about 3-4 weeks after
receiving your authorization to proceed.
We look forward to working with you on this project. If the terms of this proposal are
satisfactory, please sign and return one copy of this proposal or issue a Purchase Order that refers
to this project.
CARLIN-SIMPSON & ASSOCIATES
ROBERT B. SIMPSON, P.E.
Approved By ______________________________________ Date _________________
File No. 19-153