WAC Memo - Historic Hudson Valley
memo
3 pages
Meeting: portal event 770 (no meeting page on file)
Agenda item: LWRP Consistency Review for site improvements at Van Cortlandt Manor (525 South Riverside Avenue).
Memo, 3 pages. Attached to agenda item: “LWRP Consistency Review for site improvements at Van Cortlandt Manor (525 South Riverside Avenue).”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
3-5522-00352 00005 FW - LWRP
Historic Hudson Valley Van Cortland Manor Article 24...
HistoricHudsonValley Van Cortlandt Manor NOIA Response...
LWRP Van Cortlandt Manor
Extracted text
ANN GALLELLI
Members
STUART GREENBAUM
LEN SIMON
Attorney
LINDA WHITEHEAD
Village Engineer
DANIEL O’CONNOR, P.E.
TO: Mayor Brian Pugh and the Village Board of Trustees
FROM: Chairman Gallelli, Waterfront Advisory Committee
RE: Referral from Village Board for LWRP Consistency Review regarding site
Improvements at Van Cortlandt Manor
DATE: April 29, 2022
On April 28th, 2022, the Waterfront Advisory Committee (WAC) reviewed for consistency with the
Village’s Local Waterfront Revitalization Program (LWRP) a referral from the Village Board on
correspondence from New York State Department of Environmental Conservation for site
improvements, some of which will occur in the 100 ft. wetland/watercourse buffer located at 525
South Riverside Avenue (Historic Hudson Valley). Based on the Committee’s review of the 44
LWRP policies, the Waterfront Advisory Committee made a recommendation of consistency
with the LWRP. The vote was 3-0 all in favor.
The committee reviewed the 44 LWRP policies and determined that the following policies were
relevant:
POLICY 1: Restore, revitalize, and redevelop deteriorated and underutilized waterfront
areas for commercial, industrial, cultural, recreational and other compatible uses.
This policy is applicable to and the proposed improvement project is consistent with this policy.
The proposed improvements will help restore and revitalize the Historic Hudson Valley’s historic
site area for its recreational and cultural uses, such as the Blaze event and educational school
visits. Historic Hudson Valley views this proposed project as an “opportunity to make urgently-
needed improvements that will ensure the safety, comfort, access, and enjoyment of visitors to
Van Cortlandt Manor, as well as restore the Colonial Revival landscape.” Proposed
improvements such as historic landscaping and path restoration of the Long Walk and driveway
improvements will restore and revitalize Van Cortlandt Manor’s deterioriating site.
POLICY 7: Significant coastal fish and wildlife habitats will be protected, preserved, and,
where practical, restored so as to maintain their viability as habitats.
POLICY 7A: The quality of the Croton River and Bay significant fish and wildlife habitat
and Haverstraw Bay significant fish and wildlife habitat shall be protected and improved
for conservation, economic, aesthetic, recreational, and other public uses and values. Its
resources shall be protected from the threat of pollution, misuse, and mismanagement.
POLICY 7B: Materials that can degrade water quality and degrade or destroy the
ecological system of the Croton River and Bay significant fish and wildlife habitat and
Tel: 914-271-4783
www.crotononhudson-ny.gov
Fax: 914-271-3790
the Haverstraw Bay significant fish and wildlife habitat shall not be disposed of or
allowed to drain in, or on land within, the area of influence in the significant fish and
wildlife habitats.
POLICY 7C: Storage of materials that can degrade water quality and degrade or destroy
the ecological system of the Croton River and Bay significant fish and wildlife habitat or
Haverstraw Bay significant fish and wildlife habitat shall not be permitted within the area
of influence of the habitat unless best available technology is used to prevent adverse
impacts to the habitat.
POLICY 7D: Restoration of degraded ecological elements of the Croton River and Bay
and Haverstraw Bay significant fish and wildlife habitats and shore lands shall be
included in any programs for cleanup of any adjacent toxic and hazardous waste sites.
POLICY 7E: Runoff from public and private parkings lots and from storm sewer
overflows shall be effectively channeled so as to prevent oil, grease, and other
contaminants from polluting surface and ground water and impact the significant fish
and wildlife habitats.
POLICY 7F: Construction activity of any kind must not cause a measureable increase in
erosion or flooding at the site of such activity, or impact other locations. Construction
activity shall be timed so that spawning of anadromous fish species and shellfish will not
be adversely affected.
POLICY 7G: Such activities must not cause degradation of water quality or impact
identified significant fish and wildlife habitats.
These policies are applicable to and the proposed site improvement project is consistent with
these policies. The use of Best Management Practices will control stormwater runoff into coastal
waters and prevent adverse impacts to the habitat. The existing sedimentation basin outside
the wetland will continue to be utilized.
POLICY 11: Buildings and other structures will be sited in the coastal area so as to
minimize damage to property and the endangering of human lives caused by flooding
and erosion.
POLICY 11A: Erosion and sediment control measures shall be undertaken in order to
safeguard persons, protect property, prevent damage to the environment, and promote
the public welfare by guiding, regulating and controlling the design, construction, use
and maintenance of any development or other activity which disturbs or breaks the
topsoil or results in earth movement.
POLICY 14: Activities and development, including the construction or reconstruction of
erosion protection structures, shall be undertaken so that there will be no measurable
increase in erosion or flooding at the site of such activities or development, or at other
locations.
These policies are applicable to and the proposed project is consistent with these policies. The
goal of the proposed site improvement project is make urgently needed improvements that will
ensure the safety and access to Van Cortlandt Manor. Improvements to the pathways will
“ensure that they conform to universal access requirements, reduce trip hazards, and contribute
to overall visitor safety.” The concrete pads for the Visitor Center and Tent complex will ensure
safety and stability of the structures. The gravel drive is to be re-graded to drain to swales to
reduce flooding and erosion. The runoff from the concrete pads will be directed to a grass swale
and then to existing sedimentation basin.
POLICY 23: Protect, enhance and restore structures, districts, areas of sites that are of
significance in the history, architecture, archaeology or culture of the stae, its community
or the nation.
This policy is applicable to the proposed site improvements and the proposed project is
consistent with this policy. The purpose of this improvement project is to make “urgently-needed
improvements that will ensure the safety, comfort, access, and enjoyment of visitors to Van
Cortlandt Manor, as well as restore the Colonial Revivial landscape that is central to the integrity
of the National Historic Landmark site.”
POLICY 33: Best Management Practices will be used to ensure the control of stormwater
runoff and combined sewer overflows draining into coastal waters.
POLICY 33A: Encourage new developments to retain stormwater runoff on site so as to
not increase flows within the existing system or to improve existing stormwater runoff
systems so that runoff from such developments does not adversely impact coastal
waters.
POLICY 37: Best Management Practices will be utilized to minimize the non-point
discharge of excess nutrients, organics and eroded soils into coastal waters.
POLICY 37A: Standards and specifications for the control of non-point source discharge
as set forth in Westchester County’s Best Management Practice Manual or other
recognized reference shall be utilized during development of any site.
POLICY 44: Preserve and protect tidal and freshwater wetlands and preserve the benefits
derived from these areas.
POLICY 44A: Wetlands, water bodies and watercourses shall be protected by preventing
damage from erosion or siltation, minimizing distrubance, preserving natural habitats
and protecting against flood and pollution.
These policies are consistent with and applicable to the proposed project. Best Management
Practices will be utilized to reduce any impacts to the site. The existing sedimentation basin
outside the wetland will continue to be utilized. The drainage swales will direct stormwater
runoff to the existing sedimentation basin, thereby reducing erosion into coastal waters. The
existing drainage patterns are being maintained and the stormwater drainage velocity is being
reduced via the use of erosion control measures.
The WAC believes that the proposed development will not have any potentially significant
adverse impacts on coastal resources and is consistent with the LWRP policy standards.
Because there are no expected adverse impacts on coastal resources, there is no reason to
consider alternative actions or mitigation measures.
It is for the reasons contained in this memorandum that the WAC issues its recommendation of
consistency.
Machine-extracted for search and reference — the original PDF is the authoritative version.