COMPLETE PROPOSAL 4-5-2022
resolution
27 pages
Meeting: portal event 774 (no meeting page on file)
Agenda item: Proposed Resolutions — Consider authorizing the Village Manager to award the Washington Engine Solar Rooftop Project RFP to Croton Energy Group in the amount of $100,526.
Resolution, 27 pages. Attached to agenda item: “Proposed Resolutions — Consider authorizing the Village Manager to award the Washington Engine Solar Rooftop Project RFP to Croton Energy Group in the amount of $100,526.”
Retrieved 2026-07-31 from the village's meeting portal.
View the original PDF ↗
Also attached to this agenda item:
Res 82-2022 Washington Engine
Solar RFP for Firehouse rooftop 021922
Extracted text
PROPOSAL
For Procurement and Installation of a
Solar Power System on the Roof of the
Washington Engine Firehouse at 81 North
Riverside Avenue in Croton on Hudson
Croton Energy Group
75 S Riverside Avenue Suite G
Croton-on-Hudson, NY 10520
Contents
2.Executive Summary ............................................................................................................................................ 4
Project Description ............................................................................................................................................ 4
3.Certificate of Non-Collusion ................................................................................................................................ 4
Section 2 – Experience & Qualification .............................................................................................................. 5
Section 3 – Proposal Narrative .......................................................................................................................... 9
Section 4 –Technical Proposal ......................................................................................................................... 10
Section 5 – Price Proposal ............................................................................................................................... 11
Appendix 2: Price Proposal Template .................................................................................................................. 11
Appendix 4: Surety Bond Form ............................................................................................................................ 12
Exhibit A – Description of Property ..................................................................................................................... 13
Exhibit B – Photos of Premises ............................................................................................................................ 14
Croton Energy Group Inc
75 South Riverside Avenue
Croton-on-Hudson, New York 10520
914-862-4177
crotonenergy.com
your solar energy experts
4/4/2022
Bryan Healy
bhealy@crotononhudson-ny.gov
Re: Response to Procurement and Installation at the Washington Engine Firehouse of a Rooftop Solar PV System for
Solar Power Production
Dear Mr. Healy:
Having reviewed the RFP for rooftop solar at the Washington firehouse , and surveying the site at 81 N.
Riverside Avenue, Croton-on-Hudson, we fully understand the requirements of this project and the
needs of the Village of Croton-on-Hudson . With that understanding we are proud to present this
proposal in response to that request.
Please send any response or questions to
Gregory King
CEG head of Sales
gking@crotonenergy.com
914-862-4177
Sincerely
Patrick Dias
President Croton Energy Group
4/4/2022
2.Executive Summary
Project Description
We propose that we Croton Energy Group (CEG) procure and install a rooftop solar pv system on the
Washington Firehouse.
CEG will be responsible for the System’s design, engineering, permitting, installation, testing, operation,
maintenance, repair, management including, without limitation, procurement of the solar photovoltaic
equipment and related services, including any necessary changes to the utility service. CEG will be solely
responsible for commissioning, interconnection, metering, and for providing security for the system
during installation and startup operation. CEG will be responsible for all project costs including, but not
limited to: the furnishing of all materials, services, labor, performance and payment bonds, insurance,
and other costs incurred in the preparation of this response and the performance of the contract.
CEG will subcontract the services of it’s “strategic partner” Switch Electric, a local business as the
“Licensed Electrician” for purposes of interconnection with the existing ConEdison grid.
The installation of this project shall include permanently installed safety railing to meet OSHA standards
of workplace safety for any construction or future maintenance.
This includes on-site monitoring provided by SolarEdge for the life of the system.
3.Certificate of Non-Collusion
The undersigned certifies, under penalties of perjury, that this bid or proposal has been made
and submitted in good faith and without collusion or fraud with any other person. As used in
this certification, the word “person” shall mean any natural person, business, partnership,
corporation, union, committee, club or other organization, entity, or group of individuals.
(Name of person signing proposal)
(Name of business)
Patrick Dias
Croton Energy Group Inc
Section 2 – Experience & Qualification
•
Founded in 2011 Croton Energy Group has been installing solar continuously for 11 years this April.
•
Croton Energy Group is a New York S-Corp
•
Tax ID 09-0692614
•
CEG corporate offices are located at 75 S. Riverside Avenue, Croton-on-Hudson, NY 10520
•
Currently we have 5 employees working in our office
•
EMR rating in 2021 was 0.92
Your firm’s Experience Modification Rate (EMR) for each of the past three years and your firm’s OSHA ratings
(Recordable Incidence Rates and Lost Workday Incident Rates) for the past three years
•
Our firm has not been involved in and is not presently involved in any litigation and is not
debarred, suspended or otherwise prohibited from practice by any federal, state, or local
agency.
•
References
o Croton Community Solar
▪
Croton DPW
▪
System Size: 306kW
▪
Metering for power production
▪
Date Completed: June 3, 2020
▪
Contact Name: Bryan Healy Email: bhealy@crotononhudson-ny.gov
o Bedford Police Department Carport
▪
System Size: 42.55 kW
▪
Metering for power production
▪
Date Completed: November 1, 2019
▪
Contact Name: Abe Zambrano Email: azambrano@bedfordny.gov
o St Theresa
▪
System Size: 161.95 kW
▪
Metering for power production
▪
Date Completed: February 2, 2022
▪
Contact Name: Shelby Hang Email: shelby@ecogyenergy.com
•
Project Development Experience
o CEG has installed over 5 Megawatts of New York solar in the last 5 years in over 50
projects
o We currently operate and manage approximately 75 solar rooftop
systems.
o Our customers are residential, municipalities, utilities, developers, and
commercial as well as non-profit organizations.
o Projects installed by CEG have a particular feel of quality and attention to detail.
Systems are designed and installed to produce with minor maintenance for thirty
years and are backed by the manufacturers warranties as well as CEG.
o At CEG we pride ourselves on our record of safety. No employee has suffered injury
due to our lack of attendance to the safety standards outlined by OSHA.
•
Project Financing Capability
o CEG has installed ten systems that are not on single family homes
o Provide most recent audited financial statements, annual reports, consolidated
financials, and Form 10-K (if any). If available, provide similar materials for parent
entities, significant affiliates and collaborators.
o Provide proof of installation of past solar projects: source(s), dollar value, and date
Section 3 – Proposal Narrative
Provide a detailed plan of the proposed project. Project plans must include the following:
•
Project Management Plan
o Contract signing initiates timeline
o CEG will send the project to the engineering team
o Reserve modules and equipment for the project prepay as necessary.
o 30 days in engineering
o File interconnection application, NYSERDA application and building permit application. Our
electrician will separately file with an electrical inspection service.
o 30 days in permitting
o Schedule delivery of equipment.
o Allow 15 – 30 days to construction date
o Allow 15 days for construction
o Schedule inspections
o Allow 30 days for “Permission to Operate” from the utility.
o Approximate length of project 120 days.
•
Site Work and onsite interaction with the Firehouse and it’s business:
o All work onsite work and visits will be coordinated with the Villages on-site
manager/ representative.
o There’s access to the buildings roof from behind the building perpendicular to High
Street. This will be used to access the rooftop via ladder. Front entry will only be
necessary to access the Electric Room.
•
Deliveries:
o Deliveries will be met and trucks offloaded on High Street. With the exception of
the solar modules all deliveries will be immediately moved to the roof.
o There will be 3 main deliveries
▪
Safety rail scheduled for day 1
▪
Solar racking racking scheduled for day 2
▪
Solar modules scheduled for day 3 Modules will wait for installation on
the neighboring driveway. We’ll attempt to schedule delivery as close to
“on time” as we can.
o Sequence of installation events
▪
Safety railing is a permanent installation and requires the support of the roofing
contractor that holds the warranty. This will be approximately 5 days
▪
Solar racking installation will begin near High Street as the railing is completed
in that area. A temporary barrier will be erected to keep workers 6’ from any
unfinished railing area.
▪
Solar racking and PV wiring will take place over a 5 day period with modules
installed on the last two days of the installation.
▪
AC Electrical work and interconnection will take about 5 days and require
approximately 1 hour of shutdown. This coordinated with the onsite Village
Rep.
▪
Testing and commission takes place after all workers have left the site and
requires no shutdown.
▪
Over the final 30 days we will be back and forth with inspectors and the utility
may want a witness test.
•
Project Financing Plan
o We understand that this project will be financed by NYSERDA and the price for the PV
system and it’s installation and maintenance for four years is not to exceed $95,000.
Milestone payments to be coordinated upon award.
•
Operations and Maintenance Plan
o CEG monitors all systems on the SolarEdge website daily. If a performance issue is
noted a team is sent to review the problem. For a period of four years CEG will
replace any item that is determined to be “under-performing” at no cost to the
Village regardless of manufacturer’s warranty. CEG will perform an onsite review and
check-up of all system related equipment and wiring to ensure proper function and
performance every 2 years. A longer maintenance contract will be made available to
the village after the four year warranty period has expired.
•
Local Business Utilization Plan
o Croton Energy Group and it’s subcontractors are local Croton businesses
Section 4 –Technical Proposal
Please See the attached Technical Proposal
Section 5 – Price Proposal
Appendix 2: Price Proposal Template
PV System Size
37.31kW dc
Annual System
Degradation Factor
0.05
%/year
Year 1 Estimated kWh
Generation
42,166kWh
All-inclusive Price
$100,526
Total incentives
$7,462
Price Net of incentives
$93,064
Appendix 4: Surety Bond Form
CERTIFICATE OF SURETY
The undersigned hereby certify that they are the duly authorized agents of
duly authorized to do business in the State of New York, and agree to furnish to
surety bonds for the faithful performance of any and all provisions contained in the
Specifications and Contract. The maximum amount that we will be surety for on each bond is:
Surety Company or Agent
By
_
The terms of the Surety Company for furnishing the bond are hereby accepted.
Name of Bidder
By
Witness
(signature)
Title
Exhibit A – Description of Property
The tax map of the Village lists the parcels of land where the Facility is located as:
67.20-4-40
Exhibit B – Photos of Premises
Firehouse from North Riverside Avenue and aerial view of rooftop prior to 2019 re-roofing
Rooftop photos taken in 2021 (after re-roofing)
Solar Photovoltaic Proposal
Prepared For
Village of Croton
(914) 271-6501
energywiz@aol.com
Our motto is “Solar Made Better.”
Croton Energy Group Inc (CEG) provides
comprehensive solar energy systems
design, installation and operation for
commercial and residential clients
throughout New York State. Led by
NABCEP PV Installation Professional™
Patrick Dias, CEG is a licensed
Westchester County Home
Improvement Contractor (License
#26932-H13), and a NYSERDA eligible
solar installer (PV Contractor #5051).
Jinko 410
Contents
1 Project Summary
2 Project Details
2.1 Solar Photovoltaic (PV) System Details
2.2 Rebates and Incentives
2.3 Utility Rates
2.4 Current Electric Bill
2.5 New Electric Bill
3 Cash Flow Analysis
3.1 Cash Purchase
Notes:
Prepared By
Gregory King
(914) 844-1720
gking@crotonenergy.com
Croton Energy Group Inc.
75 South Riverside Ave.
Croton-on-Hudson, NY, 10520
NYSERDA PV Contractor #5051
Westchester County Contractor #26932-H13
4/5/2022
Price includes installing a 3' Hollander speed/safety rail on top of three
edges of the parapet wall (except for the south west side).
Tax incentive information:
Find the Federal Investment Tax Credit instructions for your solar energy
system here: https://www.irs.gov/forms-pubs/about-form-5695
Find the New York State solar energy credit instructions here:
https://www.tax.ny.gov/pit/credits/solar_energy_system_equipment_credit.htm
Site photo and rendered simulation of the solar system proposed for Jinko 410.
Prepared By: Gregory King
P: (914) 844-1720
E: gking@crotonenergy.com
Date: 4/5/2022
Jinko 410
Prepared By: Gregory King
P: (914) 844-1720
E: gking@crotonenergy.com
Date: 4/5/2022
Jinko 410
1 Project Summary
Payment Options
Cash Purchase
Gross Project Cost
$100,526
Total Incentives
$7,462
LCOE PV Generation
$0.079 /kWh
Payback Period
16.6 Years
Electric Bill Savings - Year 1
$4,589
IRR-30 Year
5.1%
ROI Term
115.0%
Combined Solar PV Rating
Power Rating:
37,310 W-DC (32,644 W-AC-CEC)
Energy Production: 42,166 kWh in year 1
Cumulative Energy Costs By Payment Option
Year 0
Year 4
Year 8
Year 12
Year 16
Year 20
Year 24
Year 28
$0
$50,000
$100,000
$150,000
$200,000
$250,000
Cumulative Energy Costs
Avoided Utility Cost
Cash Purchase
Prepared By: Gregory King
P: (914) 844-1720
E: gking@crotonenergy.com
Date: 4/5/2022
Jinko 410
2 Project Details
2.1 Solar Photovoltaic (PV) System Details
General Information
Facility:
Facility #1
Address: 81 N Riverside Ave Croton-On-Hudson NY 10520
Solar PV Equipment Description
Solar Panels: (91) Jinko Solar JKM410M-72HL-V-A3.2-US
Inverters:
(1) SolarEdge SE43.2K
Solar PV Equipment Warranties
Solar Panels: 25 Year (Power and Product)
Inverters: 12 Years
Solar PV System Cost and Incentives
Solar PV System Cost
$100,526
PV Incentives
-$7,462
Net Solar PV System Cost
$93,064
Solar PV System Rating
Power Rating:
37,310 W-DC
Energy Production: 42,166 kWh in yr 1
Energy Consumption Mix
Annual Energy Use: 31,914 kWh
Utility
-10,252 kWh (0.00%)
Solar PV
42,166 kWh (100.00%)
Monthly Energy Use vs Solar Generation
1/01 - 2/01
2/01 - 3/01
3/01 - 4/01
4/01 - 5/01
5/01 - 6/01
6/01 - 7/01
7/01 - 8/01
8/01 - 9/01
9/01 - 10/01
10/01 - 11/01
11/01 - 12/01
12/01 - 1/01
1,000
2,000
3,000
4,000
5,000
6,000
Energy (kWh)
Energy Use (kWh)
Solar Generation (kWh)
Prepared By: Gregory King
P: (914) 844-1720
E: gking@crotonenergy.com
Date: 4/5/2022
Jinko 410
2.2 Rebates and Incentives
This section summarizes all incentives available for this project. The actual rebate and incentive amounts for this
project are shown in each example.
2.3 Utility Rates
NY Sun - Nonresidential (Block 10) Con Edison
New York State Energy Research and Development Authority (NYSERDA) through the NY-Sun Incentive Program provides incentives for
installation of non-residential new grid connected solar photovoltaic (PV) systems with a maximum size of 7.5MW DC. The incentive is
structured as a 100% upfront payment. The upfront payment is calculated as $.20 * System Size (W).
Total Incentive Value: $7,462
The table below shows the rates associated with your current utility rate schedule (EL 9). Your estimated electric bills after solar are shown
on the following page.
Customer Charges
Energy Charges
Demand Charges
Season
Charge
Type
Rate Type
EL 9
Season
Charge
Type
Rate
Type
EL 9
Season
Charge
Type
Rate
Type
EL 9
S
Flat Rate
per billing period
$205.19
S
Flat Rate
Import
$0.0999
S
T < 5 kw
Import
$3.33
W1
Flat Rate
per billing period
$165.25
W1
Flat Rate
Import
$0.0999
S
5 kw < T
Import
$32.39
W2
Flat Rate
per billing period
$165.25
W2
Flat Rate
Import
$0.0999
W1
T < 5 kw
Import
$3.33
W3
Flat Rate
per billing period
$165.25
W3
Flat Rate
Import
$0.0999
W1
5 kw < T
Import
$26.28
W2
T < 5 kw
Import
$0.63
W2
5 kw < T
Import
$23.58
W3
T < 5 kw
Import
$3.33
W3
5 kw < T
Import
$26.28
Prepared By: Gregory King
P: (914) 844-1720
E: gking@crotonenergy.com
Date: 4/5/2022
Jinko 410
2.4 Current Electric Bill
The table below shows your annual electricity costs based on the most current utility rates and your previous 12
months of electrical usage.
Rate Schedule: ConEd - EL 9
Time Periods
Energy Use (kWh)
Max Demand (kW)
Charges
Bill Ranges & Seasons
Total
NC / Max
Other
Energy
Demand
Total
1/1/2021 - 2/1/2021 W2
2,538
$165
$254
$239
$658
2/1/2021 - 3/1/2021 W2
2,502
$165
$250
$192
$607
3/1/2021 - 4/1/2021 W2
2,430
$165
$243
$121
$529
4/1/2021 - 5/1/2021 W2
3,582
$165
$358
$239
$762
5/1/2021 - 6/1/2021 W3
2,790
$165
$279
$148
$592
6/1/2021 - 7/1/2021 S
2,772
$205
$277
$146
$628
7/1/2020 - 8/1/2020 S
2,700
$205
$270
$308
$783
8/1/2020 - 9/1/2020 S
2,790
$205
$279
$179
$663
9/1/2020 - 10/1/2020 S
2,448
$205
$245
$438
$887
10/1/2020 - 11/1/2020 W1
2,052
$165
$205
$69
$439
11/1/2020 - 12/1/2020 W2
2,628
$165
$263
$192
$620
12/1/2020 - 1/1/2021 W2
2,682
$165
$268
$74
$507
Total
31,914
-
$2,143
$3,188
$2,344
$7,675
2.5 New Electric Bill
Rate Schedule: ConEd - EL 9
Time Periods
Energy Use (kWh)
Max Demand (kW)
Charges
Bill Ranges & Seasons
Total
NC / Max
Other
Energy
Demand
Total
1/1/2021 - 2/1/2021 W2
$165
$55
$239
$459
2/1/2021 - 3/1/2021 W2
-780
$165
$78
$145
$232
3/1/2021 - 4/1/2021 W2
-1,768
$165
$177
$97
$86
4/1/2021 - 5/1/2021 W2
-320
$165
$32
$168
$301
5/1/2021 - 6/1/2021 W3
-2,215
$165
$221
$69
$13
6/1/2021 - 7/1/2021 S
-1,747
$205
$175
$17
$47
7/1/2020 - 8/1/2020 S
-1,834
$205
$183
$114
$136
8/1/2020 - 9/1/2020 S
-1,533
$205
$153
$17
$69
9/1/2020 - 10/1/2020 S
-904
$205
$90
$308
$423
10/1/2020 - 11/1/2020 W1
-1,173
$165
$117
$17
$65
11/1/2020 - 12/1/2020 W2
$165
$59
$192
$416
12/1/2020 - 1/1/2021 W2
$165
$89
$74
$328
Total
-10,250
-
$2,143
$512
$1,456
$3,086
Annual Electricity Savings: $4,589
Prepared By: Gregory King
P: (914) 844-1720
E: gking@crotonenergy.com
Date: 4/5/2022
Jinko 410
3 Cash Flow Analysis
3.1 Cash Purchase
Assumptions and Key Financial Metrics
Total Project Costs
$100,526
IRR - Term
5.1%
Payback Period
16.6 Years
ROI
115.0%
PV Degradation Rate
0.50%
Discount Rate
5.0%
Energy Cost Escalation Rate
3.0%
Federal Income Tax Rate
30.0%
State Income Tax Rate
8.0%
Years
Project Costs
PV Incentives
Electric Bill Savings
Total Cash Flow
Cumulative Cash Flow
Upfront
-$100,526
$7,462
-
-$93,064
-$93,064
-
-
$4,589
$4,589
-$88,475
-
-
$4,703
$4,703
-$83,772
-
-
$4,820
$4,820
-$78,952
-
-
$4,939
$4,939
-$74,013
-
-
$5,062
$5,062
-$68,951
-
-
$5,187
$5,187
-$63,764
-
-
$5,315
$5,315
-$58,449
-
-
$5,446
$5,446
-$53,003
-
-
$5,581
$5,581
-$47,422
-
-
$5,718
$5,718
-$41,704
-
-
$5,859
$5,859
-$35,845
-
-
$6,003
$6,003
-$29,842
-
-
$6,150
$6,150
-$23,692
-
-
$6,301
$6,301
-$17,391
-
-
$6,455
$6,455
-$10,936
-
-
$6,613
$6,613
-$4,322
-
-
$6,775
$6,775
$2,453
-
-
$6,940
$6,940
$9,393
-
-
$7,109
$7,109
$16,502
-
-
$7,282
$7,282
$23,785
-
-
$7,459
$7,459
$31,244
-
-
$7,641
$7,641
$38,885
-
-
$7,826
$7,826
$46,710
-
-
$8,015
$8,015
$54,726
-
-
$8,209
$8,209
$62,935
-
-
$8,407
$8,407
$71,342
-
-
$8,610
$8,610
$79,952
-
-
$8,817
$8,817
$88,769
-
-
$9,029
$9,029
$97,799
-
-
$9,246
$9,246
$107,045
Totals:
-$100,526
$7,462
$200,109
$107,045
-
Prepared By: Gregory King
P: (914) 844-1720
E: gking@crotonenergy.com
Date: 4/5/2022
Jinko 410
jinkosolar.us
KEY FEATURES
390-410 Watt
MONO PERC HALF CELL MODULE
12 Year Product Warranty 25 Year Linear Power Warranty
LINEAR PERFORMANCE WARRANTY
Eagle 72HM G2
Nomenclature:
JKM410M-72HL-V
Code
Cell
null
Full
H
Half
Code
Cell
null
Normal
L
Diamond
Positive power tolerance of 0~+3%
Code
Certification
null
1000V
V
1500V
High Voltage
UL and IEC 1500V certified; lowers BOS costs and yields better LCOE
1500V
Diamond Cell Technology
Uniquely designed high performance 5 busbar mono PERC half cell
IEC61215,IEC61730 certified products
UL1703 certified products
ISO9001:2008 Quality Standards
ISO14001:2004 Environmental Standards
OHSAS18001 Occupational Health & Safety Standards
PID FREE
Certified for high snow (5400Pa) and wind (2400 Pa) loads
Strength and Durability
Reinforced cell prevents potential induced degradation
Higher Module Power
Decrease in current loss yields higher module efficiency
Shade Tolerance
More shade tolerance due to twin arrays
years
Guaranteed Power Performance
linear performance warranty
Standard performance warranty
Additional value from Jinko Solar’s linear warranty
83.1%
90%
97.5%
100%
-40
~+85
1500VDC(UL)/1500VDC(IEC)
SPECIFICATIONS
CAUTION: READ SAFETY AND INSTALLATION INSTRUCTIONS BEFORE USING THE PRODUCT.
© Jinko Solar Co., Ltd. All rights reserved. Specifications included in this datasheet are subject to change without notice.
JKM390-410M-72HL-V-A2-US
20A
-0.36%/
-0.28%/
0.048%/
45±2
-50
-25
Temperature Dependence
of Isc,Voc,Pmax
E
s
g
n
i
w
a
r
D
g
n
ir
e
e
n
i
g
n
E
lectrical Performance & Temperature Dependence
Mechanical Characteristics
H
0.5mm
+
2008 2mm (79.06”)
+
952±2mm (37.48”)
952±2mm (37.48”)
860±1mm (33.86”)
400±1mm (15.75”)
1360±1mm (53.54”)
1002 2mm (39.45”)
+
JKM390M-72HL-V
JKM410M-72HL-V
JKM405M-72HL-V
JKM400M-72HL-V
JKM395M-72HL-V
0~+3%
R4.5
R3.5
6.5
5.5
12AWG,(+)1400mm(55.12in),
(-)1400mm(55.12in)orCustomizedLength
(Twopallets=Onestack)
26pcs/pallet,52pcs/stack,572pcs/40'HQContainer
Packaging Configuration
(Twopallets=Onestack)
27pcs/pallet,54pcs/stack,594pcs/40'HQContainer
Packaging Configuration
MonoPERCDiamondCell(158.75x158.75mm)
144(6×24)
22.5kg(49.6lbs)
2008×1002×40mm(79.06×39.45×1.57inch)
ModuleType
MaximumPower(Pmax)
MaximumPowerVoltage(Vmp)
MaximumPowerCurrent(Imp)
Open-circuitVoltage(Voc)
Short-circuitCurrent(Isc)
ModuleEfficiencySTC(%)
OperatingTemperature(℃)
MaximumSystemVoltage
MaximumSeriesFuseRating
PowerTolerance
TemperatureCoefficientsofPmax
TemperatureCoefficientsofVoc
TemperatureCoefficientsofIsc
NominalOperatingCellTemperature(NOCT)
Current-Voltage & Power-Voltage
Curves (390W)
No.ofHalf-cells
19.38%
390Wp
41.1V
9.49A
49.3V
10.12A
294Wp
7.54A
39.1V
48.0V
8.02A
19.88%
400Wp
41.7V
9.60A
49.8V
10.36A
302Wp
7.66A
39.6V
48.5V
8.16A
19.63%
395Wp
41.4V
9.55A
49.5V
10.23A
298Wp
7.60A
39.3V
48.2V
8.09A
20.13%
405Wp
42.0V
9.65A
50.1V
10.48A
306Wp
7.72A
39.8V
48.7V
8.22A
20.38%
410Wp
42.3V
9.69A
50.4V
10.60A
310Wp
7.76A
40.0V
48.9V
8.26A
INVERTERS
Three Phase Inverter
with Synergy Technology
for the 208V Grid for North America
SE43.2KUS
Specifically designed to work with power optimizers
Easy two-person installation – each unit
mounted separately, equipped with cables
for simple connection between units
Balance of System and labor reduction
compared to using multiple smaller string
inverters
Independent operation of each unit enables
higher uptime and easy serviceability
No wasted ground area: wall/rail mounted,
or horizontally mounted under the modules
(10 ̊ inclination)
Integrated arc fault protection and rapid
shutdown for NEC 2014 and 2017, per article
690.11 and 690.12
Built-in module-level monitoring with Ethernet
or cellular GSM
Fixed voltage inverter for superior efficiency
(97%) and longer strings
Integrated DC Safety Switch and optional surge
protection
Built-in RS485 Surge Protection, to better
withstand lightning events
solaredge.com
12-20
YEAR
WARRANTY
SE43.2KUS
OUTPUT
Rated AC Power Output
VA
Maximum AC Power Output
VA
AC Output Line Connections
4-wire WYE (L1-L2-L3-N) plus PE or 3 wire Delta
AC Output Voltage Minimum-Nominal-Maximum(1) (L-N)
105-120-132.5
Vac
AC Output Voltage Minimum-Nominal-Maximum(1) (L-L)
183-208-229
Vac
AC Frequency Min-Nom-Max(1)
59.3 - 60 - 60.5
Hz
Maximum Continuous Output Current (per Phase) @208V
A
GFDI Threshold
A
Utility Monitoring, Islanding Protection, Configurable Power Factor,
Country Configurable Thresholds
Yes
INPUT
Maximum DC Power (Module STC), Inverter / Unit
58200 / 19400
W
Transformer-less, Ungrounded
Yes
Maximum Input Voltage DC to Gnd
Vdc
Maximum Input Voltage DC+ to DC-
Vdc
Nominal Input Voltage DC to Gnd
Vdc
Nominal Input Voltage DC+ to DC-
Vdc
Maximum Input Current
Adc
Maximum Input Short Circuit Current
Adc
Reverse-Polarity Protection
Yes
Ground-Fault Isolation Detection
350kΩ Sensitivity per Unit
CEC Weighted Efficiency
%
Nighttime Power Consumption
< 12
W
ADDITIONAL FEATURES
Supported Communication Interfaces
RS485, Ethernet, Cellular GSM (optional)
Rapid Shutdown
NEC2014 and NEC2017 compliant/certified, upon AC Grid Disconnect
RS485 Surge Protection
Built-in
DC SAFETY SWITCH
DC Disconnect
1000V / 3 x 40A
DC Surge Protection
Optional, Type II, field replaceable
STANDARD COMPLIANCE
Safety
UL1741, UL1741 SA, UL1699B, UL1998, CSA 2.22
Grid Connection Standards
IEEE 1547, Rule 21, Rule 14 (HI)
Emissions
FCC part15 class A
INSTALLATION SPECIFICATIONS
Number of units
AC Output Conduit Size / Max AWG / Max PE AWG
2” / 4/0 / 4
DC Output Conduit Size / Terminal Block AWG Range /
Number of Strings(2)
2 x 1.25” / 6-14 / 9 strings
Dimensions (H x W x D)
Primary Unit: 37 x 12.5 x 10.5 / 940 x 315 x 260;
Secondary Unit: 21 x 12.5 x 10.5 / 540 x 315 x 260
in / mm
Weight
Primary Unit: 105.8 / 48; Secondary Unit 99.2 / 45
lb / kg
Operating Temperature Range
-40 to +140 / -40 to +60(3)
̊F / ˚C
Cooling
Fan (user replaceable)
Noise
< 60
dBA
Protection Rating
NEMA 3R
Bracket Mounted (Brackets Provided)
(1) For other regional settings please contact SolarEdge support
(2) Single input option per unit (up to 3AWG) available
(3) For power de-rating information refer to: https://www.solaredge.com/sites/default/files/se-temperature-derating-note-na.pdf
Three Phase Inverter with Synergy
Technology for the 208V Grid for North America
SE43.2KUS
© SolarEdge Technologies, Inc. All rights reserved. SOLAREDGE, the SolarEdge logo, OPTIMIZED BY SOLAREDGE are trademarks or registered trademarks of SolarEdge Technologies, Inc. All
other trademarks mentioned herein are trademarks of their respective owners. Date: 10/2018/V02/ENG NA. Subject to change without notice.